PermitBaseMountain West

Commercial Tenant Improvement Permit in Sheridan, Wyoming

Verified

Required for interior remodels, additions, and tenant improvements in commercial buildings in the City of Sheridan. Processed as a Detailed Building Permit (plan review) under the 2024 IBC as amended by Ordinance No. 2290.

Verified 2026-07-01 · Source

Valuation x 0.036 x 0.8Commercial New/Add/Alter — up to $100,000 valuation

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Commercial New/Add/Alter — up to $100,000 valuationValuation x 0.036 x 0.8City of Sheridan Master Fee Schedule (Resolution #34-23), p.14, "Commercial New/Add/Alter"
Commercial New/Add/Alter — over $100,000 valuation(($100,000 x 0.036) + (remaining amount x 0.0095)) x 0.8City of Sheridan Master Fee Schedule (Resolution #34-23), p.14

Review timeline

~1030 business days

Typical estimate — confirm current times with the Sheridan building department

Inspection process

  1. 1

    Framing / Structural

    After framing complete before walls covered

  2. 2

    MEP Rough-In

    Mechanical, electrical, plumbing rough-in before walls closed

  3. 3

    Fire / Knox Box

    Knox box installation verification (required on all commercial occupancies per local amendment); fire sprinkler/alarm inspections currently routed through the State per City's posted notice

  4. 4

    Final / Certificate of Occupancy

    All work complete, ready for occupancy

Tips

Frequently asked questions

Are Knox boxes required for commercial buildings in Sheridan?
Yes. A local amendment to IFC Section 506.1 requires Knox boxes on all commercial occupancies in the City of Sheridan.
Who reviews fire sprinkler/alarm plans for commercial projects in Sheridan?
As of this verification, the City of Sheridan has posted a notice stating it does not have a certified Fire Plans Examiner or qualified fire-inspection professional on staff; all fire sprinkler, fire alarm, and related fire inspections and associated fees must be directed through the State of Wyoming.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sheridan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Sheridan

Related guides

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.