Skip to main content
PermitBase

Plumbing Permit in Tombstone, Arizona

Required for plumbing installation, alteration, or repair work in Tombstone, governed by the 1988 Uniform Plumbing Code (UPC) as adopted by the City (Tombstone City Code Section 3-1-5) — notably an IAPMO UPC adoption rather than an ICC/IPC adoption, at a very old edition.

Verified 2026-07-07 · Source

When you need this permit

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping within Tombstone city limits
  • Governed by the Uniform Plumbing Code, 1988 edition (IAPMO), as adopted by the City of Tombstone (Tombstone City Code Section 3-1-5) — the City's plumbing code adoption is the competing UPC model code, not the ICC's IPC used by most Cochise County peers
  • New plumbing work requires inspection before utility connection
  • The Building Inspector may authorize deviations from the plumbing code where public health/safety are not compromised
  • Plumbing Plan submittal required: service entrance locations (water/sewer/gas), fixture/water-heater layout, water and sanitary sewer pipe routing/sizing, water shutoff valve location, septic system routing (if applicable), and gas piping routing/sizing/shutoff locations

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Plumbing Permit — Based on ValuationCity of Tombstone Fee Schedule (effective 11/14/2025) — no separate itemized flat plumbing fee (e.g., per-water-heater) was found; plumbing work is billed on the same general valuation-based Building Permit fee chart.
Same Building Permit valuation table as other trades: $0 ($0-$500.99) scaling to $7,366.30 for the first $1,000,000 plus $4.84 per additional $1,000 above $1,000,000.01
Plumbing Plan Review (includes 1st and 2nd review)City of Tombstone Fee Schedule (effective 11/14/2025), listed as its own line item distinct from the General Plan review line.
65% of the Building Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in Tombstone?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    After pipes installed, before walls closed; part of the combined Plumbing/Mechanical/Electrical rough-in stage

  2. 2

    Gas Piping Test

    After installation of gas lines, dedicated gas piping test inspection

  3. 3

    Final

    Fixtures connected and verified per the 1988 UPC as adopted; part of the combined Final Plumbing/Mechanical/Electrical stage

See the full Tombstone inspection guide — scheduling & re-inspection fees →

Tips

  • Tombstone adopts the Uniform Plumbing Code (IAPMO) rather than the ICC International Plumbing Code used by Cochise County peers such as Bisbee and Benson, per the codified City Code Section 3-1-5 - and at a 1988 edition, with no updating ordinance published. To read the code text yourself, open amlegal.com in an ordinary web browser; it blocks automated access.
  • The Fee Schedule has its own distinct 'Plumbing (Includes 1st and 2nd review)' line at 65% of the permit fee, confirming plumbing is tracked as its own plan-review category despite sharing the underlying valuation table.
  • As of July 2026, the City of Tombstone does not publish a permit-specific plan review turnaround time for plumbing permits anywhere in its public materials — see the chase-trail documented in the Residential Building Permit entry. Call 520-457-3415 for a current estimate.

Frequently asked questions

Tombstone requires a plumbing permit for: Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping within Tombstone city limits; Governed by the Uniform Plumbing Code, 1988 edition (IAPMO), as adopted by the City of Tombstone (Tombstone City Code Section 3-1-5) — the City's plumbing code adoption is the competing UPC model code, not the ICC's IPC used by most Cochise County peers; New plumbing work requires inspection before utility connection; The Building Inspector may authorize deviations from the plumbing code where public health/safety are not compromised; Plumbing Plan submittal required: service entrance locations (water/sewer/gas), fixture/water-heater layout, water and sanitary sewer pipe routing/sizing, water shutoff valve location, septic system routing (if applicable), and gas piping routing/sizing/shutoff locations. If your project isn't listed, confirm with City of Tombstone Building Department at 520-457-3415 before starting work.

In Tombstone, the published Plumbing Permit — Based on Valuation is: Same Building Permit valuation table as other trades: $0 ($0-$500.99) scaling to $7,366.30 for the first $1,000,000 plus $4.84 per additional $1,000 above $1,000,000.01. Additional published fees: Plumbing Plan Review (includes 1st and 2nd review) — 65% of the Building Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Tombstone does not publish a plan-review timeline for this permit. Contact City of Tombstone Building Department at 520-457-3415 for current turnaround.

You'll need: Building Permit Application (City of Tombstone, Rev. 1/2024); Plumbing Plan. See the required-documents checklist on this page for details on each.

Tombstone requires 3 inspection(s) for a plumbing permit, in order: Rough-In, Gas Piping Test, Final. Schedule each through City of Tombstone Building Department (520-457-3415).

Apply through City of Tombstone Building Department at 611 E. Allen Street, Tombstone, AZ 85638 (City Hall: 613 E. Allen Street, Tombstone, AZ 85638). Phone: 520-457-3415, email: buildingofficial@cityoftombstoneaz.gov. Office hours: Monday - Friday, 8:00 AM - 5:00 PM (City of Tombstone Building Inspector page and Building Permit Application, Rev. 1/2024). Building Official/Inspector: Robert Hendrickson. Applications are submitted in person or by mail to the Building Department (P.O. Box 339, Tombstone, AZ 85638); the City does not appear to offer an online e-permitting portal as of the last verification — all forms found are static PDFs requiring paper/email submittal. Inspections are scheduled by calling 520-457-3415. Projects within the Schieffelin Historic District require Historic Preservation Commission (HPC) approval BEFORE building permit submission/approval, per the Building Permit Application's own header notice.. Official information: https://cityoftombstoneaz.gov/building-inspector/.

