Plumbing Permit — Chandler, Arizona · Requirements sheet
Verified 2026-07-16 · Source: https://www.chandleraz.gov/government/departments/development-services/building-safety-plan-review-permits-and-inspections
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Chandler, Arizona
Plumbing work in Chandler is governed by the 2024 International Plumbing Code (IPC) with Chandler amendments (Ordinance No. 5108, City Code Chapter 29, Article IV). Plumbing permits are required for new plumbing installations, additions to, or modifications of existing plumbing systems. Like-for-like replacement of water heaters and water softeners is explicitly exempt from permit per the Homeowner's Building Permit Manual. Minor residential work combining 1–6 plumbing openings with minor gas or electrical work qualifies for a flat $100.00 miscellaneous fee.
Verified 2026-07-16 · Source
When you need this permit
- Plumbing work must comply with the 2024 IPC with Chandler amendments (Ordinance No. 5108, City Code Chapter 29, Article IV)
- Apply through the Citizen Access portal or walk-in to 215 E. Buffalo St.
- Like-for-like replacement of water heaters and water softeners does NOT require a permit (Homeowner's Building Permit Manual)
- For additions with new plumbing fixtures, provide a Water Meter Worksheet (Appendix A of the Homeowner's Building Permit Manual); water meter worksheet information must appear on the plans, not a separate sheet
- Minimum water meter size for new construction is 1 inch
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Plumbing (groundwork)
Under-floor building drain installed, shaded and under pressure test, but not covered.
- 2
Water piping (groundwork)
All under-floor water piping installed but not covered.
- 3
Building sewers
Sewer piping installed, shaded, and properly supported, but not covered.
- 4
Upper-level drainage
Tubs filled to flood rim (upper-level drainage test).
- 5
Rough plumbing
All rough-in plumbing installed and under pressure test, but not covered.
- 6
Final inspection
All plumbing work completed per approved plans and the 2024 IPC with Chandler amendments.
See the full Chandler inspection guide — scheduling & re-inspection fees →
Tips
- Like-for-like replacement of residential water heaters and water softeners does NOT require a permit in Chandler.
- When adding plumbing fixtures, include a Water Meter Worksheet (per Appendix A of the Homeowner's Manual) on the plans — it cannot be a separate sheet.
- Minimum water meter size for new construction is 1 inch.
- Contact Arizona Blue Stake (811) at least two days before any underground plumbing work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Chandler building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Chandler
Plumbing Permit in other cities
Compare plumbing permit fees across Arizona →
Look up this fee in a different city →