Solar Panel Permit in Washington City, Utah
Required for solar photovoltaic installation in Washington City. Washington City imposes two local prerequisites not found in the sibling St. George or Washington County files: installer pre-approval by the Washington City Power Department, and mandatory third-party plan pre-approval.
Verified 2026-07-19 · Source
When you need this permit
- Installer must be an approved installer with the Washington City Power Department PRIOR to submitting for permit (required as of May 15, 2023)
- All plans must be pre-approved by an approved third-party reviewer PRIOR to submitting for permit (required as of July 1, 2023)
- Renewable Resource Agreement (RRA) with original notarized property-owner signature required for properties in the Washington City Power service area
- Properties in the Dixie Power service area instead require a Dixie Power Net Meter Agreement
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Washington City's Solar Permit Submittal Requirements page (washingtonutah.gov/development/building/solarpermitrequirements — the former washingtoncity.org address 301-redirects to the same page on… Show full citationHide
Washington City's Solar Permit Submittal Requirements page (washingtonutah.gov/development/building/solarpermitrequirements — the former washingtoncity.org address 301-redirects to the same page on the washingtonutah.gov domain) requires a 'Valuation' field correlated to the RRA project cost but publishes no separate flat solar-specific fee. Solar is assessed on the same valuation-based Building Permit Fee Table as other permit types.Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, lockable disconnect placement before energizing
- 2
Final
Panel mounting, electrical connections, and point of utility connection verified
See the full Washington City inspection guide — scheduling & re-inspection fees →
Tips
- Washington City requires solar installers to be pre-approved by the Washington City Power Department (435-656-6329) before they can even submit a permit application — this is a local requirement not seen in the sibling St. George or Washington County files.
- Washington City additionally requires all solar plans to be pre-approved by an approved third-party reviewer before permit submittal, effective July 1, 2023.
- The original notarized Renewable Resource Agreement must be physically delivered to the Washington City Power Department — a digital signature (docu-sign) is explicitly not accepted.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Applications & forms
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Washington City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Washington City's permit history is searchable by address
359 permits on record for Washington City, 1971–2022 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
Other permits in Washington City
Solar Panel Permit in other cities
Compare solar panel permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Washington City project checklist
Describe your project once and get every permit, document, and fee it triggers in Washington City — in one checklist. Free, for any city and any number of projects.
Get started →