Sign Permit in Washington City, Utah
Required in Washington City to paint, mark, post, or otherwise affix a sign to any public or private land or structure, or to physically change/modify an existing sign to add new or additional features, per Washington City Code § 9-18-6 (Chapter 18, Signs). Governed by a dedicated sign chapter of the zoning title rather than folded silently into the building permit. Per § 9-18-6(D), the application is assessed a 'planning review fee' plus a fee under the Building Permit Fee Table; the city's published Planning-Zoning-Economic Development fee schedule (the Master Fee Schedule's 'Maps/Land Use' tab, 'CUP, BOA & MISC.' section) lists that planning review fee by name — 'Sign Permit ... $35.00' — with a separate 'Conditional Use Permit - Signs ... $100.00' line for signs not specifically allowed under Chapter 18 and therefore requiring a conditional use permit per Title 9, Chapter 17.
Verified 2026-07-20 · Source
When you need this permit
- Application submitted to the city on the city standard building permit form, per § 9-18-6(C)
- Associated site plan and building elevation plans showing the locations, dimensions, materials, colors, and copy of all existing and proposed signs, per § 9-18-6(C)
- Signs not specifically allowed under Chapter 18 require a conditional use permit, processed per the procedures in Title 9, Chapter 17
- No sign may be located on or project over publicly owned land or inside existing/planned street rights of way identified in the city transportation master plan, per § 9-18-6(A)
- Certain small, non-advertising signs on private property are exempt from the permit requirement, per § 9-18-15 — e.g., on-premises directional/instructional signs (max 4 sq ft, 4 ft height), no trespassing/no dumping signs (max 16 sq ft for a single sign, or up to 4 signs at 4 sq ft each per lot), and neighborhood identification signs/walls bearing only the neighborhood name and/or address
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Washington City inspection guide — scheduling & re-inspection fees →
Tips
- A sign permit in Washington City is valid for 180 days from the time it is obtained; the zoning administrator may extend it if substantial effort toward completion is shown, per § 9-18-6(C).
- Illuminated signs that let light penetrate beyond the property line so as to constitute a nuisance are subject to a public hearing before the Planning Commission if a neighboring owner or tenant complains, per § 9-18-6(E).
- Any handbill or sign posted on public property in violation of Chapter 18 may be removed by a city official, and the responsible party is liable for the removal cost, per § 9-18-6(B).
- Small non-advertising signs (on-premises directional/instructional, no trespassing/no dumping, and neighborhood identification signs/walls) are exempt from the permit requirement on private property, per § 9-18-15 — but off-premises or advertising signage is not covered by this exemption.
- The sign permit's $35.00 planning review fee is separate from, and smaller than, the $100.00 Conditional Use Permit - Signs fee that applies only when the proposed sign isn't specifically allowed under Chapter 18 — most standard signs need only the $35.00 fee (plus a building-permit-schedule fee if construction is triggered).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Washington City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Washington City
Sign Permit in other cities
Compare sign permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Washington City project checklist
Describe your project once and get every permit, document, and fee it triggers in Washington City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →