Skip to main content
PermitBase

Residential Building Permit (Single Family) in Washington City, Utah

Required for new single-family residential construction in Washington City. Governed by the 2021 Utah State Residential Code. Fees are valuation-based per Washington City's own published Building Permit Fee Table (a distinct, current ICC-style fee schedule — not St. George's 1997 UBC scale or Washington County's identical-to-St.-George scale).

Verified 2026-07-03 · Source

When you need this permit

  • New single-family residential construction
  • Submitted through the Washington City CityInspect Builder Account portal
  • New Single Family permits use the city's 'Packet Review' process — all reviewing departments (building, planning, power, public works, fire) review concurrently and either approve or return the packet for corrections

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit — valuation $1.00 to $1,000.00
Washington City Building Department Master Fee Schedule (published Google Sheets PDF linked from washingtoncity.org/development/building/buildingfeeschedule). Show full citationWashington City Building Department Master Fee Schedule (published Google Sheets PDF linked from washingtoncity.org/development/building/buildingfeeschedule). This fee table is Washington City's own — a current ICC-style valuation table, distinct from the 1997 UBC scale used by St. George and unincorporated Washington County.
$30.00
Building Permit — valuation $2,001 to $3,000Washington City Building Department Master Fee Schedule
$62.43
Building Permit — valuation $10,001 to $11,000Washington City Building Department Master Fee Schedule
$152.43
Building Permit — valuation $25,001 to $26,000Washington City Building Department Master Fee Schedule
$317.33
Building Permit — valuation $50,001 to $51,000Washington City Building Department Master Fee Schedule
$499.81
Building Permit — valuation $99,001 to $100,000Washington City Building Department Master Fee Schedule; the full $1–$100,000 table is tabulated in $1,000 increments in the source document
$738.93
Building Permit — valuation $100,001 to $500,000Washington City Building Department Master Fee Schedule
$738.93 for the first $100,000.00 plus $4.03 for each additional $1,000.00, or fraction thereof, to and including $500,000.00
Building Permit — valuation $500,001 to $1,000,000Washington City Building Department Master Fee Schedule
$2,350.93 for the first $500,000.00 plus $3.44 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00
Building Permit — valuation over $1,000,000Washington City Building Department Master Fee Schedule
$4,070.93 for the first $1,000,000.00 plus $2.42 for each additional $1,000.00, or fraction thereof
Plan Review FeeWashington City Building Department Master Fee Schedule — notably higher than St. George's 65%-of-a-much-smaller-base-fee structure and Washington County's fee approach; a direct like-for-like comparison requires computing both on the same valuation.
45% of the total calculated building permit fee

Review timeline

Plan review
Not published — contact the department

How long did your Residential Building Permit (Single Family) permit actually take in Washington City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts

  2. 2

    Framing

    After framing, sheathing, and rough-in MEP — before insulation or wall cover

  3. 3

    Insulation

    After insulation installed, before drywall

  4. 4

    Final

    All work complete — inspections scheduled through the Builder Account on CityInspect

See the full Washington City inspection guide — scheduling & re-inspection fees →

Tips

  • Washington City uses its own current, ICC-style valuation-based Building Permit Fee Table — this is NOT the same as St. George's or unincorporated Washington County's 1997 Uniform Building Code fee scale, despite all three jurisdictions sharing the same county.
  • New Single Family and New Commercial permits go through Washington City's 'Packet Review' process: all reviewing departments (building, planning, power, public works, fire) review concurrently in the CityInspect portal, and corrections must be viewed (not edited) until all departments have completed their pass.
  • Construction hours in Washington City are 6am–10pm Monday through Sunday, with a 3am start time allowed for concrete pours from April through October.
  • Plan review fee is 45% of the calculated building permit fee, per Washington City's own fee schedule — confirm this differs from neighboring St. George's 65% rate before assuming parity.

Frequently asked questions

Washington City requires a residential building permit (single family) for: New single-family residential construction; Submitted through the Washington City CityInspect Builder Account portal; New Single Family permits use the city's 'Packet Review' process — all reviewing departments (building, planning, power, public works, fire) review concurrently and either approve or return the packet for corrections. If your project isn't listed, confirm with Washington City Building Department at (435) 656-6326 before starting work.

