Residential Addition / Remodel Permit — Tombstone, Arizona · Requirements sheet
Verified 2026-07-07 · Source: https://cityoftombstoneaz.gov/building-inspector/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Addition / Remodel Permit in Tombstone, Arizona
Required for room additions, remodels, and alterations to existing residential structures in Tombstone, using the City's same unified Building Permit Application ('Repair/Replace' class of work) and valuation-based fee table. Properties within the Schieffelin Historic District require HPC Certificate of Appropriateness approval for exterior alterations before a permit is issued.
Verified 2026-07-07 · Source
When you need this permit
- Building permit required for room additions, remodels, and alterations affecting the structure, per Tombstone City Code Section 3-1-1
- Use the City's unified Building Permit Application, Class of Work 'Repair/Replace'
- Minor repair/maintenance using replacement materials of the same type/size, without fundamental construction change, is exempt from permit requirements at the Building Inspector's discretion
- Properties within the Schieffelin Historic District require HPC Certificate of Appropriateness approval before a permit is issued for exterior alterations (interior-only remodels not visible from a public street/alley are not COA-triggering per the District's own applicability standard)
- Routine maintenance/emergency repairs valued under $1,000 within the Historic District may proceed concurrently with (rather than after) COA application
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Pre-Concrete / Framing
Before concrete pour or before covering new framing/drywall for the addition/remodel scope
- 2
Rough-In (Plumbing, Mechanical, Electrical)
Where applicable to the remodel scope
- 3
Final
Completed work verified against approved plans
See the full Tombstone inspection guide — scheduling & re-inspection fees →
Tips
- Tombstone does not publish a separate fee table or valuation chart specifically for remodels/additions — the same Building Permit valuation-based chart used for new construction applies, per the City's November 2025 Fee Schedule.
- As of July 2026, the City of Tombstone does not publish a permit-specific plan review turnaround time for additions/remodels anywhere in its public materials (application form, fee schedule, or codified City Code) — see the chase-trail documented in the Residential Building Permit entry. Call the Building Official at 520-457-3415 for a current estimate.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tombstone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tombstone
Residential Addition / Remodel Permit in other cities
Compare residential addition / remodel permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Tombstone project checklist
Describe your project once and get every permit, document, and fee it triggers in Tombstone — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →