Skip to main content
PermitBase

Certificate of Occupancy / Change of Use Permit in Washington City, Utah

Governed by Washington City Code § 9-2-11 (Occupancy Permit). A certificate of occupancy (CO) must be issued by the city official charged with administering and enforcing the zoning title before occupancy of any building 'hereafter erected, enlarged or structurally altered,' before any vacant land (other than for permitted agricultural uses) is occupied or used, and — the change-of-use trigger — 'whenever the character or use of any building or land is proposed to be changed from one use to another use.' Washington City's own site publishes no distinct online application, form, or fee specifically for a pure change-of-use CO (one not accompanying new construction); for new construction and additions, CO issuance is folded into the Commercial/Residential Building Permit's final-inspection process already documented elsewhere in this file.

Verified 2026-07-22 · Source

When you need this permit

  • A certificate of occupancy is required prior to occupancy of any building hereafter erected, enlarged, or structurally altered, per Washington City Code § 9-2-11(A)
  • A certificate of occupancy is required when vacant land is proposed to be occupied or used, except for permitted agricultural uses, per § 9-2-11(A)
  • A certificate of occupancy is required whenever the character or use of any building or land is proposed to be changed from one use to another use, per § 9-2-11(A) — this is the change-of-use trigger
  • For an existing lawful use (including nonconforming buildings and uses) already in place as of the code's effective date, a certificate of occupancy is issued upon written request from the owner, per § 9-2-11(B)
  • For new construction, additions, or common area buildings, CO release additionally requires final inspection and sign-off from Building, Planning, Fire, Public Works, Power, and Parks Departments and St. George Treatment, plus four uploaded certifications (Soils Compliance, Insulation, Stucco, Termite) — see the Commercial Building Permit entry in this file

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Certificate of Occupancy / Change of UseThe Washington City Building Department Master Fee Schedule was checked directly on both its Building Permit Fee Table A/B tab and its Planning-Zoning-Economic Development 'Maps/Land Use' tab (CUP, BOA & MISC. section) — neither publishes a 'Certificate of Occupancy' or 'Change of Use' line item. Where a change of use accompanies new construction, the CO is released as part of the same valuation-based Building Permit Fee Table process documented in this file's Building Permit entries. For a pure change of use with no construction, no fee was found published anywhere on the city's site — a genuine gap, not an estimate; confirm directly with the Building Department at (435) 656-6326.
No standalone fee found

Review timeline

Plan review
Not published — contact the department

How long did your Certificate of Occupancy / Change of Use Permit permit actually take in Washington City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Washington City inspection guide — scheduling & re-inspection fees →

    Tips

    • Washington City Code § 9-2-11 requires a certificate of occupancy whenever a building or land's use changes from one use to another — this applies even without any new construction, though the city publishes no distinct online change-of-use application separate from the written-request process in § 9-2-11(B).
    • If your change of use involves construction, alteration, or enlargement, the CO is issued through the standard Building Permit process (with final sign-off from Building, Planning, Fire, Public Works, Power, and Parks) rather than a standalone change-of-use filing — see this file's Commercial Building Permit entry for the four required certifications (Soils Compliance, Insulation, Stucco, Termite).
    • For a purely administrative change of use with no construction, Washington City Code only specifies a written request from the owner (§ 9-2-11(B)) — no online form, fee schedule line item, or published turnaround time was found for this path; contact the Building Department directly at (435) 656-6326 before assuming a self-service process exists.

    Frequently asked questions

    Washington City requires a certificate of occupancy / change of use permit for: A certificate of occupancy is required prior to occupancy of any building hereafter erected, enlarged, or structurally altered, per Washington City Code § 9-2-11(A); A certificate of occupancy is required when vacant land is proposed to be occupied or used, except for permitted agricultural uses, per § 9-2-11(A); A certificate of occupancy is required whenever the character or use of any building or land is proposed to be changed from one use to another use, per § 9-2-11(A) — this is the change-of-use trigger; For an existing lawful use (including nonconforming buildings and uses) already in place as of the code's effective date, a certificate of occupancy is issued upon written request from the owner, per § 9-2-11(B); For new construction, additions, or common area buildings, CO release additionally requires final inspection and sign-off from Building, Planning, Fire, Public Works, Power, and Parks Departments and St. George Treatment, plus four uploaded certifications (Soils Compliance, Insulation, Stucco, Termite) — see the Commercial Building Permit entry in this file. If your project isn't listed, confirm with Washington City Building Department at (435) 656-6326 before starting work.

    None was found published. The city's Master Fee Schedule has no distinct Certificate of Occupancy or Change of Use line item on either its Building Permit Fee Table or its Planning/Zoning fee tab. Where the change of use accompanies construction, the CO is released through the same valuation-based Building Permit fee process; for a pure change of use with no construction, contact the Building Department at (435) 656-6326 to confirm current requirements.

    Washington City does not publish a plan-review timeline for this permit. Contact Washington City Building Department at (435) 656-6326 for current turnaround.

    You'll need: Written Request for Certificate of Occupancy (existing use). Depending on your project, Washington City may also ask for: Building Permit Application (new construction / change accompanied by construction). See the required-documents checklist on this page for details on each.

    Apply through Washington City Building Department at 111 N 100 E, Washington, UT 84780. Phone: (435) 656-6326. Office hours: Mon–Thu 7:30am–5:30pm, Fri 8am–Noon. Official information: https://washingtonutah.gov/development/building.

    Washington City, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a). Washington City Building Department's own 'Climatic and Geographic Design Criteria' notice was live-checked 2026-07-16 (raw HTML, not an AI summary) and STILL displays '2021 IBC' — the city page has NOT been updated to reflect the statewide 7/1/2026 transition; 2021 Utah State Residential Code (based on IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment. Washington City's own page (live-checked 2026-07-16) correctly still shows '2021 UTAH STATE RESIDENTIAL CODE'; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized on Washington City's own page, added here per statute; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d). Washington City's own page was live-checked 2026-07-16 and STILL displays '2021 IPC' — the city page has NOT been updated; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e). Washington City's own page was live-checked 2026-07-16 and STILL displays '2021 IMC' — the city page has NOT been updated; 2024 International Fuel Gas Code (IFGC, listed on city page as 'IFCI') — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f). Washington City's own page was live-checked 2026-07-16 and STILL displays '2021 IFCI' — the city page has NOT been updated; 2023 National Electrical Code (NEC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 amendment. Washington City Building Department page explicitly updated 'MAY 7 2025 UPDATE OF ADOPTED CODES BY THE STATE OF UTAH: 2023 NEC code update' (superseding the previously listed 2020 NEC, still shown struck-through/superseded on the live page as of 2026-07-16); this is one of the few Washington County-area jurisdiction pages independently confirmed current on the electrical code edition, not just inferred from state law; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h). Washington City's own page was live-checked 2026-07-16 and STILL displays '2021 IECC' — the city page has NOT been updated; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n). Washington City's own page was live-checked 2026-07-16 and STILL displays '2021 ISPSC', and the city's Swimming Pool permit instructions (ISPSC sections 305.3.3/305.3.4, 807, 809, 323) likewise still cite the 2021 edition — the city has NOT updated either page; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); NOT listed at all on Washington City's own Building Department page (live-checked 2026-07-16), added here per statute since the City's own materials omit it entirely; ICC A117.1-2009 or 2017 (Accessibility Standard) — listed on Washington City Building Department page; not part of Utah Code § 15A-2-103's construction-code list, left unchanged; 2018 IBC construction-type valuation table (ICC Building Valuation Data) — used directly in the city's own published 'Square Foot Construction Costs Table B' on its fee schedule; a fee-calculation reference table, not a code edition, left unchanged; NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Washington City's own Building Department page ('Climatic and Geographic Design Criteria' notice) was independently re-fetched 2026-07-16 (raw HTML, not an AI summary, to guard against summarizer fabrication) and STILL displays 2021 editions for IBC/IMC/IPC/IFCI(IFGC)/IECC/ISPSC — confirmed NOT updated to reflect the statutory transition, unlike its NEC line which was separately updated in May 2025. This file now states the governing statutory codes (2024/2021/2023 editions per subsection) as current per Utah's statewide-mandatory code regime (Utah Code § 15A-1-204), while preserving the City's own (lagging) page text above as historical/local-document context. The Utah Code § 15A-2-103 citation in the sources array below has been updated to the current in-force version link. Local amendments apply — see the Washington City overview page for the full list.

    Yes. Washington City Code § 9-2-11 requires a certificate of occupancy whenever 'the character or use of any building or land is proposed to be changed from one use to another use,' in addition to before occupying newly erected, enlarged, or structurally altered buildings and previously vacant land (except permitted agricultural uses).

    Per Code § 9-2-11(B), upon written request from the owner, the city will issue a certificate of occupancy covering any lawful use of a building or premises already in existence, including nonconforming buildings and uses.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-22.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Washington City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.