Washington City uses its own valuation-based Building Permit Fee Table, starting at $30.00 for valuation up to $1,000 and scaling to $4,070.93 plus $2.42 per additional $1,000 above $1,000,000. Plan review is 45% of the calculated permit fee. See the city's Building Department Master Fee Schedule PDF.

Washington City does not publish a plan-review timeline for this permit. Contact Washington City Building Department at (435) 656-6326 for current turnaround.

You'll need: Online Permit Application (CityInspect Builder Account); Construction Plans; Builder Valuation. See the required-documents checklist on this page for details on each.

Washington City requires 4 inspection(s) for a residential building permit (single family), in order: Foundation / Footing, Framing, Insulation, Final. Schedule each through Washington City Building Department ((435) 656-6326).

Apply through Washington City Building Department at 111 N 100 E, Washington, UT 84780. Phone: (435) 656-6326. Office hours: Mon–Thu 7:30am–5:30pm, Fri 8am–Noon. Official information: https://washingtonutah.gov/development/building.

Washington City, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a). Washington City Building Department's own 'Climatic and Geographic Design Criteria' notice was live-checked 2026-07-16 (raw HTML, not an AI summary) and STILL displays '2021 IBC' — the city page has NOT been updated to reflect the statewide 7/1/2026 transition; 2021 Utah State Residential Code (based on IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment. Washington City's own page correctly still shows '2021 UTAH STATE RESIDENTIAL CODE'; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized on Washington City's own page, added here per statute; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d). Washington City's own page was live-checked 2026-07-16 and STILL displays '2021 IPC' — the city page has NOT been updated; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e). Washington City's own page was live-checked 2026-07-16 and STILL displays '2021 IMC' — the city page has NOT been updated; 2024 International Fuel Gas Code (IFGC, listed on city page as 'IFCI') — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f). Washington City's own page was live-checked 2026-07-16 and STILL displays '2021 IFCI' — the city page has NOT been updated; 2023 National Electrical Code (NEC) — current; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 amendment. The Washington City Building Department page states it directly: “MAY 7 2025 UPDATE OF ADOPTED CODES BY THE STATE OF UTAH: 2023 NEC code update,” superseding the 2020 NEC still shown struck through on that page. Most Washington County-area jurisdiction pages leave the electrical edition to be inferred from state law; this one states it on the page itself.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h). Washington City's own page was live-checked 2026-07-16 and STILL displays '2021 IECC' — the city page has NOT been updated; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n). Washington City's own page was live-checked 2026-07-16 and STILL displays '2021 ISPSC', and the city's Swimming Pool permit instructions (ISPSC sections 305.3.3/305.3.4, 807, 809, 323) likewise still cite the 2021 edition — the city has NOT updated either page; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); NOT listed at all on Washington City's own Building Department page, added here per statute since the City's own materials omit it entirely; ICC A117.1-2009 or 2017 (Accessibility Standard) — listed on Washington City Building Department page; not part of Utah Code § 15A-2-103's construction-code list, left unchanged; 2018 IBC construction-type valuation table (ICC Building Valuation Data) — used directly in the city's own published 'Square Foot Construction Costs Table B' on its fee schedule; a fee-calculation reference table, not a code edition, left unchanged; Utah Code § 15A-2-103, in the version effective 7/1/2026 (superseded 1/1/2027), makes the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC and residential ISPSC the statewide codes; the IRC (2021) and NEC (2023) did not change. Washington City's own Building Department page (its 'Climatic and Geographic Design Criteria' notice) still displays 2021 editions for the IBC, IMC, IPC, IFGC, IECC and ISPSC — it has not been updated to reflect the statutory transition, unlike its NEC line, which was updated in May 2025. The governing codes are the statutory editions (2024/2021/2023 by subsection) under Utah's statewide-mandatory code regime (Utah Code § 15A-1-204); the City's own page text is preserved above as local-document context. Design to the statutory editions, and confirm with the Building Department before relying on the City page.. Local amendments apply — see the Washington City overview page for the full list.

No. Washington City is its own incorporated municipality with its own Building Department at 111 N 100 E, Washington, UT 84780, phone (435) 656-6326, and its own published fee schedule — a current ICC-style valuation table distinct from both St. George's and Washington County's shared 1997 Uniform Building Code fee scale.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Washington City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Property Access

Washington City's permit history is searchable by address

359 permits on record for Washington City, 1971–2022 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.

Start your 7-day free trial7 days free for new customers, then $79/mo · the guide above stays free