Tombstone, Arizona has adopted: Arizona has no statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9). The City of Tombstone is a home-rule city that independently adopts and administers its own construction codes through its own Building Department; it does not defer building permitting to Cochise County despite its small size (2020 Census population 1,307). Source: Tombstone City Code, Title 3 (Building Regulations), Chapter 1 (Building Code), codelibrary.amlegal.com/codes/tombstoneaz (current through Ord. 2025-06, passed 10-14-2025).; 2006 International Residential Code (IRC) and 2006 International Building Code (IBC), adopted by reference as 'the Uniform Building Code' of the City, per Tombstone City Code Section 3-1-1 (Adoption of Building Codes). NOTE: this is a genuinely old code cycle (2006, not a current ICC edition), corroborated by two independent sources: (1) the codified City Code text itself (codelibrary.amlegal.com/codes/tombstoneaz/latest/tombstone_az/0-0-0-1834), and (2) the Arizona Building Officials (AZBO) statewide directories, whose most recent editions (2018/2021) list Tombstone's adopted codes as 2006 IBC/IRC/IMC/IPC and 2005 NEC. The current Building Permit Application (Rev. 1/2024) also cites 'Tombstone City Code, 3-1-1: Adoption of the Uniform Building Code' and references 'Uniform Building Code Permit Requirements' by name, consistent with the 2006-cycle adoption never having been updated to a current ICC edition. Source: Tombstone City Code Section 3-1-1; AZBO Directory (2018, 2021 editions); City of Tombstone Building Permit Application (Rev. 1/2024).; National Electrical Code of 1988, as copyrighted by the National Fire Protection Association, adopted by reference (Tombstone City Code Section 3-1-4, Electrical Code). This is a very old NEC edition (1988) relative to current AZ municipal practice (most Cochise County peers are on 2017 or 2020 NEC) — confirmed via direct code-section fetch; no more recent NEC adoption ordinance was located despite a search for 'building code' + ordinance amendments through the current Ord. 2025-06 code-currency marker. Source: Tombstone City Code Section 3-1-4.; Uniform Plumbing Code, 1988 edition, as copyrighted by the International Association of Plumbing and Mechanical Officials, adopted by reference (Tombstone City Code Section 3-1-5, Plumbing Code) — notably NOT an ICC/IPC adoption but the IAPMO's competing UPC model code, at its 1988 edition. Source: Tombstone City Code Section 3-1-5.; Uniform Mechanical Code, 1988 edition, as copyrighted by the International Conference of Building Officials (ICBO), adopted by reference (Tombstone City Code Section 3-1-14, Adoption of Mechanical Code). Like the City's 1988 NEC and 1988 Uniform Plumbing Code adoptions, this is a pre-ICC model code and is not an International Mechanical Code edition. Source: https://codelibrary.amlegal.com/codes/tombstoneaz/latest/tombstone_az/0-0-0-1869.; Section 3-1-14 "ADOPTION OF MECHANICAL CODE" adopts "the certain code entitled uniform mechanical code, 1988 edition, copyrighted by the International Conference Of Building Officials, 1988" (codelibrary.amlegal.com/codes/tombstoneaz/latest/tombstone_az/0-0-0-1869). No IFGC (fuel gas), IFC (fire) or IEBC (existing building) adoption is located in Title 3, and Title 6 "Fire Regulations" contains exactly one section (6-1-1) defining the geographic fire limits under the 1972 Code. Note the mechanical code adopted is the UNIFORM Mechanical Code (ICBO, 1988), not an ICC/IMC edition - consistent with this City's other pre-ICC adoptions (1988 NEC, 1988 Uniform Plumbing Code). Source: Tombstone City Code Sections 3-1-14, 3-1-4, 3-1-5, Title 6.; Terminology construction: wherever 'a municipality' appears in the adopted building code, it is held to mean the City of Tombstone; 'corporation counsel' means the city attorney/legal advisor (Tombstone City Code Section 3-1-2, Construction of Terms). Source: Tombstone City Code Section 3-1-2.; Building Official / administrative authority is vested in the office of the City Clerk under the codified ordinance structure, with authority to designate deputies for inspections and other required duties (Tombstone City Code Section 3-1-6); in current practice, the City separately staffs a dedicated Building Official/Inspector position (Robert Hendrickson) rather than routing this through the Clerk's office day-to-day. Source: Tombstone City Code Section 3-1-6 (codified structure); City of Tombstone Building Inspector page (current practice).; Manufactured homes, mobile homes, and factory-built buildings: construction/installation standards for the home itself are regulated directly by the State of Arizona (Department of Fire, Building and Life Safety / Office of Manufactured Housing, A.R.S. Title 41-4001 et seq.), consistent with statewide practice; the City separately issues its own Manufactured Building Permit (flat fee $300.00, including 2 inspections, per the City's November 14, 2025 Fee Schedule) for local placement/site compliance, using its own dedicated Manufactured Building Permit Application form. Source: City of Tombstone Fee Schedule (effective 11/14/2025); Manufactured Building Permit Application (City of Tombstone).. Local amendments apply — see the Tombstone overview page for the full list.

The Uniform Plumbing Code (UPC), 1988 edition, as published by the International Association of Plumbing and Mechanical Officials and adopted by the City of Tombstone (Tombstone City Code Section 3-1-5) — notably the IAPMO's UPC rather than the ICC's International Plumbing Code used by most neighboring Cochise County jurisdictions.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tombstone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Tombstone's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Tombstone yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Tombstone lands. Privacy.