Plumbing Permit — Tombstone, Arizona · Requirements sheet
Verified 2026-07-07 · Source: https://cityoftombstoneaz.gov/building-inspector/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Tombstone, Arizona
Required for plumbing installation, alteration, or repair work in Tombstone, governed by the 1988 Uniform Plumbing Code (UPC) as adopted by the City (Tombstone City Code Section 3-1-5) — notably an IAPMO UPC adoption rather than an ICC/IPC adoption, at a very old edition.
Verified 2026-07-07 · Source
When you need this permit
- Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping within Tombstone city limits
- Governed by the Uniform Plumbing Code, 1988 edition (IAPMO), as adopted by the City of Tombstone (Tombstone City Code Section 3-1-5) — the City's plumbing code adoption is the competing UPC model code, not the ICC's IPC used by most Cochise County peers
- New plumbing work requires inspection before utility connection
- The Building Inspector may authorize deviations from the plumbing code where public health/safety are not compromised
- Plumbing Plan submittal required: service entrance locations (water/sewer/gas), fixture/water-heater layout, water and sanitary sewer pipe routing/sizing, water shutoff valve location, septic system routing (if applicable), and gas piping routing/sizing/shutoff locations
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
After pipes installed, before walls closed; part of the combined Plumbing/Mechanical/Electrical rough-in stage
- 2
Gas Piping Test
After installation of gas lines, dedicated gas piping test inspection
- 3
Final
Fixtures connected and verified per the 1988 UPC as adopted; part of the combined Final Plumbing/Mechanical/Electrical stage
See the full Tombstone inspection guide — scheduling & re-inspection fees →
Tips
- Tombstone is a rare example of a Uniform Plumbing Code (IAPMO) adoption rather than the more common ICC International Plumbing Code seen at Cochise County peers like Bisbee and Benson — confirmed directly from the codified City Code Section 3-1-5 text (via r.jina.ai proxy since amlegal.com 403s a plain fetch), at a very old 1988 edition with no updating ordinance located.
- The Fee Schedule has its own distinct 'Plumbing (Includes 1st and 2nd review)' line at 65% of the permit fee, confirming plumbing is tracked as its own plan-review category despite sharing the underlying valuation table.
- As of July 2026, the City of Tombstone does not publish a permit-specific plan review turnaround time for plumbing permits anywhere in its public materials — see the chase-trail documented in the Residential Building Permit entry. Call 520-457-3415 for a current estimate.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tombstone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tombstone
Plumbing Permit in other cities
Compare plumbing permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Tombstone project checklist
Describe your project once and get every permit, document, and fee it triggers in Tombstone — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →