Commercial Building Permit in Unincorporated Summit County, Utah
Required for new commercial building construction in unincorporated Summit County, including the Snyderville Basin (Silver Creek, Pinebrook, Jeremy Ranch, Summit Park) and the East Side/3-Mile/Henefer-area unincorporated communities. Construction and structural plans must be drafted by an architect licensed in the state of Utah. All applications are submitted and reviewed through the EPROCESS360 online portal, per the County's 'New Commercial Checklist' (current as of 6/2026).
Verified 2026-07-23 · Source
When you need this permit
- New commercial building construction on a permitted, properly zoned lot in unincorporated Summit County
- Construction may not commence until a valid building permit is obtained from the County Building Official (Summit County Development Code § 10-3-20)
- Architectural and Structural Plans must be combined into one PDF and drafted by an Architect licensed in the state of Utah — per the County's New Commercial Checklist (6/2026), unlike the residential owner-builder allowance Owner-builder
- Site Plan showing scale, north arrow, property lines, topography, defensible space for fire (if required), proposed and existing buildings, driveway location, building setbacks, street name/location, easements, utility locations, retaining walls, and hard surface areas
- COMcheck (lighting and mechanical) energy code compliance documentation
- Geotechnical Report required prior to any boring/trenching/digging; a separate County engineering permit must be obtained before this work begins
- Commercial Project Engineering Review Checklist compliance for site civil elements — roadway/parking design, utility design, grading design, drainage design (per Summit County Code § 9-3-11), and erosion control/SWPPP — reviewed by the Summit County Engineering Division
- A separate right-of-way permit (via the County's online portal) is required for any work — closures, excavations, structures — within County rights-of-way
- A Long-Term Stormwater Management Plan may be required if the project disturbs more than 1 acre; a Noxious Weed Plan is required if the project disturbs more than a quarter acre (10,890 sq ft) and imports soil and/or exports more than 10 cubic yards of soil
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 11 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Grade (Engineering)
Must be completed by Summit County Engineering prior to footing inspection
- 2
Footing / Foundation
Geotechnical report must be provided at time of footing inspection
- 3
Certificate of Elevation/Survey Inspection
Required prior to shear/framing inspection when indicated on the approved plan by planning/zoning. Performed by a planner in-office, not on-site.
- 4
4-Way Inspection
Windows, fireplaces, and furnaces must be installed before this inspection. Gas line and Power-to-Panel inspections are performed only after 4-way (gas lines must be under test pressure; minimum two 20-amp GFCI-protected circuits required for power-to-panel).
- 5
Weather Barrier
Windows must be installed and all exterior wall penetrations completed prior to this inspection
- 6
Insulation (incl. Spray-Applied)
Spray-applied (closed/open cell foam) insulation must be inspected before additional insulation covers it; allow 24 hours ventilation prior to inspection
- 7
Fire District Inspection
The local fire district should complete its inspection prior to the building department's final; commonly performed at 4-way and final. Scheduled directly with the applicable fire district, not through EPROCESS360.
- 8
Final Building and Final Engineering
Both required prior to Certificate of Occupancy for new construction
See the full Unincorporated Summit County inspection guide — scheduling & re-inspection fees →
Tips
- Unlike residential permits, commercial construction plans (architectural and structural) must be drafted by an architect licensed in the state of Utah — there is no owner-builder equivalent for commercial projects. Owner-builder
- Re-chased 2026-07-23: the Building Permit Fee rate IS published — Ordinance 834-P item 2 sets a flat 0.0075 (3/4 of 1%) of construction valuation, $100 minimum, for both commercial and residential permits, applied to a valuation figure taken from the County's published ICC Building Valuation Data (BVD) table. A $200 Plan Review Deposit is due for new structures. Contact the Building Department at (435) 336-3124 for a project-specific total, since the exact final figure is only assessed inside EPROCESS360 once plan review completes.
- Commercial projects also go through a separate Summit County Engineering Division review (Commercial Project Engineering Review Checklist) covering roadway/parking, utility, grading, drainage, and erosion-control design — budget extra lead time for civil plan coordination alongside the building permit review.
- Projects disturbing more than 1 acre may require a Long-Term Stormwater Management Plan (contact the Stormwater Department); projects disturbing more than a quarter acre while importing soil or exporting more than 10 cubic yards require a Noxious Weed Plan.
- A separate right-of-way permit, applied for through the County's online permit portal, is required for any work (closures, excavations, structures) within County rights-of-way — this is in addition to the building permit.
- All submissions, reviews, and issuance are processed exclusively through the EPROCESS360 online portal (summit.co.ut.eprocess360.com) — the County does not accept paper plans or perform over-the-counter reviews.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Summit County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Summit County.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Unincorporated Summit County
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →