Residential Building Permit (Single Family) — Washington City, Utah · Requirements sheet
Verified 2026-07-03 · Source: https://washingtoncity.org/development/building/buildingfeeschedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (Single Family) in Washington City, Utah
Required for new single-family residential construction in Washington City. Governed by the 2021 Utah State Residential Code. Fees are valuation-based per Washington City's own published Building Permit Fee Table (a distinct, current ICC-style fee schedule — not St. George's 1997 UBC scale or Washington County's identical-to-St.-George scale).
Verified 2026-07-03 · Source
When you need this permit
- New single-family residential construction
- Submitted through the Washington City CityInspect Builder Account portal
- New Single Family permits use the city's 'Packet Review' process — all reviewing departments (building, planning, power, public works, fire) review concurrently and either approve or return the packet for corrections
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts
- 2
Framing
After framing, sheathing, and rough-in MEP — before insulation or wall cover
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete — inspections scheduled through the Builder Account on CityInspect
See the full Washington City inspection guide — scheduling & re-inspection fees →
Tips
- Washington City uses its own current, ICC-style valuation-based Building Permit Fee Table — this is NOT the same as St. George's or unincorporated Washington County's 1997 Uniform Building Code fee scale, despite all three jurisdictions sharing the same county.
- New Single Family and New Commercial permits go through Washington City's 'Packet Review' process: all reviewing departments (building, planning, power, public works, fire) review concurrently in the CityInspect portal, and corrections must be viewed (not edited) until all departments have completed their pass.
- Construction hours in Washington City are 6am–10pm Monday through Sunday, with a 3am start time allowed for concrete pours from April through October.
- Plan review fee is 45% of the calculated building permit fee, per Washington City's own fee schedule — confirm this differs from neighboring St. George's 65% rate before assuming parity.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Washington City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Washington City
Residential Building Permit (Single Family) in other cities
Compare residential building permit (single family) fees across Utah →
Look up this fee in a different city →
Now live
Build your Washington City project checklist
Describe your project once and get every permit, document, and fee it triggers in Washington City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →