Accessory Dwelling Unit (ADU) — Washington City, Utah · Requirements sheet
Verified 2026-07-03 · Source: https://washingtoncity.org/development/building/ResidentialDetachedAccessory
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Accessory Dwelling Unit (ADU) in Washington City, Utah
Required for construction of a secondary dwelling unit in Washington City. Qualification is governed by Washington City Ordinance #2019-25, which the city's own permit page instructs applicants to review before designing plans.
Verified 2026-07-03 · Source
When you need this permit
- Property must qualify under Washington City Ordinance #2019-25 — contact Planning and Zoning at (435) 656-6325 before creating plans
- Accessory Dwelling Unit Deed Restriction — must be completed, notarized, and recorded at the Washington County Assessor's office; the recorded document is uploaded with the permit application
- Site plan showing lot layout, setbacks, easements, topographical details (if slope >10%), utilities, and nearest hydrant location
- Defensible space provisions per the Utah Wildland Urban Interface Code (adopted under Utah Code § 15A-2-103), if required
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation
Footings, forms, rebar before concrete pour
- 2
Framing
Structure and fire separation from primary unit
- 3
Final
All work complete, deed restriction on file, ready for occupancy
See the full Washington City inspection guide — scheduling & re-inspection fees →
Tips
- Before designing plans, confirm your property qualifies for an ADU under Washington City Ordinance #2019-25 by calling Planning and Zoning at (435) 656-6325 — the city's own instructions emphasize doing this FIRST.
- The ADU Deed Restriction must be recorded at the Washington County Assessor's office, not merely notarized — recording is a prerequisite step, not just paperwork.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Washington City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Washington City
Accessory Dwelling Unit (ADU) in other cities
Compare accessory dwelling unit (adu) fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Washington City project checklist
Describe your project once and get every permit, document, and fee it triggers in Washington City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →