Solar PV (Photovoltaic) Installation Permit in Washington Terrace, Utah
Washington Terrace has not published a distinct solar/solar-PV permit type, application, or fee category. The city's Building, Planning & Inspection Department page, its Building/Excavation Permit application portal, and the FY 2026-27 Consolidated Fee Schedule (Resolution 26-08, adopted 6/26) were each re-checked directly on 2026-07-21 and none lists a solar, photovoltaic, or renewable-energy line item — the Consolidated Fee Schedule's 'Building Permits - Over-the-Counter' table enumerates only HVAC, Plumbing (inside), Plumbing (outside), Electrical, Gas line, Roofing, Siding, and Window & Door. A rooftop or ground-mount solar PV installation is filed as a standard Building/Excavation Permit (typically under the 'Electrical' over-the-counter category, since PV work is regulated by the adopted National Electrical Code, Article 690), with the fee governed by the same ICC 'Building Valuation Data'/'Building Permit Fee Schedule' valuation mechanism used for all other building permits in this file, per Washington Terrace Municipal Code § 15.02.020.
Verified 2026-07-21 · Source
When you need this permit
- Installation of a residential or commercial rooftop or ground-mount solar photovoltaic (PV) system, filed as a standard Building/Excavation Permit — no separate solar-specific application track exists
- Work must comply with the adopted National Electrical Code (NEC), which governs solar PV systems under NEC Article 690, per Washington Terrace Municipal Code § 15.04.010(1)(b)
- Structural components (roof-mount racking, ground-mount support) must comply with the adopted IBC/IRC, per § 15.04.010(1)(a)
- Obtain any required land use authority approval before permit application, per § 15.02.010(1)
- Complete building permit application filed with the Chief Building Official, per § 15.02.010(2)
- Pay building permit fees and any other applicable fee before permit issuance, per § 15.02.010(3) and § 15.02.050(2)(b)
- Submit required plans and supporting documentation (system layout, electrical single-line diagram, structural/attachment details), per § 15.02.010(4)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Scheduled through the Washington Terrace Building, Planning & Inspection Department by calling (801) 395-8288 or (801) 393-8681, weekdays 9am-4pm, with 24-hour advance notice required; verifies NEC Article 690 compliance for the PV system's electrical components.
- 2
Building/Structural Inspection
Verifies roof-mount racking attachment or ground-mount support structure complies with the adopted IBC/IRC.
- 3
Online Inspection Registration
Inspections may also be registered online via the city's CityInspect portal (washingtonterrace.cityinspect.com).
See the full Washington Terrace inspection guide — scheduling & re-inspection fees →
Tips
- Washington Terrace has no dedicated solar-PV permit, application form, or fee line item — file the install as a standard Building/Excavation Permit (typically under the 'Electrical' category), valued under the same ICC-referenced Building Permit Fee Schedule as any other electrical/building work. This was independently re-verified 2026-07-21 against the Building Department page, the Building/Excavation Permit application page, and the FY 2026-27 Consolidated Fee Schedule PDF (read directly, page-by-page).
- Residential (1-2 family) solar installs get the 25% plan review rate; commercial solar installs get the 65% commercial plan review rate — the same split that applies to every other permit type in this file, per the FY 2026-27 Consolidated Fee Schedule (Resolution 26-08).
- Because NEC Article 690 (Solar Photovoltaic Systems) is part of the adopted National Electrical Code, submit an electrical single-line diagram with the application even though no separate solar-specific checklist is published by the city.
- Also budget for an interconnection application with the local electric utility (Rocky Mountain Power in this service area) — that is a separate utility process outside the city's building permit and is not covered by this entry.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Washington Terrace building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Washington Terrace
Solar PV (Photovoltaic) Installation Permit in other cities
Compare solar pv (photovoltaic) installation permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Washington Terrace project checklist
Describe your project once and get every permit, document, and fee it triggers in Washington Terrace — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →