Residential Building Permit (New Construction) in Sheridan, Wyoming

Verified

Required for new single-family and two-family dwelling construction in the City of Sheridan. Processed as a "Detailed Building Permit" requiring plan review under the 2024 IRC as locally amended by Ordinance No. 2290. Building costs over $3,000 or new buildings over 200 sq ft require a permit.

Verified 2026-07-01 · Source

Valuation x 0.03 x 0.8Residential New/Add/Alter — up to $100,000 valuation

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Residential New/Add/Alter — up to $100,000 valuationValuation x 0.03 x 0.8City of Sheridan Master Fee Schedule (Resolution #34-23, adopted July 5, 2023, effective July 1, 2023), p.14, reproducing the Building Permit Fee formula originally set by Resolution #18-17 (June 19, 2017, effective July 1, 2017)
Residential New/Add/Alter — over $100,000 valuation(($100,000 x 0.03) + (remaining amount x 0.017)) x 0.8City of Sheridan Master Fee Schedule (Resolution #34-23), p.14
Valuation basisPer the ICC Building Valuation Data table on file with the Building DivisionCity of Sheridan Resolution #18-17, Section 1(c)
Repeat/stock plan submittalsFull permit fee for first permit; 30% reduction on each subsequent permit using the same stock plans (valid 2 years)City of Sheridan Resolution #18-17, "Repeat Building Plans" section
Investigation fee (work started without a permit)Equal to the permit fee otherwise required, in addition to the permit feeCity of Sheridan Resolution #18-17, Section 2 / Master Fee Schedule p.13
Re-Inspection (each, up to 3 times)$58.75City of Sheridan Master Fee Schedule (Resolution #34-23), p.13, "Building Inspection/Code Enforcement"

Review timeline

~520 business days

Typical estimate — confirm current times with the Sheridan building department

Inspection process

  1. 1

    Foundation / Footings

    Before concrete pour — footings must extend below the 42-inch local frost line

  2. 2

    Framing

    After framing complete, before insulation or wall cover

  3. 3

    MEP Rough-In

    Mechanical, electrical, and plumbing rough-in before walls closed

  4. 4

    Final

    All work complete, smoke/CO detectors installed, ready for occupancy

Tips

Frequently asked questions

What triggers the need for a building permit in Sheridan?
The City of Sheridan requires a building permit for any project with building costs over $3,000 or for any new building over 200 square feet. Some electrical, mechanical, and plumbing work requires a permit regardless of value.
Which code edition applies to new residential construction in Sheridan?
The 2024 International Residential Code (IRC) as locally amended by City of Sheridan Ordinance No. 2290 (adopted January 20, 2025), including Sheridan-specific climatic and geographic design criteria (30 psf snow load, 115 mph wind, 42-inch frost depth, Seismic Design Category B).

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sheridan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Sheridan

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.