Certificate of Occupancy / Change of Use Permit — Washington City, Utah · Requirements sheet
Verified 2026-07-22 · Source: https://codelibrary.amlegal.com/codes/washingtonut/latest/washington_ut/0-0-0-5611
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Certificate of Occupancy / Change of Use Permit in Washington City, Utah
Governed by Washington City Code § 9-2-11 (Occupancy Permit). A certificate of occupancy (CO) must be issued by the city official charged with administering and enforcing the zoning title before occupancy of any building 'hereafter erected, enlarged or structurally altered,' before any vacant land (other than for permitted agricultural uses) is occupied or used, and — the change-of-use trigger — 'whenever the character or use of any building or land is proposed to be changed from one use to another use.' Washington City's own site publishes no distinct online application, form, or fee specifically for a pure change-of-use CO (one not accompanying new construction); for new construction and additions, CO issuance is folded into the Commercial/Residential Building Permit's final-inspection process already documented elsewhere in this file.
Verified 2026-07-22 · Source
When you need this permit
- A certificate of occupancy is required prior to occupancy of any building hereafter erected, enlarged, or structurally altered, per Washington City Code § 9-2-11(A)
- A certificate of occupancy is required when vacant land is proposed to be occupied or used, except for permitted agricultural uses, per § 9-2-11(A)
- A certificate of occupancy is required whenever the character or use of any building or land is proposed to be changed from one use to another use, per § 9-2-11(A) — this is the change-of-use trigger
- For an existing lawful use (including nonconforming buildings and uses) already in place as of the code's effective date, a certificate of occupancy is issued upon written request from the owner, per § 9-2-11(B)
- For new construction, additions, or common area buildings, CO release additionally requires final inspection and sign-off from Building, Planning, Fire, Public Works, Power, and Parks Departments and St. George Treatment, plus four uploaded certifications (Soils Compliance, Insulation, Stucco, Termite) — see the Commercial Building Permit entry in this file
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Washington City inspection guide — scheduling & re-inspection fees →
Tips
- Washington City Code § 9-2-11 requires a certificate of occupancy whenever a building or land's use changes from one use to another — this applies even without any new construction, though the city publishes no distinct online change-of-use application separate from the written-request process in § 9-2-11(B).
- If your change of use involves construction, alteration, or enlargement, the CO is issued through the standard Building Permit process (with final sign-off from Building, Planning, Fire, Public Works, Power, and Parks) rather than a standalone change-of-use filing — see this file's Commercial Building Permit entry for the four required certifications (Soils Compliance, Insulation, Stucco, Termite).
- For a purely administrative change of use with no construction, Washington City Code only specifies a written request from the owner (§ 9-2-11(B)) — no online form, fee schedule line item, or published turnaround time was found for this path; contact the Building Department directly at (435) 656-6326 before assuming a self-service process exists.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Washington City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Washington City
Certificate of Occupancy / Change of Use Permit in other cities
Compare certificate of occupancy / change of use permit fees across Utah →
Look up this fee in a different city →