Skip to main content
PermitBase

Electrical Permit in Tombstone, Arizona

Required for electrical installation, alteration, or repair work in Tombstone, governed by the National Electrical Code of 1988 as adopted by the City (Tombstone City Code Section 3-1-4) — a notably old NEC edition relative to Cochise County peers.

Verified 2026-07-07 · Source

When you need this permit

  • Electrical permit required for electrical installation, alteration, or repair work within Tombstone city limits
  • Governed by the 1988 National Electrical Code as adopted by the City of Tombstone (Tombstone City Code Section 3-1-4) — no more recent NEC adoption ordinance was located as of this review
  • New electrical work requires inspection before utility connection, per the codified Building Code chapter
  • Electrical Plan submittal required showing service entrance/meter/disconnect location, main and subpanel locations, switch/outlet/fixture locations, wiring routing/sizing/circuitry, and a legible panel circuit directory
  • Temporary Electric Power is a distinct, separately fee-scheduled permit type

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit — Based on ValuationCity of Tombstone Fee Schedule (effective 11/14/2025) — no separate itemized flat electrical fee table (e.g., per-meter-clearance or per-panel-upgrade) was found; electrical work is billed on the same general valuation-based Building Permit fee chart.
Same Building Permit valuation table as other trades: $0 ($0-$500.99) scaling to $7,366.30 for the first $1,000,000 plus $4.84 per additional $1,000 above $1,000,000.01
Electrical Plan Review (includes 1st and 2nd review)City of Tombstone Fee Schedule (effective 11/14/2025), listed as its own line item ('Electrical (Includes 1st and 2nd review)') distinct from the General Plan review line.
65% of the Building Permit Fee
Temporary Electric PowerCity of Tombstone Fee Schedule (effective 11/14/2025), listed under 'Other' Building Permit fees.
$100.00

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Tombstone?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed; part of the combined Plumbing/Mechanical/Electrical rough-in inspection stage

  2. 2

    Final

    Devices installed and connections verified per the 1988 NEC as adopted; part of the combined Final Plumbing/Mechanical/Electrical inspection stage

See the full Tombstone inspection guide — scheduling & re-inspection fees →

Tips

  • Tombstone's adopted electrical code (1988 NEC) is unusually old — confirmed directly from the codified Tombstone City Code Section 3-1-4 text (fetched via r.jina.ai proxy since amlegal.com 403s plain fetches) and independently corroborated by AZBO's 2018/2021 statewide directory search results listing '2005 NEC' for Tombstone in those years, meaning even the AZBO-listed figure differs from (is newer than) the codified 1988 text — flagging this discrepancy rather than resolving it, since no ordinance amendment bridging 1988 to 2005 (or beyond) was located in the current code library.
  • The Fee Schedule has its own distinct 'Electrical (Includes 1st and 2nd review)' line at 65% of the permit fee, separate from the general 'General Plan' review line — confirming electrical work is tracked as its own plan-review category even though it shares the same underlying valuation table as other trades.
  • As of July 2026, the City of Tombstone does not publish a permit-specific plan review turnaround time for electrical permits anywhere in its public materials — see the chase-trail documented in the Residential Building Permit entry. Call 520-457-3415 for a current estimate.

Frequently asked questions

Tombstone requires an electrical permit for: Electrical permit required for electrical installation, alteration, or repair work within Tombstone city limits; Governed by the 1988 National Electrical Code as adopted by the City of Tombstone (Tombstone City Code Section 3-1-4) — no more recent NEC adoption ordinance was located as of this review; New electrical work requires inspection before utility connection, per the codified Building Code chapter; Electrical Plan submittal required showing service entrance/meter/disconnect location, main and subpanel locations, switch/outlet/fixture locations, wiring routing/sizing/circuitry, and a legible panel circuit directory; Temporary Electric Power is a distinct, separately fee-scheduled permit type. If your project isn't listed, confirm with City of Tombstone Building Department at 520-457-3415 before starting work.

In Tombstone, the published Electrical Permit — Based on Valuation is: Same Building Permit valuation table as other trades: $0 ($0-$500.99) scaling to $7,366.30 for the first $1,000,000 plus $4.84 per additional $1,000 above $1,000,000.01. Additional published fees: Electrical Plan Review (includes 1st and 2nd review) — 65% of the Building Permit Fee; Temporary Electric Power — $100.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Tombstone does not publish a plan-review timeline for this permit. Contact City of Tombstone Building Department at 520-457-3415 for current turnaround.

You'll need: Building Permit Application (City of Tombstone, Rev. 1/2024); Electrical Plan. See the required-documents checklist on this page for details on each.

Tombstone requires 2 inspection(s) for an electrical permit, in order: Rough-In, Final. Schedule each through City of Tombstone Building Department (520-457-3415).

Apply through City of Tombstone Building Department at 611 E. Allen Street, Tombstone, AZ 85638 (City Hall: 613 E. Allen Street, Tombstone, AZ 85638). Phone: 520-457-3415, email: buildingofficial@cityoftombstoneaz.gov. Office hours: Monday - Friday, 8:00 AM - 5:00 PM (City of Tombstone Building Inspector page and Building Permit Application, Rev. 1/2024). Building Official/Inspector: Robert Hendrickson. Applications are submitted in person or by mail to the Building Department (P.O. Box 339, Tombstone, AZ 85638); the City does not appear to offer an online e-permitting portal as of this review — all forms found are static PDFs requiring paper/email submittal. Inspections are scheduled by calling 520-457-3415. Projects within the Schieffelin Historic District require Historic Preservation Commission (HPC) approval BEFORE building permit submission/approval, per the Building Permit Application's own header notice.. Official information: https://cityoftombstoneaz.gov/building-inspector/.

Tombstone, Arizona has adopted: Arizona has no statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9). The City of Tombstone is a home-rule city that independently adopts and administers its own construction codes through its own Building Department; it does not defer building permitting to Cochise County despite its small size (2020 Census population 1,307). Source: Tombstone City Code, Title 3 (Building Regulations), Chapter 1 (Building Code), codelibrary.amlegal.com/codes/tombstoneaz (current through Ord. 2025-06, passed 10-14-2025).; 2006 International Residential Code (IRC) and 2006 International Building Code (IBC), adopted by reference as 'the Uniform Building Code' of the City, per Tombstone City Code Section 3-1-1 (Adoption of Building Codes). NOTE: this is a genuinely old code cycle (2006, not a current ICC edition) — confirmed independently via two sources: (1) the codified City Code text itself (accessed via r.jina.ai proxy of codelibrary.amlegal.com/codes/tombstoneaz/latest/tombstone_az/0-0-0-1834, since amlegal.com returns HTTP 403 to a plain fetch), and (2) the Arizona Building Officials (AZBO) statewide directories, which as of the most recent editions searched (2018/2021) listed Tombstone's adopted codes as 2006 IBC/IRC/IMC/IPC and 2005 NEC. The current Building Permit Application (Rev. 1/2024) also cites 'Tombstone City Code, 3-1-1: Adoption of the Uniform Building Code' and references 'Uniform Building Code Permit Requirements' by name, consistent with the 2006-cycle adoption never having been updated to a current ICC edition. Source: Tombstone City Code Section 3-1-1; AZBO Directory (2018, 2021 editions); City of Tombstone Building Permit Application (Rev. 1/2024).; National Electrical Code of 1988, as copyrighted by the National Fire Protection Association, adopted by reference (Tombstone City Code Section 3-1-4, Electrical Code). This is a very old NEC edition (1988) relative to current AZ municipal practice (most Cochise County peers are on 2017 or 2020 NEC) — confirmed via direct code-section fetch; no more recent NEC adoption ordinance was located despite a search for 'building code' + ordinance amendments through the current Ord. 2025-06 code-currency marker. Source: Tombstone City Code Section 3-1-4.; Uniform Plumbing Code, 1988 edition, as copyrighted by the International Association of Plumbing and Mechanical Officials, adopted by reference (Tombstone City Code Section 3-1-5, Plumbing Code) — notably NOT an ICC/IPC adoption but the IAPMO's competing UPC model code, at its 1988 edition. Source: Tombstone City Code Section 3-1-5.; No IMC (mechanical), IFGC (fuel gas), IFC (fire), or IEBC (existing building) adoption was located anywhere in the codified Tombstone City Code Title 3 chapters reviewed, in the current Building Permit Application, or in the AZBO directory search results for Tombstone. This appears to be a genuine gap in the City's own published code structure (mechanical and gas work is folded into the 2006 IBC/IRC's own built-in mechanical/fuel-gas chapters rather than a standalone locally-adopted IMC/IFGC) rather than an extraction failure — the Building Permit Application's own 'Mechanical Plan' and 'Plumbing Plan' submittal-requirement sections cite no separate code title beyond the 'Uniform Building Code' umbrella term used throughout the form. Source: Tombstone City Code Title 3; City of Tombstone Building Permit Application (Rev. 1/2024).; Terminology construction: wherever 'a municipality' appears in the adopted building code, it is held to mean the City of Tombstone; 'corporation counsel' means the city attorney/legal advisor (Tombstone City Code Section 3-1-2, Construction of Terms). Source: Tombstone City Code Section 3-1-2.; Building Official / administrative authority is vested in the office of the City Clerk under the codified ordinance structure, with authority to designate deputies for inspections and other required duties (Tombstone City Code Section 3-1-6); in current practice, the City separately staffs a dedicated Building Official/Inspector position (Robert Hendrickson) rather than routing this through the Clerk's office day-to-day. Source: Tombstone City Code Section 3-1-6 (codified structure); City of Tombstone Building Inspector page (current practice).; Manufactured homes, mobile homes, and factory-built buildings: construction/installation standards for the home itself are regulated directly by the State of Arizona (Department of Fire, Building and Life Safety / Office of Manufactured Housing, A.R.S. Title 41-4001 et seq.), consistent with statewide practice; the City separately issues its own Manufactured Building Permit (flat fee $300.00, including 2 inspections, per the City's November 14, 2025 Fee Schedule) for local placement/site compliance, using its own dedicated Manufactured Building Permit Application form. Source: City of Tombstone Fee Schedule (effective 11/14/2025); Manufactured Building Permit Application (City of Tombstone).. Local amendments apply — see the Tombstone overview page for the full list.

The National Electrical Code of 1988, as adopted by the City of Tombstone (Tombstone City Code Section 3-1-4). This is an old edition relative to most Arizona municipalities; no ordinance updating it to a more recent NEC cycle was located as of this review.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tombstone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.