Plumbing Permit in Williams, Arizona

Required for plumbing installation, alteration, or repair work in Williams, governed by the International Plumbing Code as adopted and amended by the City (2015 IPC codified by Ordinance No. 956; 2024 IPC per the City's current Design Criteria sheet), including local sewer-depth, urinal flow-rate, and tracer-wire amendments.

Verified 2026-07-07 · Source

When you need this permit

  • Plumbing permit required for installation, alteration, or repair of plumbing systems and fixtures, submitted via the same Building Permit Application form (Plumbing checkbox under Type of Improvement)
  • Governed by the IPC as adopted by the City of Williams (2015 IPC per codified Ordinance No. 956; 2024 IPC per the current Building and Design Criteria sheet)
  • Sewer lines connecting to the public sanitary system must be installed not less than 12 inches below grade; private sewage disposal systems (septic) are regulated by Coconino County Health Department
  • Urinal maximum flow rate is locally amended to 1.0 pint per flushing cycle (IPC Table 604.4)
  • Non-metallic building sewer piping must include a plastic-covered #14 AWG type UF 600V green tracer wire taped to the top of the pipe (minimum 10-mil tape)
  • Waste water/septic system approval letter from Coconino County Environmental/Health Department required where applicable

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing Permit FeeCity of Williams Ordinance No. 956, IPC §§ 106.6.2/106.6.3 as amended (cross-referencing the IBC § 109.2 Council-resolution fee schedule). No itemized fee table was found published — confirmed gap; contact the Building Department (928-635-4451 ext. 205).
Fee schedule as established by City of Williams resolution of the City Council (exact dollar amounts not published)

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in Williams?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts, tracer wire on non-metallic sewer piping

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

See the full Williams inspection guide — scheduling & re-inspection fees →

Tips

  • Plumbing is a 'fixed fee permit' under Ordinance No. 956 with a 180-day maximum validity period, distinct from the longer 365-day validity for new construction/remodel building permits.
  • The green #14 AWG tracer-wire requirement on non-metallic building sewer piping is a Williams-specific amendment not found in the base IPC — confirm this detail with installers unfamiliar with the local code.
  • Given Williams' rural/forested setting, a meaningful share of plumbing permits involve septic rather than public sewer — factor in Coconino County Health Department approval lead time separately from the City's own plumbing permit review.

Frequently asked questions

Yes — a waste water/septic system approval letter from Coconino County Environmental/Health Department is required as part of the City's residential submittal packet whenever a property is not on public sewer.

In Williams, the published Plumbing Permit Fee is: Fee schedule as established by City of Williams resolution of the City Council (exact dollar amounts not published). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Williams does not publish a plan-review timeline for this permit. Contact City of Williams Building Department at 928-635-4451 ext. 205 for current turnaround.

You'll need: City of Williams Building Permit Application. Depending on your project, Williams may also ask for: Septic System Approval Letter. See the required-documents checklist on this page for details on each.

Williams requires 3 inspection(s) for a plumbing permit, in order: Underground/Slab, Rough-In, Final. Schedule each through City of Williams Building Department (928-635-4451 ext. 205).

Apply through City of Williams Building Department at 113 South 1st Street, Williams, AZ 86046-2549. Phone: 928-635-4451 ext. 205, email: tmartinez@williamsaz.gov. Office hours: Phone 928-635-4451, fax 928-635-4495. Chief Building Inspector / Building Official: Tim Martinez (928-295-5478, tmartinez@williamsaz.gov) handles building permit review and issuance; Building Official Raul Hatch (928-635-4451 / 928-295-5478, rhatch@williamsaz.gov) is listed as the signing official on the Fence and Demolition permit application forms — the department appears to operate with more than one Building Official-titled staff member across different permit forms as of 2025. Applications are submitted in person or by mail using the City's paper Building Permit Application (no online portal was found); permits are picked up and fees paid at the City Hall front desk. Two sets of construction documents/plans required for submittal.. Official information: https://www.williamsaz.gov/departments_and_services/building_department.

