The City of Sheridan is the electrical Authority Having Jurisdiction (AHJ) inside city limits — Ordinance No. 2290 adopts the 2023 NEC as a City technical code enforced by the City of Sheridan Building Department, and the Wyoming Department of Fire Prevention & Electrical Safety's own "Local and State Jurisdictions" chart lists Sheridan (the municipality) as holding local ("L") electrical inspection AND electrical plan review authority under W.S. § 35-9-121, rather than the State ("S"). The State Chief Electrical Inspector's office administers electrical permitting only where no local authority has been delegated (shown as "S" on the same chart) — that does not apply within the City of Sheridan.

Verified 2026-07-13 · Source

When you need this permit

  • Sheridan's Ordinance No. 2290 adopts the 2023 NEC as a City technical code, amends NEC Section 230.70(A)(1) (exterior service disconnect requirement), and provides that wherever the Fire Code references the NEC it means "the latest adopted electrical code of the City of Sheridan" — the City's own Building Department (created under the same ordinance, Section 103.1 as applied to each adopted technical code) administers and enforces it
  • The Wyoming Dept. of Fire Prevention & Electrical Safety's "Local and State Jurisdictions" chart (updated 5/11/2026) lists the City of Sheridan with "L" (municipality/county enforces) for both the ELEC INSP and ELEC PR columns — confirming the City, not the State, is the electrical AHJ inside city limits
  • Electrical service upgrades in existing buildings are a City Simple Permit at a flat fee
  • New electrical work bundled with new construction, additions, remodels, or other Detailed Building Permit work is covered under the general Residential/Commercial New/Add/Alter valuation-based permit fee — the City does not publish a separate itemized electrical rough-in/service-size fee table beyond the flat Simple Permit fees

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Electrical Service Upgrade (Simple Permit)City of Sheridan FY27 Master Fee Schedule (approved July 6, 2026), p.11, "Simple Permits — Electrical Service Upgrades" — figure confirmed unchanged from Resolution #34-23 as of re-verification 2026-07-13; the only standalone electrical-specific fee line the City publishes; electrical work that is part of a larger Detailed Building Permit project is covered by that permit's valuation-based fee
$40.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Sheridan building department
~1–10 business days

How long did your Electrical Permit permit actually take in Sheridan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring and conduit installed before walls closed

  2. 2

    Final

    All devices installed, panel labeled, system energized

See the full Sheridan inspection guide — scheduling & re-inspection fees →

Tips

  • The City of Sheridan Building Department is the electrical AHJ within city limits — confirmed both by Ordinance No. 2290 (City-adopted 2023 NEC, City-amended Section 230.70(A)(1), City Building Department enforcement) and independently by the Wyoming Dept. of Fire Prevention & Electrical Safety's own jurisdictions chart, which marks Sheridan "L" (local) for both electrical inspection and electrical plan review.
  • The Wyoming State Fire Marshal's regional electrical inspector office located in Sheridan serves Sheridan COUNTY's unincorporated areas and other Sheridan County towns (marked "S" on the state's chart) — it does not perform electrical permitting/inspection inside the City of Sheridan itself.
  • Apply for City electrical permits through the same OpenGov Permit & Licensing Portal (sheridanwy.portal.opengov.com) used for other City building permits.
  • 2026-07-17 re-verification: live Municode City Code Ch. 7, §7-2(5) (version dated Apr 30, 2026, current) still reads "The 2023 Edition of the National Electric Code as adopted by the city council shall be amended as follows... Section 230.70(A)(1)..." — confirming Ordinance No. 2290's 2023 NEC adoption remains unchanged. The Wyoming State Fire Marshal's statewide move to the 2026 NEC (effective 2026-07-01) does not reach the City of Sheridan because electrical is enforced locally here (WSFM chart marks Sheridan "L"/"L"), not by the State.

Frequently asked questions

Sheridan requires an electrical permit for: Sheridan's Ordinance No. 2290 adopts the 2023 NEC as a City technical code, amends NEC Section 230.70(A)(1) (exterior service disconnect requirement), and provides that wherever the Fire Code references the NEC it means "the latest adopted electrical code of the City of Sheridan" — the City's own Building Department (created under the same ordinance, Section 103.1 as applied to each adopted technical code) administers and enforces it; The Wyoming Dept. of Fire Prevention & Electrical Safety's "Local and State Jurisdictions" chart (updated 5/11/2026) lists the City of Sheridan with "L" (municipality/county enforces) for both the ELEC INSP and ELEC PR columns — confirming the City, not the State, is the electrical AHJ inside city limits; Electrical service upgrades in existing buildings are a City Simple Permit at a flat fee; New electrical work bundled with new construction, additions, remodels, or other Detailed Building Permit work is covered under the general Residential/Commercial New/Add/Alter valuation-based permit fee — the City does not publish a separate itemized electrical rough-in/service-size fee table beyond the flat Simple Permit fees. If your project isn't listed, confirm with City of Sheridan Building Department at (307) 674-5941 before starting work.

In Sheridan, the published Electrical Service Upgrade (Simple Permit) is: $40.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for an electrical permit in Sheridan typically runs 1–10 business days. This is an estimate, not a published figure — confirm current review times with City of Sheridan Building Department at (307) 674-5941.

You'll need: Building Permit Application (OpenGov Permit & Licensing Portal). See the required-documents checklist on this page for details on each.

Sheridan requires 2 inspection(s) for an electrical permit, in order: Rough-In, Final. Schedule each through City of Sheridan Building Department ((307) 674-5941).

Apply through City of Sheridan Building Department at 55 Grinnell Plaza, Sheridan, WY 82801. Phone: (307) 674-5941, email: Contact the Building Division via (307) 674-5941. Office hours: Mon–Fri 7:00 a.m.–4:00 p.m.. Official information: https://www.sheridanwy.gov/government/building.

Sheridan, Wyoming has adopted: 2024 International Residential Code (IRC) — as amended by City of Sheridan Ordinance No. 2290 (adopted Jan. 20, 2025); cited as the "Residential Code for One- and Two-Family Dwellings of the City of Sheridan"; 2024 International Building Code (IBC) — as amended by Ordinance No. 2290; cited as the "Building Code of the City of Sheridan"; 2024 International Mechanical Code (IMC) — as amended by Ordinance No. 2290; cited as the "Mechanical Code of the City of Sheridan"; 2024 International Plumbing Code (IPC) — as amended by Ordinance No. 2290; cited as the "Plumbing Code of the City of Sheridan"; 2023 National Electrical Code (NEC), as adopted/published by the NFPA — adopted as a City technical code by Ordinance No. 2290, amending NEC Section 230.70(A)(1) (exterior service disconnect location); 2024 International Fire Code (IFC) — as amended by Ordinance No. 2290, including Appendix Divisions D, E, F, G and I; cited as the "Fire Code of the City of Sheridan"; 2024 International Existing Building Code (IEBC) — as amended by Ordinance No. 2290; cited as the "Existing Building Code of the City of Sheridan"; 2024 International Swimming Pool and Spa Code (ISPSC) — as amended by Ordinance No. 2290; cited as the "Swimming Pool and Spa Code of the City of Sheridan"; 2024 International Fuel Gas Code (IFGC) — as amended by Ordinance No. 2290; cited as the "Fuel Gas Code of the City of Sheridan"; 2021 International Property Maintenance Code (IPMC), including Appendix A — as amended by Ordinance No. 2290; cited as the "Property Maintenance Code of the City of Sheridan"; 1997 Uniform Code for the Abatement of Dangerous Buildings (UCADB), as adopted/published by the International Conference of Building Officials — adopted by Ordinance No. 2290. Local amendments apply — see the Sheridan overview page for the full list.

The City of Sheridan issues and inspects electrical permits within city limits. The City adopted its own amended 2023 NEC under its own Building Department (Ordinance No. 2290), and the Wyoming Department of Fire Prevention & Electrical Safety's own "Local and State Jurisdictions" chart confirms Sheridan holds local ("L") electrical inspection and plan-review authority. The State's electrical program instead applies to areas of Sheridan County without delegated local authority.