Plumbing Permit in Chandler, Arizona
Plumbing work in Chandler is governed by the 2024 International Plumbing Code (IPC) with Chandler amendments (Ordinance No. 5108, City Code Chapter 29, Article IV). Plumbing permits are required for new plumbing installations, additions to, or modifications of existing plumbing systems. Like-for-like replacement of water heaters and water softeners is explicitly exempt from permit per the Homeowner's Building Permit Manual. Minor residential work combining 1–6 plumbing openings with minor gas or electrical work qualifies for a flat $100.00 miscellaneous fee.
Verified 2026-06-29 · Source
When you need this permit
- Plumbing work must comply with the 2024 IPC with Chandler amendments (Ordinance No. 5108, City Code Chapter 29, Article IV)
- Apply through the Citizen Access portal or walk-in to 215 E. Buffalo St.
- Like-for-like replacement of water heaters and water softeners does NOT require a permit (Homeowner's Building Permit Manual)
- For additions with new plumbing fixtures, provide a Water Meter Worksheet (Appendix A of the Homeowner's Building Permit Manual); water meter worksheet information must appear on the plans, not a separate sheet
- Minimum water meter size for new construction is 1 inch
Required documents
- Req
Building Permit Application
Chandler permit application used for plumbing work; available at Citizen Access portal
- Opt
Water Meter Worksheet
Required when adding plumbing fixtures; information must appear on the plans. A sample worksheet (Appendix A) is in the Homeowner's Building Permit Manual
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Miscellaneous minor residential work — flat fee (1–6 plumbing openings combined with minor gas/electrical) | $100.00 | City of Chandler Fee Schedule, Section 4.6.4(q): 'Miscellaneous minor residential work (1–6 gas outlets, 1–2 branch electrical circuits, 1–6 plumbing openings, etc.) — $100.00.' Applies to minor scope only. |
| Plumbing permit — valuation-based (larger projects) | Per valuation-based fee table (§4.6.1); plan review 65% of permit fee | For plumbing work not covered by the miscellaneous flat fee, fees follow the valuation-based table (City of Chandler Fee Schedule §4.6.1, Res. 4703). |
Review timeline
~1–10 business days
Typical estimate — confirm current times with the Chandler building department
Inspection process
- 1
Plumbing (groundwork)
Under-floor building drain installed, shaded and under pressure test, but not covered.
- 2
Water piping (groundwork)
All under-floor water piping installed but not covered.
- 3
Building sewers
Sewer piping installed, shaded, and properly supported, but not covered.
- 4
Upper-level drainage
Tubs filled to flood rim (upper-level drainage test).
- 5
Rough plumbing
All rough-in plumbing installed and under pressure test, but not covered.
- 6
Final inspection
All plumbing work completed per approved plans and the 2024 IPC with Chandler amendments.
Tips
- Like-for-like replacement of residential water heaters and water softeners does NOT require a permit in Chandler.
- When adding plumbing fixtures, include a Water Meter Worksheet (per Appendix A of the Homeowner's Manual) on the plans — it cannot be a separate sheet.
- Minimum water meter size for new construction is 1 inch.
- Contact Arizona Blue Stake (811) at least two days before any underground plumbing work.
Frequently asked questions
- Do I need a permit to replace a water heater in Chandler?
- No. Like-for-like replacement of residential water heaters (and water softeners) is explicitly exempt from permit requirements per the City of Chandler Homeowner's Building Permit Manual (Rev. 4/09/26). Source: Homeowner's Building Permit Manual, 'Work Exempt from Permit' section, item 10.
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
- City of Chandler Development Services Department — Building Safety — official building department
- Building Safety: Plan Review, Permits and Inspections | City of Chandler
- Homeowner's Building Permit Manual (Rev. 4/09/26) — PDF
- Chandler Amendments to the 2024 International Construction Codes — 2024 IPC (Article IV) — PDF
- City of Chandler Fee Schedule (§4.6.1, §4.6.4(q)) — PDF
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Chandler building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Chandler
Related guides
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.