Williams, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9). The City of Williams runs its own independent Building Department and adopts and administers its own construction codes; it does not defer building permitting to Coconino County. Source: City of Williams Building Department page (williamsaz.gov/departments_and_services/building_department); City of Williams Code of Ordinances Title 7, Chapter 7-1.; The City's currently codified adoption (Ordinance No. 956 / referenced in the code index as 'Ordinance No. 1007', adopted 10-27-2016, effective 1-1-2017) sets the 2015 editions of the International Building Code (IBC), International Residential Code (IRC), International Mechanical Code (IMC), International Plumbing Code (IPC), International Fire Code (IFC), International Fuel Gas Code (IFGC), International Property Maintenance Code (IPMC), and International Existing Building Code (IEBC), plus the 2014 National Electrical Code (NEC), each with City of Williams amendments layered on by article (e.g., Art. 1.02 amends the IBC, Art. 1.12 amends the IRC, etc.). Source: City of Williams Ordinance No. 956 (PDF, 'Adopted Building Codes Ordinance and Amendments'), Title 7, Chapter 7-1.; IMPORTANT CODE-CYCLE UPDATE FOUND: a separate, more recent 'Building and Design Criteria Submittal Requirements' document published directly on the City's Building Department page lists the DESIGN CODES as the 2024 editions of the IBC, IRC, IMC, IPC, IFC, IFGC, IPMC, and IEBC, plus the 2023 NEC and the Americans with Disabilities Act Accessibility Guidelines — this is a full code-cycle jump from the 2015/2014 cycle codified in Ordinance No. 956/1007. No corresponding new numbered ordinance repealing/replacing Ordinance No. 956 was found published in the American Legal Publishing code library or via Wayback Machine as of July 2026, but the City's own current-facing submittal-requirements document (undated but filename '2024 Design Criteria.pdf', hosted directly under the Building Department page alongside a 2024-cycle Solar Policy and 2025-dated fillable permit application forms) is the most current, most directly-published statement of which code edition the City is actually enforcing for new submittals as of this writing. Both the 2015-cycle codified ordinance and the 2024-cycle submittal-requirements sheet are cited throughout this record; where they conflict, the 2024 Design Criteria document is treated as controlling for current practice, with the codified Ordinance No. 956 amendments (administrative sections, fee/refund cross-references, permit expiration rules) still applicable since no repeal was found. Source: City of Williams 'Building and Design Criteria Submittal Requirements' (2024 Design Criteria.pdf); City of Williams Ordinance No. 956; Williams, AZ Code of Ordinances current through 2025 S-7 supplement (no Title 7 building-code ordinance number newer than 956/1007 appears in the codified index).; Chief Building Inspector / Building Official authority (Ordinance No. 956, Section 103.1 amendments to IBC/IRC/IMC/IPC/IEBC): the Department of Building Safety is created, headed by the Chief Building Inspector, and the terms 'Chief Building Inspector' and 'Building Official' are treated as one and the same throughout the adopted codes. Source: City of Williams Ordinance No. 956.; All buildings constructed or placed within city limits must meet the required Uniform Building Code (as locally adopted), except mobile homes and modular homes when specifically allowed by the Zoning Code. Source: Williams, AZ Code of Ordinances § 158.126 Building Permit and Plot Plan Required (Prior Code § 12-7.02; Ord. 747, passed 1995).; Building permit and plot-plan application procedure is governed by Code of Ordinances Chapter 154 (Development Procedures), § 154.018 Plot Plan and Building Permit: a plot plan and required fees are submitted to the City Planner; work within the Main Street District (including the Historic Preservation District) is forwarded to the Main Street Design Committee for review; each reviewing city department reviews plot plan applications on Monday and/or Tuesday of each week, ensuring staff review within six working days; the applicant then meets with the Chief Building Official, makes final changes, and submits four copies of the approved plot plan; a memorandum of agreement for public improvements (where applicable) must be signed before permit issuance; the applicant then submits a Building Permit Application and two sets of building plans to the Chief Building Official, which are reviewed by city staff or a referred architecture/engineering consultant, with the permit issued upon approval and fee payment. Source: Williams, AZ Code of Ordinances § 154.018 Plot Plan and Building Permit.; Commercial plans (new construction/alterations of 3,000 sq ft or more, major electrical/mechanical/plumbing improvements or replacements, housing of more than 4 units, or public improvements) must be sealed by a qualified Arizona-licensed architect and/or engineer per A.R.S. § 32-144; motels and restaurants additionally require a copy of approval-to-construct from the Coconino County Health Department (928-679-7120) before a City permit is issued. Source: City of Williams 'Procedure to Obtain Building Permit'.; Residential single-family detached structures are exempt from the Arizona Design Professional (architect/engineer stamp) requirement under A.R.S. § 32-121 et seq. unless circumstances dictate otherwise; duplexes/triplexes under 3,000 sq ft, two stories, or 20 total occupant load, with a single owner, may also be designed by a non-registrant. Sub-assemblies (roof trusses, manufactured floor beams) with imposed loading indicated may be submitted without a design-professional stamp. Retaining walls with unbalanced loading exceeding 4 feet must be designed by an Arizona-certified/registered design professional. Source: City of Williams Ordinance No. 956, IBC § 107.1 / IRC § R106.1.1 amendments.; Manufactured homes and mobile homes are permitted under Arizona's statewide Office of Manufactured Housing licensing/installation-permit structure (Arizona Department of Housing) for factory-built construction standards, layered with City of Williams local zoning/site/plot-plan compliance review — the City's own Zoning Code (§ 158.126) explicitly carves mobile homes and modular homes out of the standard Uniform Building Code requirement 'when specifically allowed by this chapter,' i.e., subject to zoning-specific provisions rather than the general IBC/IRC track. Source: Williams, AZ Code of Ordinances § 158.126; Arizona Department of Housing, Office of Manufactured Housing, Installation Permits page.. Local amendments apply — see the Williams overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Williams building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.