EV Charger / EVSE Permit — Washington City, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://washingtoncity.org/development/building/simplepermit
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Washington City, Utah
Washington City has not published a distinct EV-charger fee category. EV charger/EVSE installation is treated as standard electrical work filed under the city's 'Simple Permit' category: the official Simple Permit Requirements page instructs applicants to select 'ELECTRICAL' as the permit type, lists example projects (generators, water heater replacement, HVAC equipment upgrades, electrical meter upgrades, gas line additions) with no distinct EV-charger or electric-vehicle-charging line item, and assesses the same valuation-based Building Permit Fee Table used for other Simple Permit work.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property, filed as an 'Electrical' Simple Permit
- Washington City or current Business License number required for Builder and all Subcontractors
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final
Equipment installed and operational, scheduled through the Builder Account on CityInspect
See the full Washington City inspection guide — scheduling & re-inspection fees →
Tips
- Washington City has no dedicated EV-charger permit or fee category — select 'ELECTRICAL' when filing a Simple Permit for EV charger/EVSE installation; the fee is the same valuation-based Building Permit Fee Table used for generators, water heater replacements, and other Simple Permit electrical work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Washington City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Washington City
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Washington City project checklist
Describe your project once and get every permit, document, and fee it triggers in Washington City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →