Electric Vehicle (EV) Charger / Charging Station Permit — Tombstone, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://cityoftombstoneaz.gov/building-inspector/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charger / Charging Station Permit in Tombstone, Arizona
The City of Tombstone's Fee Schedule (effective 11/14/2025) has no dedicated EV charger/EVSE line item. Installing an EV charging station is electrical work, governed by the 1988 National Electrical Code as adopted by the City (Tombstone City Code Section 3-1-4) and billed on the same general valuation-based Building Permit fee chart documented in this file's Electrical Permit entry, using the same 'Electrical (Includes 1st and 2nd review)' plan-review line (65% of the Building Permit Fee).
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for EV charger installation, alteration, or repair work within Tombstone city limits, per the same process documented in this file's Electrical Permit entry
- Governed by the 1988 National Electrical Code as adopted by the City of Tombstone (Tombstone City Code Section 3-1-4) — an unusually old NEC edition that predates NEC Article 625's modern Electric Vehicle Power Transfer System provisions; no more recent NEC adoption ordinance was located as of this review
- Electrical Plan submittal required showing service entrance/meter/disconnect location, main and subpanel locations, circuit routing/sizing, and a legible panel circuit directory, per the same Building Permit Application (Rev. 1/2024) used for other electrical work
- No City of Tombstone-specific EV charger application, checklist, or fee line distinct from the general valuation-based Electrical Permit mechanism was found published as of 2026-07-20 — a genuine documentation gap, not an inferred figure
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
EV charger circuit wiring, box placement, and panel connections before walls are closed, per the same combined electrical rough-in stage documented in this file's Electrical Permit entry.
- 2
Final
Charger installed and connections verified per the 1988 NEC as adopted.
See the full Tombstone inspection guide — scheduling & re-inspection fees →
Tips
- There is no dedicated Tombstone EV charger fee — it is billed as ordinary electrical work under the same valuation-based Building Permit fee chart and 65%-of-permit-fee plan review line documented in this file's Electrical Permit entry.
- Tombstone's adopted electrical code (1988 NEC) predates NEC Article 625's modern EV charging provisions — confirm with the Building Department (520-457-3415) which edition's requirements will actually be applied to your installation, given the same code-vintage discrepancy already flagged in this file's Electrical Permit entry.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tombstone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tombstone
Electric Vehicle (EV) Charger / Charging Station Permit in other cities
Compare electric vehicle (ev) charger / charging station permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Tombstone project checklist
Describe your project once and get every permit, document, and fee it triggers in Tombstone — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →