Sign Permit — Tombstone, Arizona · Requirements sheet
Verified 2026-08-15 · Source: https://cityoftombstoneaz.gov/forms-permits/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Tombstone, Arizona
Required for every sign and advertising structure in the City of Tombstone. Tombstone City Code Section 10-14-6 states plainly that 'a building permit shall be required for every sign and advertising structure regulated by this chapter' (Title 10, Chapter 14, Billboards and Signs). Tombstone runs a two-track process: the ordinary sign permit issued by the Building Department, and — because essentially the whole commercial core lies inside the Schieffelin Historic Preservation District — a Certificate of Appropriateness reviewed and approved by the Historic Preservation Commission before the sign may be erected. Code Section 10-19-8 is explicit that 'building permits for signs visible within the Schieffelin Historic Preservation District shall be subject to review and approval by the Historic Preservation Commission' and that 'no sign shall be erected within Schieffelin Historic Preservation District boundaries which has not received an approved Standard Application Form from the City through the Historic Preservation Commission.' The City's own HPC form is titled the Historic District Sign and Construction Application and carries a dedicated Section 8 for signs.
Verified 2026-08-15 · Source
When you need this permit
- A building permit is required for every sign and advertising structure regulated by Chapter 14 of the zoning title (Tombstone City Code Section 10-14-6); the City building inspector is authorized to cause removal of any sign erected in violation, with removal costs recoverable from the owner
- Two (2) copies of plans and specifications must be submitted with the sign permit application; one copy is returned to the applicant when the permit is granted (Section 10-14-7)
- Plans must show complete details, size of the sign, method of attachment or support, location, materials to be used, and the name, address and profession of the person who designed the plans and specifications (Section 10-14-7)
- For roof signs and other signs subject to excessive stresses, plans for supports must show that the supporting surfaces and other members of the existing building are in good condition and adequately strong to support the load (Section 10-14-7)
- Signs visible within the Schieffelin Historic Preservation District additionally require Historic Preservation Commission review and approval of a Certificate of Appropriateness — no sign may be erected in the district without an approved Standard Application Form issued through the HPC (Section 10-19-8)
- Signs must conform to all requirements of the City Zoning Ordinance in addition to the historic-district design criteria (Section 10-19-8)
- Within the historic district, signs must either follow verifiable historic precedent for the specific property (content, color, wording, lettering, size and location), with the burden of proof on the owner, or meet the Chapter 19 size and design standards (Section 10-19-8)
- Historic-district sign area limits: a sign hanging over the boardwalk may not exceed eight (8) square feet and no hanging sign may be more than two (2) feet high; projecting signs above porches (or where no porches exist) may extend no more than four (4) feet from the building front; no more than three (3) hanging signs per business or residence, with an additional one or two allowed on a street-corner building (Section 10-19-8)
- Historic-district lettering, logos, pictures, sketches and characters must be consistent with nineteenth-century signage, style and taste as delineated by the Design Guidelines, and colors must be those used in the period of historic significance (Section 10-19-8)
- HPC applications and all material samples must be submitted ten (10) working days before the regular Historic Preservation Commission meeting to be placed on the agenda, and sixty (60) days before work begins (City of Tombstone HPC Certificate of Appropriateness Application Check List, Rev. 3/3/2026)
- HPC approval does not include approval for a building permit — a separate building permit must be obtained if required by the City Building Code or the 2006 International Building Code (HPC Application Check List, Rev. 3/3/2026)
- Signs requiring a permit are subject to inspection under Section 10-14-17
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Sign Inspection
All signs existing at the time of passage of Chapter 14, and any signs erected in the future that require a permit, are subject to inspection (Tombstone City Code Section 10-14-17). The $100.00 one-sign fee covers the initial inspection plus one additional inspection; further inspections are $50.00 each (Fee Schedule effective 11/14/2025).
- 2
Historic Preservation Inspector Sign-off
The HPC Certificate of Appropriateness application carries a 'For Office Use Only' block with a Building Official Recommendation (Recommended / Not Recommended for Approval) and a signature line for the Historic Preservation Inspector (HPC Application, Rev. 3/3/2026)
See the full Tombstone inspection guide — scheduling & re-inspection fees →
Tips
- Sequence matters in Tombstone: Section 10-19-8 bars erecting any sign inside the Schieffelin Historic Preservation District without an approved Standard Application Form issued through the Historic Preservation Commission, and the City's HPC packet says outright that HPC approval does not include a building permit. Budget for both tracks — HPC first, building permit second.
- The HPC meets only once a month (first Monday, Schieffelin Hall) and requires submittal ten working days before the meeting and sixty days before work begins. Missing an agenda deadline costs a full month, which is the single largest schedule risk on a Tombstone sign.
- Repainting or repair of a legal sign is cheaper than it looks statewide, but Tombstone is stricter than most: Section 10-14-6 attaches the permit requirement to every regulated sign, and the historic-district design criteria govern lettering, logos and colors, which must match the period of historic significance and be verifiable against paint chip cards or the Design Guidelines.
- Hanging signs over the boardwalk are capped at eight square feet and two feet in height, with no more than three hanging signs per business (an extra one or two on a corner building). A variance on the number of signs may be sought under extraordinary circumstances.
- The one-sign fee of $100.00 already buys plan review, the initial inspection and one additional inspection. Every inspection after that is $50.00, so getting the install right the first time is worth more than the fee difference suggests.
- The City publishes no Certificate of Appropriateness fee anywhere in its November 14, 2025 fee schedule. That is a disclosed gap, not a $0 finding — ask the Building Department (520-457-3415, buildingofficial@cityoftombstoneaz.gov) what the HPC review costs before you price the job.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-15.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tombstone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tombstone
Sign Permit in other cities
Compare sign permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Tombstone project checklist
Describe your project once and get every permit, document, and fee it triggers in Tombstone — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →