Solar PV (Photovoltaic) Installation Permit in Washington Terrace, Utah

Washington Terrace has not published a distinct solar or solar-PV permit type, application, or fee category. Neither the Building, Planning & Inspection Department page, the Building/Excavation Permit application portal, nor the FY 2026-27 Consolidated Fee Schedule (Resolution 26-08, adopted 6/26) lists a solar, photovoltaic, or renewable-energy line item — the Consolidated Fee Schedule's 'Building Permits - Over-the-Counter' table enumerates only HVAC, Plumbing (inside), Plumbing (outside), Electrical, Gas line, Roofing, Siding, and Window & Door. File a rooftop or ground-mount solar PV installation as a standard Building/Excavation Permit, typically under the 'Electrical' over-the-counter category, since PV work is regulated by the adopted National Electrical Code, Article 690. The fee is governed by the same ICC 'Building Valuation Data'/'Building Permit Fee Schedule' valuation mechanism used for every other building permit here, per Washington Terrace Municipal Code § 15.02.020.

Verified 2026-07-21 · Source

When you need this permit

  • Installation of a residential or commercial rooftop or ground-mount solar photovoltaic (PV) system, filed as a standard Building/Excavation Permit — no separate solar-specific application track exists
  • Work must comply with the adopted National Electrical Code (NEC), which governs solar PV systems under NEC Article 690, per Washington Terrace Municipal Code § 15.04.010(1)(b)
  • Structural components (roof-mount racking, ground-mount support) must comply with the adopted IBC/IRC, per § 15.04.010(1)(a)
  • Obtain any required land use authority approval before permit application, per § 15.02.010(1)
  • Complete building permit application filed with the Chief Building Official, per § 15.02.010(2)
  • Pay building permit fees and any other applicable fee before permit issuance, per § 15.02.010(3) and § 15.02.050(2)(b)
  • Submit required plans and supporting documentation (system layout, electrical single-line diagram, structural/attachment details), per § 15.02.010(4)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Building Permit Fee — valuation-based (ICC Building Valuation Data)
Washington Terrace Municipal Code § 15.02.020 — the same fee mechanism used for every other permit type in this record; Show full citationWashington Terrace Municipal Code § 15.02.020 — the same fee mechanism used for every other permit type in this record; no separate solar-PV valuation or flat fee is published. The FY 2026-27 Consolidated Fee Schedule's Building Permits and Building Permits - Over-the-Counter tables contain no solar or PV line item.
Set by the 'Building Permit Fee Schedule' in the most current adopted code edition, applied to project valuation determined from the ICC 'Building Valuation Data' table.
Plan Review Fee (residential, 1-2 family)
Washington Terrace City FY 2026-27 Consolidated Fee Schedule (Resolution 26-08, adopted 6/26), 'Building Permits (3.2)': '25% Plan review fee on single/multiple family permits.' Applies to residential solar installs; Show full citationWashington Terrace City FY 2026-27 Consolidated Fee Schedule (Resolution 26-08, adopted 6/26), 'Building Permits (3.2)': '25% Plan review fee on single/multiple family permits.' Applies to residential solar installs; commercial installs are billed the 65% commercial rate instead (see Commercial Building Permit entry).
25% of the building permit fee
State SurchargeWashington Terrace Municipal Code § 15.02.040, imposed under Utah Code Ann. § 58-56-9(4).
1% of building permit fee
Reinspection FeeWashington Terrace Municipal Code § 15.02.050(1)(b).
Minimum 1 hour at the hourly rate set in the adopted building code

Review timeline

Plan reviewWashington Terrace’s published plan-review target
14–14 business days

How long did your Solar PV (Photovoltaic) Installation Permit permit actually take in Washington Terrace?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Scheduled through the Washington Terrace Building, Planning & Inspection Department by calling (801) 395-8288 or (801) 393-8681, weekdays 9am-4pm, with 24-hour advance notice required; verifies NEC Article 690 compliance for the PV system's electrical components.

  2. 2

    Building/Structural Inspection

    Verifies roof-mount racking attachment or ground-mount support structure complies with the adopted IBC/IRC.

  3. 3

    Online Inspection Registration

    Inspections may also be registered online via the city's CityInspect portal (washingtonterrace.cityinspect.com).

See the full Washington Terrace inspection guide — scheduling & re-inspection fees →

Tips

  • Washington Terrace has no dedicated solar-PV permit, application form, or fee line item — file the install as a standard Building/Excavation Permit (typically under the 'Electrical' category), valued under the same ICC-referenced Building Permit Fee Schedule as any other electrical/building work. Neither the Building Department page, the Building/Excavation Permit application page, nor the FY 2026-27 Consolidated Fee Schedule PDF carries a solar-specific line.
  • Residential (1-2 family) solar installs get the 25% plan review rate; commercial solar installs get the 65% commercial plan review rate — the same split that applies to every other permit type in this record, per the FY 2026-27 Consolidated Fee Schedule (Resolution 26-08).
  • Because NEC Article 690 (Solar Photovoltaic Systems) is part of the adopted National Electrical Code, submit an electrical single-line diagram with the application even though no separate solar-specific checklist is published by the city.
  • Also budget for an interconnection application with the local electric utility (Rocky Mountain Power in this service area) — that is a separate utility process outside the city's building permit and is not covered by this entry.

Frequently asked questions

Washington Terrace requires a solar pv (photovoltaic) installation permit for: Installation of a residential or commercial rooftop or ground-mount solar photovoltaic (PV) system, filed as a standard Building/Excavation Permit — no separate solar-specific application track exists; Work must comply with the adopted National Electrical Code (NEC), which governs solar PV systems under NEC Article 690, per Washington Terrace Municipal Code § 15.04.010(1)(b); Structural components (roof-mount racking, ground-mount support) must comply with the adopted IBC/IRC, per § 15.04.010(1)(a); Obtain any required land use authority approval before permit application, per § 15.02.010(1); Complete building permit application filed with the Chief Building Official, per § 15.02.010(2); Pay building permit fees and any other applicable fee before permit issuance, per § 15.02.010(3) and § 15.02.050(2)(b); Submit required plans and supporting documentation (system layout, electrical single-line diagram, structural/attachment details), per § 15.02.010(4). If your project isn't listed, confirm with Washington Terrace City Building, Planning & Inspection Department at (801) 395-8288 before starting work.

No. As of 2026-07-21, the city's Building Department page, its Building/Excavation Permit application system, and the FY 2026-27 Consolidated Fee Schedule (Resolution 26-08) contain no distinct solar, photovoltaic, or renewable-energy permit type or fee line item. A solar PV installation is filed and priced as a standard Building/Excavation Permit, with the fee set by the same ICC 'Building Valuation Data' and 'Building Permit Fee Schedule' mechanism (Municipal Code § 15.02.020) used for all other building permits in the city.

No solar-specific timeline is published. Under Utah Code § 10-20-909(4)(a), the city must complete plan review of a one- or two-family dwelling project (which includes an accessory rooftop or ground-mount solar installation) no later than 14 business days after the state's mandatory 3-business-day completeness screening period ends — the same statewide statutory floor used for the Residential Building Permit entry in this record.

You'll need: Building/Excavation Permit Application; System Plans and Electrical Single-Line Diagram. See the required-documents checklist on this page for details on each.

Washington Terrace requires 3 inspection(s) for a solar pv (photovoltaic) installation permit, in order: Electrical Inspection, Building/Structural Inspection, Online Inspection Registration. Schedule each through Washington Terrace City Building, Planning & Inspection Department ((801) 395-8288).

Apply through Washington Terrace City Building, Planning & Inspection Department at 5249 South 400 East, Washington Terrace, UT 84405. Phone: (801) 395-8288, email: Tylers@washingtonterracecity.org. Office hours: Mon–Fri 8:00 AM – 5:00 PM (Closed Holidays). Official information: https://washingtonterrace.gov/building.

Washington Terrace, Utah has adopted: International Building Code (IBC), most current edition — adopted by reference per Washington Terrace Municipal Code § 15.04.010(1)(a), automatically updated whenever the Utah Uniform Building Code Commission adopts a new edition (§ 15.04.060); currently the 2024 IBC per Utah Code § 15A-2-103, effective statewide July 1, 2026.; International Residential Code (IRC), most current edition — incorporated via IBC reference per § 15.04.010(1)(a); currently the 2021 IRC per Utah Code § 15A-2-103 (unchanged in the July 1, 2026 statewide update).; International Energy Conservation Code (IECC), most current edition — incorporated via IBC reference per § 15.04.010(1)(a); currently the 2024 IECC per Utah Code § 15A-2-103, effective statewide July 1, 2026 (statewide residential energy provisions effectively follow 2015 IECC residential per § 15A-2-104).; National Electrical Code (NEC), most current edition, as promulgated by NFPA — adopted per § 15.04.010(1)(b), amended per Utah Admin. Code R156-56-705; currently the 2023 NEC.; International Plumbing Code (IPC), most current edition — adopted per § 15.04.010(1)(c), amended per Utah Admin. Code R156-56-706; currently the 2024 IPC per Utah Code § 15A-2-103, effective statewide July 1, 2026.; International Mechanical Code (IMC) and International Fuel Gas Code (IFGC), most current editions — adopted per § 15.04.010(1)(d), amended per Utah Admin. Code R156-56-704; currently the 2024 IMC/IFGC per Utah Code § 15A-2-103, effective statewide July 1, 2026.; International Existing Building Code (IEBC) — adopted per Washington Terrace Municipal Code § 15.06.010.; Uniform Housing Code, Uniform Code for Abatement of Dangerous Buildings, and Uniform Code for Building Conservation — adopted per §§ 15.06.020–15.06.040.; All codes are automatically updated per § 15.04.060 whenever the Utah Division of Occupational and Professional Licensing (DOPL) or Uniform Building Code Commission adopts a new edition, per Utah Code § 58-56-4(3) — Washington Terrace does not maintain a separately-dated local code adoption; it tracks the statewide edition in force.. Local amendments apply — see the Washington Terrace overview page for the full list.

Washington Terrace's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Washington Terrace yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Washington Terrace lands. Privacy.