Electrical Permit in Unincorporated Teton County, Wyoming

Electrical permits for unincorporated Teton County are issued, reviewed, and inspected by the Electrical Division of the Jackson Hole Fire/EMS Department — a jointly-funded Town of Jackson / Teton County fire district — NOT the Wyoming State Fire Marshal's statewide program and not the County Building Division directly. This is expressly stated in both the County's adopted Building Codes Resolution (Section 101.4.8, 109.2) and the County's 2026 Fee Schedule.

Verified 2026-07-01 · Source

When you need this permit

  • Apply/inquire directly with Jackson Hole Fire/EMS's Electrical Division for permit issuance, fees, and inspections
  • 2023 National Electrical Code (NEC) applies to installation, alteration, repair, replacement of electrical systems (County Building Codes Resolution Section 101.4.8)
  • Homeowner exemption (per Jackson Hole Fire/EMS/Town of Jackson electrical program, which administers the county's program jointly): a homeowner who constructs, alters, or repairs their own occupied residence, including accessory buildings, may do so without a State of Wyoming electrical license Owner-builder
  • Electrical plan review is required for industrial/commercial installations, residential services over 400 amps, and all Solar PV/Energy Storage System (battery) installations

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Electrical Permit FeeTETON COUNTY FEE SCHEDULE 2026 states: 'The fees assessed for electrical permits are processed, reviewed and inspected by Jackson Hole Fire/EMS. Questions about electrical permits or associated fees should be directed to Jackson Hole Fire/EMS.' Contact Jackson Hole Fire/EMS (307-733-4732) directly for the current fee amount.
Set and collected by Jackson Hole Fire/EMS Electrical Division — not published in the County Planning & Building fee schedule

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Teton County building department
~5–20 business days

How long did your Electrical Permit permit actually take in Unincorporated Teton County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Rough-In

    Conducted by Jackson Hole Fire/EMS — cannot be scheduled through the County's online portal; contact Jackson Hole Fire/EMS directly

  2. 2

    Electrical Final

See the full Unincorporated Teton County inspection guide — scheduling & re-inspection fees →

Tips

  • Do not assume electrical inspections can be scheduled via the County SmartGov portal — even though they may appear as an option, Jackson Hole Fire/EMS must be contacted directly (County Building page note).
  • 2026-07-17 re-verification: the live 2025 Teton County Building Codes Resolution (tetoncountywy.gov/DocumentCenter/View/31760, redline showing '2020' struck through and replaced with '2023') confirms Section 101.4.8 Electrical still adopts "the 2023 National Electrical Code"; the County's own Code Resolutions page (tetoncountywy.gov/613/Code-Resolutions) lists this 2025 resolution as current, with no newer 2026 resolution. The Wyoming State Fire Marshal's statewide move to the 2026 NEC (effective 2026-07-01) does not reach unincorporated Teton County because electrical is enforced locally here (WSFM chart: ELEC INSP/PR = L/L).

Frequently asked questions

Unincorporated Teton County requires an electrical permit for: Apply/inquire directly with Jackson Hole Fire/EMS's Electrical Division for permit issuance, fees, and inspections; 2023 National Electrical Code (NEC) applies to installation, alteration, repair, replacement of electrical systems (County Building Codes Resolution Section 101.4.8); Homeowner exemption (per Jackson Hole Fire/EMS/Town of Jackson electrical program, which administers the county's program jointly): a homeowner who constructs, alters, or repairs their own occupied residence, including accessory buildings, may do so without a State of Wyoming electrical license; Electrical plan review is required for industrial/commercial installations, residential services over 400 amps, and all Solar PV/Energy Storage System (battery) installations. If your project isn't listed, confirm with Teton County Planning & Building Services Department — Building Division at 307-733-3959 (Building Official/fee estimates: 307-733-7030; Inspection Line: 307-732-5745) before starting work.

In Unincorporated Teton County, the published Electrical Permit Fee is: Set and collected by Jackson Hole Fire/EMS Electrical Division — not published in the County Planning & Building fee schedule. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for an electrical permit in Unincorporated Teton County typically runs 5–20 business days. This is an estimate, not a published figure — confirm current review times with Teton County Planning & Building Services Department — Building Division at 307-733-3959 (Building Official/fee estimates: 307-733-7030; Inspection Line: 307-732-5745).

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Unincorporated Teton County requires 2 inspection(s) for an electrical permit, in order: Electrical Rough-In, Electrical Final. Schedule each through Teton County Planning & Building Services Department — Building Division (307-733-3959 (Building Official/fee estimates: 307-733-7030; Inspection Line: 307-732-5745)).

Apply through Teton County Planning & Building Services Department — Building Division at 200 S. Willow Street, Jackson, WY 83001 (P.O. Box 1727, Jackson, WY 83001-1727). Phone: 307-733-3959 (Building Official/fee estimates: 307-733-7030; Inspection Line: 307-732-5745), email: permittech@tetoncountywy.gov. Office hours: Applications submitted through the Teton County Online Portal (SmartGov); New Residential Construction, Commercial New Construction, and Miscellaneous (under 500 sq ft) permits require a scheduled submission/take-in week booked via the Bookings page. Trade permits (mechanical, plumbing, demolition, re-roof) do not require a submission week and are typically issued within 48 hours.. Official information: https://www.tetoncountywy.gov/560/Building.

Unincorporated Teton County, Wyoming has adopted: 2024 International Building Code (IBC), including Appendix C (Group U-Agricultural Buildings) and Appendix I (Patio Covers) — Teton County Building Codes Resolution, effective February 1, 2025; 2024 International Residential Code (IRC), including Appendix BB (Tiny Houses) and Appendix AF (Radon Control Methods) — effective February 1, 2025; 2024 International Plumbing Code (IPC), including Appendix E (Sizing of Water Piping System); 2024 International Mechanical Code (IMC), including Appendix A (Combustion Air Openings and Chimney Connector Pass-Throughs); 2024 International Fuel Gas Code (IFGC), all appendices excluded; 2021 International Energy Conservation Code (IECC), all appendices excluded; 2024 International Existing Building Code (IEBC), including Appendix A (Guidelines for the Seismic Retrofit of Existing Buildings); 2024 International Property Maintenance Code (IPMC), applied only to the extent referenced provisions relate to fire and life safety; 2023 National Electrical Code (NEC) — enforced by the Electrical Division of the Jackson Hole Fire/EMS Department (Section 101.4.8 Electrical, County Building Codes Resolution); 2024 International Wildland-Urban Interface Code (IWUIC) — adopted jointly by the Town of Jackson and Teton County; enforced by Jackson Hole Fire/EMS. Local amendments apply — see the Unincorporated Teton County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Teton County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.