Electrical Permit in Tombstone, Arizona
Required for electrical installation, alteration, or repair work in Tombstone, governed by the National Electrical Code of 1988 as adopted by the City (Tombstone City Code Section 3-1-4) — a notably old NEC edition relative to Cochise County peers.
Verified 2026-07-07 · Source
When you need this permit
- Electrical permit required for electrical installation, alteration, or repair work within Tombstone city limits
- Governed by the 1988 National Electrical Code as adopted by the City of Tombstone (Tombstone City Code Section 3-1-4) — no more recent NEC adoption ordinance was located as of this review
- New electrical work requires inspection before utility connection, per the codified Building Code chapter
- Electrical Plan submittal required showing service entrance/meter/disconnect location, main and subpanel locations, switch/outlet/fixture locations, wiring routing/sizing/circuitry, and a legible panel circuit directory
- Temporary Electric Power is a distinct, separately fee-scheduled permit type
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Wiring, box placement, and panel connections before walls are closed; part of the combined Plumbing/Mechanical/Electrical rough-in inspection stage
- 2
Final
Devices installed and connections verified per the 1988 NEC as adopted; part of the combined Final Plumbing/Mechanical/Electrical inspection stage
See the full Tombstone inspection guide — scheduling & re-inspection fees →
Tips
- Tombstone's adopted electrical code (1988 NEC) is unusually old — confirmed directly from the codified Tombstone City Code Section 3-1-4 text (fetched via r.jina.ai proxy since amlegal.com 403s plain fetches) and independently corroborated by AZBO's 2018/2021 statewide directory search results listing '2005 NEC' for Tombstone in those years, meaning even the AZBO-listed figure differs from (is newer than) the codified 1988 text — flagging this discrepancy rather than resolving it, since no ordinance amendment bridging 1988 to 2005 (or beyond) was located in the current code library.
- The Fee Schedule has its own distinct 'Electrical (Includes 1st and 2nd review)' line at 65% of the permit fee, separate from the general 'General Plan' review line — confirming electrical work is tracked as its own plan-review category even though it shares the same underlying valuation table as other trades.
- As of July 2026, the City of Tombstone does not publish a permit-specific plan review turnaround time for electrical permits anywhere in its public materials — see the chase-trail documented in the Residential Building Permit entry. Call 520-457-3415 for a current estimate.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tombstone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tombstone
Electrical Permit in other cities
Compare electrical permit fees across Arizona →
Look up this fee in a different city →