Solar PV (Photovoltaic) Installation Permit — Washington Terrace, Utah · Requirements sheet
Verified 2026-07-21 · Source: https://washingtonterrace.gov/building
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar PV (Photovoltaic) Installation Permit in Washington Terrace, Utah
Washington Terrace has not published a distinct solar or solar-PV permit type, application, or fee category. Neither the Building, Planning & Inspection Department page, the Building/Excavation Permit application portal, nor the FY 2026-27 Consolidated Fee Schedule (Resolution 26-08, adopted 6/26) lists a solar, photovoltaic, or renewable-energy line item — the Consolidated Fee Schedule's 'Building Permits - Over-the-Counter' table enumerates only HVAC, Plumbing (inside), Plumbing (outside), Electrical, Gas line, Roofing, Siding, and Window & Door. File a rooftop or ground-mount solar PV installation as a standard Building/Excavation Permit, typically under the 'Electrical' over-the-counter category, since PV work is regulated by the adopted National Electrical Code, Article 690. The fee is governed by the same ICC 'Building Valuation Data'/'Building Permit Fee Schedule' valuation mechanism used for every other building permit here, per Washington Terrace Municipal Code § 15.02.020.
Verified 2026-07-21 · Source
When you need this permit
- Installation of a residential or commercial rooftop or ground-mount solar photovoltaic (PV) system, filed as a standard Building/Excavation Permit — no separate solar-specific application track exists
- Work must comply with the adopted National Electrical Code (NEC), which governs solar PV systems under NEC Article 690, per Washington Terrace Municipal Code § 15.04.010(1)(b)
- Structural components (roof-mount racking, ground-mount support) must comply with the adopted IBC/IRC, per § 15.04.010(1)(a)
- Obtain any required land use authority approval before permit application, per § 15.02.010(1)
- Complete building permit application filed with the Chief Building Official, per § 15.02.010(2)
- Pay building permit fees and any other applicable fee before permit issuance, per § 15.02.010(3) and § 15.02.050(2)(b)
- Submit required plans and supporting documentation (system layout, electrical single-line diagram, structural/attachment details), per § 15.02.010(4)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Washington Terrace Municipal Code § 15.02.020 — the same fee mechanism used for every other permit type in this record; Show full citationHide
Washington Terrace Municipal Code § 15.02.020 — the same fee mechanism used for every other permit type in this record; no separate solar-PV valuation or flat fee is published. The FY 2026-27 Consolidated Fee Schedule's Building Permits and Building Permits - Over-the-Counter tables contain no solar or PV line item.Washington Terrace City FY 2026-27 Consolidated Fee Schedule (Resolution 26-08, adopted 6/26), 'Building Permits (3.2)': '25% Plan review fee on single/multiple family permits.' Applies to residential solar installs; Show full citationHide
Washington Terrace City FY 2026-27 Consolidated Fee Schedule (Resolution 26-08, adopted 6/26), 'Building Permits (3.2)': '25% Plan review fee on single/multiple family permits.' Applies to residential solar installs; commercial installs are billed the 65% commercial rate instead (see Commercial Building Permit entry).Review timeline
Inspection process
- 1
Electrical Inspection
Scheduled through the Washington Terrace Building, Planning & Inspection Department by calling (801) 395-8288 or (801) 393-8681, weekdays 9am-4pm, with 24-hour advance notice required; verifies NEC Article 690 compliance for the PV system's electrical components.
- 2
Building/Structural Inspection
Verifies roof-mount racking attachment or ground-mount support structure complies with the adopted IBC/IRC.
- 3
Online Inspection Registration
Inspections may also be registered online via the city's CityInspect portal (washingtonterrace.cityinspect.com).
See the full Washington Terrace inspection guide — scheduling & re-inspection fees →
Tips
- Washington Terrace has no dedicated solar-PV permit, application form, or fee line item — file the install as a standard Building/Excavation Permit (typically under the 'Electrical' category), valued under the same ICC-referenced Building Permit Fee Schedule as any other electrical/building work. Neither the Building Department page, the Building/Excavation Permit application page, nor the FY 2026-27 Consolidated Fee Schedule PDF carries a solar-specific line.
- Residential (1-2 family) solar installs get the 25% plan review rate; commercial solar installs get the 65% commercial plan review rate — the same split that applies to every other permit type in this record, per the FY 2026-27 Consolidated Fee Schedule (Resolution 26-08).
- Because NEC Article 690 (Solar Photovoltaic Systems) is part of the adopted National Electrical Code, submit an electrical single-line diagram with the application even though no separate solar-specific checklist is published by the city.
- Also budget for an interconnection application with the local electric utility (Rocky Mountain Power in this service area) — that is a separate utility process outside the city's building permit and is not covered by this entry.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Washington Terrace building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Washington Terrace's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Washington Terrace yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Washington Terrace lands. Privacy.
Other permits in Washington Terrace
Solar PV (Photovoltaic) Installation Permit in other cities
Compare solar pv (photovoltaic) installation permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Washington Terrace project checklist
Describe your project once and get every permit, document, and fee it triggers in Washington Terrace — in one checklist. Free, for any city and any number of projects.
Get started →