Solar PV Permit in Sheridan, Wyoming
VerifiedRequired for installation of solar photovoltaic panels in the City of Sheridan. Processed as a flat-fee Simple Permit per the City's Master Fee Schedule.
Verified 2026-07-01 · Source
When you need this permit
- Solar panel installation is listed as a City Simple Permit with a flat fee
- Electrical connections must comply with the City's amended 2023 NEC
Required documents
- Req
Building Permit Application (OpenGov Permit & Licensing Portal)
Online application at sheridanwy.portal.opengov.com
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Panel (Simple Permit) | $250.00 | City of Sheridan Master Fee Schedule (Resolution #34-23), p.14, "Simple Permits" |
Review timeline
~1–10 business days
Typical estimate — confirm current times with the Sheridan building department
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before cover
- 2
Final
All connections and racking/roof penetrations verified, system energized
Tips
- Sheridan lists solar panel installation as a flat-fee ($250) Simple Permit rather than a valuation-based permit — notably simpler than many jurisdictions' solar permitting process.
Frequently asked questions
- How much does a solar permit cost in Sheridan?
- $250.00 flat fee, per the City of Sheridan Master Fee Schedule (Resolution #34-23), listed under "Simple Permits."
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
- City of Sheridan Building Department — official building department
- City of Sheridan Master Fee Schedule (Resolution #34-23, adopted July 5, 2023)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sheridan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Sheridan
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.