Demolition Permit in Tombstone, Arizona

Required for demolition of any structure in Tombstone. Demolition within the Schieffelin Historic District is subject to Historic Preservation Commission Certificate of Appropriateness review, since 'removal, or demolition of a landmark structure' is an explicitly enumerated COA trigger.

Verified 2026-07-07 · Source

When you need this permit

  • Building permit required before demolishing a building, utility, or structure within Tombstone city limits, per Tombstone City Code Section 3-1-1 ('Construct, Enlarge, Alter, Repair, Improve, Move, Convert, Demolish any building, utilities, or structure')
  • Within the Schieffelin Historic District, demolition or removal of a landmark structure requires Historic Preservation Commission Certificate of Appropriateness approval before the demolition permit may be issued (Tombstone City Code Section 10-19-4)
  • All utilities should be properly terminated as part of standard demolition practice

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition Plan Review (includes 1st and 2nd review)City of Tombstone Fee Schedule (effective 11/14/2025), listed as its own line item ('Demolition (Includes 1st and 2nd review)') under Building Plan Review.
65% of the Building Permit Fee
Demolition Permit — Based on ValuationCity of Tombstone Fee Schedule (effective 11/14/2025) — no separate itemized flat demolition permit fee distinct from the standard valuation table was found; demolition plan review has its own line, but the underlying permit fee uses the same valuation chart.
Same Building Permit valuation table as new construction

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Tombstone?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Site condition and utility termination verified after demolition complete

See the full Tombstone inspection guide — scheduling & re-inspection fees →

Tips

  • Tombstone's Fee Schedule has a dedicated 'Demolition (Includes 1st and 2nd review)' plan review line at 65% of the permit fee — one of only a handful of trade-specific plan-review categories the City itemizes separately (alongside Plumbing, Electrical, Mechanical, Combination, and Swimming Pool).
  • Demolition of a landmark structure within the Schieffelin Historic District requires HPC Certificate of Appropriateness review — the District's own applicability standard explicitly lists 'removal, or demolition of a landmark structure' as a COA trigger, alongside exterior alteration/reconstruction/restoration.
  • As of July 2026, the City of Tombstone does not publish a permit-specific plan review turnaround time for demolition permits anywhere in its public materials — see the chase-trail documented in the Residential Building Permit entry. Call 520-457-3415 for a current estimate.

Frequently asked questions

Tombstone requires a demolition permit for: Building permit required before demolishing a building, utility, or structure within Tombstone city limits, per Tombstone City Code Section 3-1-1 ('Construct, Enlarge, Alter, Repair, Improve, Move, Convert, Demolish any building, utilities, or structure'); Within the Schieffelin Historic District, demolition or removal of a landmark structure requires Historic Preservation Commission Certificate of Appropriateness approval before the demolition permit may be issued (Tombstone City Code Section 10-19-4); All utilities should be properly terminated as part of standard demolition practice. If your project isn't listed, confirm with City of Tombstone Building Department at 520-457-3415 before starting work.

In Tombstone, the published Demolition Plan Review (includes 1st and 2nd review) is: 65% of the Building Permit Fee. Additional published fees: Demolition Permit — Based on Valuation — Same Building Permit valuation table as new construction. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Tombstone does not publish a plan-review timeline for this permit. Contact City of Tombstone Building Department at 520-457-3415 for current turnaround.

You'll need: Building Permit Application (City of Tombstone, Rev. 1/2024). Depending on your project, Tombstone may also ask for: HPC Application. See the required-documents checklist on this page for details on each.

Tombstone requires 1 inspection(s) for a demolition permit, in order: Final. Schedule each through City of Tombstone Building Department (520-457-3415).

Apply through City of Tombstone Building Department at 611 E. Allen Street, Tombstone, AZ 85638 (City Hall: 613 E. Allen Street, Tombstone, AZ 85638). Phone: 520-457-3415, email: buildingofficial@cityoftombstoneaz.gov. Office hours: Monday - Friday, 8:00 AM - 5:00 PM (City of Tombstone Building Inspector page and Building Permit Application, Rev. 1/2024). Building Official/Inspector: Robert Hendrickson. Applications are submitted in person or by mail to the Building Department (P.O. Box 339, Tombstone, AZ 85638); the City does not appear to offer an online e-permitting portal as of this review — all forms found are static PDFs requiring paper/email submittal. Inspections are scheduled by calling 520-457-3415. Projects within the Schieffelin Historic District require Historic Preservation Commission (HPC) approval BEFORE building permit submission/approval, per the Building Permit Application's own header notice.. Official information: https://cityoftombstoneaz.gov/building-inspector/.

Tombstone, Arizona has adopted: Arizona has no statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9). The City of Tombstone is a home-rule city that independently adopts and administers its own construction codes through its own Building Department; it does not defer building permitting to Cochise County despite its small size (2020 Census population 1,307). Source: Tombstone City Code, Title 3 (Building Regulations), Chapter 1 (Building Code), codelibrary.amlegal.com/codes/tombstoneaz (current through Ord. 2025-06, passed 10-14-2025).; 2006 International Residential Code (IRC) and 2006 International Building Code (IBC), adopted by reference as 'the Uniform Building Code' of the City, per Tombstone City Code Section 3-1-1 (Adoption of Building Codes). NOTE: this is a genuinely old code cycle (2006, not a current ICC edition) — confirmed independently via two sources: (1) the codified City Code text itself (accessed via r.jina.ai proxy of codelibrary.amlegal.com/codes/tombstoneaz/latest/tombstone_az/0-0-0-1834, since amlegal.com returns HTTP 403 to a plain fetch), and (2) the Arizona Building Officials (AZBO) statewide directories, which as of the most recent editions searched (2018/2021) listed Tombstone's adopted codes as 2006 IBC/IRC/IMC/IPC and 2005 NEC. The current Building Permit Application (Rev. 1/2024) also cites 'Tombstone City Code, 3-1-1: Adoption of the Uniform Building Code' and references 'Uniform Building Code Permit Requirements' by name, consistent with the 2006-cycle adoption never having been updated to a current ICC edition. Source: Tombstone City Code Section 3-1-1; AZBO Directory (2018, 2021 editions); City of Tombstone Building Permit Application (Rev. 1/2024).; National Electrical Code of 1988, as copyrighted by the National Fire Protection Association, adopted by reference (Tombstone City Code Section 3-1-4, Electrical Code). This is a very old NEC edition (1988) relative to current AZ municipal practice (most Cochise County peers are on 2017 or 2020 NEC) — confirmed via direct code-section fetch; no more recent NEC adoption ordinance was located despite a search for 'building code' + ordinance amendments through the current Ord. 2025-06 code-currency marker. Source: Tombstone City Code Section 3-1-4.; Uniform Plumbing Code, 1988 edition, as copyrighted by the International Association of Plumbing and Mechanical Officials, adopted by reference (Tombstone City Code Section 3-1-5, Plumbing Code) — notably NOT an ICC/IPC adoption but the IAPMO's competing UPC model code, at its 1988 edition. Source: Tombstone City Code Section 3-1-5.; No IMC (mechanical), IFGC (fuel gas), IFC (fire), or IEBC (existing building) adoption was located anywhere in the codified Tombstone City Code Title 3 chapters reviewed, in the current Building Permit Application, or in the AZBO directory search results for Tombstone. This appears to be a genuine gap in the City's own published code structure (mechanical and gas work is folded into the 2006 IBC/IRC's own built-in mechanical/fuel-gas chapters rather than a standalone locally-adopted IMC/IFGC) rather than an extraction failure — the Building Permit Application's own 'Mechanical Plan' and 'Plumbing Plan' submittal-requirement sections cite no separate code title beyond the 'Uniform Building Code' umbrella term used throughout the form. Source: Tombstone City Code Title 3; City of Tombstone Building Permit Application (Rev. 1/2024).; Terminology construction: wherever 'a municipality' appears in the adopted building code, it is held to mean the City of Tombstone; 'corporation counsel' means the city attorney/legal advisor (Tombstone City Code Section 3-1-2, Construction of Terms). Source: Tombstone City Code Section 3-1-2.; Building Official / administrative authority is vested in the office of the City Clerk under the codified ordinance structure, with authority to designate deputies for inspections and other required duties (Tombstone City Code Section 3-1-6); in current practice, the City separately staffs a dedicated Building Official/Inspector position (Robert Hendrickson) rather than routing this through the Clerk's office day-to-day. Source: Tombstone City Code Section 3-1-6 (codified structure); City of Tombstone Building Inspector page (current practice).; Manufactured homes, mobile homes, and factory-built buildings: construction/installation standards for the home itself are regulated directly by the State of Arizona (Department of Fire, Building and Life Safety / Office of Manufactured Housing, A.R.S. Title 41-4001 et seq.), consistent with statewide practice; the City separately issues its own Manufactured Building Permit (flat fee $300.00, including 2 inspections, per the City's November 14, 2025 Fee Schedule) for local placement/site compliance, using its own dedicated Manufactured Building Permit Application form. Source: City of Tombstone Fee Schedule (effective 11/14/2025); Manufactured Building Permit Application (City of Tombstone).. Local amendments apply — see the Tombstone overview page for the full list.

Only with Historic Preservation Commission approval if the structure is a designated landmark within the Schieffelin Historic District — demolition or removal of a landmark structure is an explicitly enumerated Certificate of Appropriateness trigger under Tombstone City Code Section 10-19-4.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tombstone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.