Sign Permit (Commercial / Business Signage) — Chandler, Arizona · Requirements sheet
Verified 2026-07-23 · Source: https://www.chandleraz.gov/sites/default/files/departments/development-services/City-of-Chandler-Sign-Permit-Checklist-2026.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit (Commercial / Business Signage) in Chandler, Arizona
A sign permit is required in Chandler for new commercial/business signage, including illuminated and non-illuminated wall signs and freestanding monument signs. Sign permits are administered by the Development Services Department's Planning Division (not Building Safety) and must be submitted through the Citizen Access portal under the Planning tab. The base sign permit fee is 2.5% of the listed job valuation plus $0.25 per square foot of sign area; illuminated signs add a flat $60.00 electrical inspection fee. No up-front fees are collected at time of application submittal. Per the Planning Division's published time frames, overall review takes up to 90 working days (30 working days for completeness review plus 60 working days for substantive review).
Verified 2026-07-23 · Source
When you need this permit
- Submit through the Citizen Access portal: under the Planning tab, select Create an Application and choose the Sign Permit option
- Provide accurate property address (with correct suite number if applicable), current licensed Sign/Electrical/General contractor information, and a sign/project cost or valuation
- Documentation of Property Manager/Property Owner authorization for the sign (a letter, a signed contractor authorization form, or sign details signed by the owner/property manager)
- Sign details: building elevations showing the new sign on the building; sign type, illumination type, and dimensions (total sign height and width); sign cross-section; footing details for ground signs; complete description of sign materials and finishes
- Engineering is required for ground signs over 7 feet tall
- Site plan: a map or aerial photo indicating the locations of all proposed signs
- Submit one electronic copy of all required documents in 8.5 x 11 or 11 x 17 sheet sizes; reviewer may request additional documentation after submittal
- Any monument sign tenant ID panels must be reviewed along with the building signage
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
520-Electrical / 530-Footing
Required for illuminated wall signs and new freestanding monument signs; must be approved prior to scheduling the 510-Final inspection. Schedule by calling (480) 782-3100.
- 2
510-Final
All signs must be inspected after installation is complete. Non-illuminated wall signs and monument sign panels only need this final inspection (no electrical/footing inspection required).
See the full Chandler inspection guide — scheduling & re-inspection fees →
Tips
- No up-front fees are collected at the time of application submittal — the base sign fee and any electrical inspection fee are assessed during review.
- All new sign permit submittals must be done through the electronic Citizen Access portal; for help, email plans.coordination@chandleraz.gov or call (480) 782-3074.
- Engineering is required for ground/monument signs taller than 7 feet.
- Illuminated wall signs and new freestanding monument signs need the 520-Electrical and/or 530-Footing inspection before the 510-Final; non-illuminated wall signs and monument sign panels only need the 510-Final.
- Sign permits are handled by the Planning Division (Kevin Mayo, 480-782-3068), a separate point of contact from Building Safety's valuation-based permit types.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Chandler building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Chandler
Sign Permit (Commercial / Business Signage) in other cities
Compare sign permit (commercial / business signage) fees across Arizona →
Look up this fee in a different city →