Skip to main content
PermitBase

Change of Use / Change of Occupancy in Littleton, Colorado

No standalone City of Littleton 'Change of Use' or 'Change of Occupancy' permit application distinct from the general Building & Development permitting process was independently confirmed against directly-quoted primary-source text during this review. Separately, South Metro Fire Rescue (which provides fire protection for Littleton) charges its own itemized 'Change of Use' fire-code compliance review fee of $587.99 ($174.24 plan check + $413.75 inspection), per its Systems and Other Fees schedule effective 1/1/2026 — confirming that a change of use in Littleton triggers, at minimum, a real fire-district review process even if the City's own change-of-use process could not be separately documented in this pass.

Reviewed 2026-08-14 · Source

When you need this permit

  • No standalone City change-of-use application distinct from the general Building & Development permitting process was independently confirmed during this review
  • CONFIRMED: South Metro Fire Rescue charges a $587.99 'Change of Use' fire-code compliance review fee ($174.24 plan check + $413.75 inspection), per its Systems and Other Fees schedule effective 1/1/2026
  • Contact the Permit Center (303-795-3751, permits@littletonco.gov) to confirm the City-side requirements and applicable fee schedule for a specific change-of-use project

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

South Metro Fire Rescue — Change of Use (fire review)SMFR Systems and Other Fees, effective 1/1/2026
$587.99 total ($174.24 plan check + $413.75 inspection)
City of Littleton Building Permit Fee (if applicable)Per the City's adopted Permit Fee Schedule (Resolution No. 08, Series 2025); specific change-of-use line-item amounts were not independently extracted during this review. Contact the Permit Center (303-795-3751) for a current quote.
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Change of Use / Change of Occupancy permit actually take in Littleton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Fire Code Compliance Inspection (South Metro Fire Rescue)

    Billed as part of SMFR's $587.99 Change of Use fee ($413.75 inspection component)

See the full Littleton inspection guide — scheduling & re-inspection fees →

Tips

  • A change of use in Littleton is confirmed to trigger a real, itemized $587.99 fire-code compliance review from South Metro Fire Rescue — budget for that fee even though this file could not independently confirm the City of Littleton's own change-of-use application process in this pass.

Frequently asked questions

Littleton requires a change of use / change of occupancy permit for: No standalone City change-of-use application distinct from the general Building & Development permitting process was independently confirmed during this review; CONFIRMED: South Metro Fire Rescue charges a $587.99 'Change of Use' fire-code compliance review fee ($174.24 plan check + $413.75 inspection), per its Systems and Other Fees schedule effective 1/1/2026; Contact the Permit Center (303-795-3751, permits@littletonco.gov) to confirm the City-side requirements and applicable fee schedule for a specific change-of-use project. If your project isn't listed, confirm with City of Littleton Building and Code Compliance Division (Community Development Department, Permit Center) at 303-795-3751 before starting work.

In Littleton, the published South Metro Fire Rescue — Change of Use (fire review) is: $587.99 total ($174.24 plan check + $413.75 inspection). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Littleton does not publish a plan-review timeline for this permit. Contact City of Littleton Building and Code Compliance Division (Community Development Department, Permit Center) at 303-795-3751 for current turnaround.

You'll need: Building Permit Application (Change of Use). See the required-documents checklist on this page for details on each.

Littleton requires 1 inspection(s) for a change of use / change of occupancy permit, in order: Fire Code Compliance Inspection (South Metro Fire Rescue). Schedule each through City of Littleton Building and Code Compliance Division (Community Development Department, Permit Center) (303-795-3751).

Apply through City of Littleton Building and Code Compliance Division (Community Development Department, Permit Center) at Littleton Center, 2255 W. Berry Avenue, Littleton, CO 80120. Phone: 303-795-3751, email: permits@littletonco.gov. Office hours: Permit Center: Monday-Thursday 8:00 a.m.-4:30 p.m., Fridays closed; in-person walk-in hours limited to Monday 1:00-4:30 p.m. (no walk-ins after 4:15 p.m.) and Thursday 8:00-11:30 a.m.; Building Inspections staff hours 7:30 a.m.-4:30 p.m. Monday-Friday. FAX 720-741-0210, eFax 720-384-0601.. Official information: https://www.littletonco.gov/Building-Development.

Littleton, Colorado has adopted: 2024 International Building Code (IBC) — City of Littleton Building Codes and Amendments page; 2024 International Residential Code (IRC); 2024 International Energy Conservation Code (IECC); 2024 International Existing Building Code (IEBC); 2024 International Fuel Gas Code (IFGC); 2024 International Mechanical Code (IMC); 2024 International Plumbing Code (IPC) — Littleton uses the International Plumbing Code, not the Uniform Plumbing Code; 2024 International Property Maintenance Code (IPMC); 2024 International Swimming Pool and Spa Code (ISPSC); 2024 International Wildland-Urban Interface Code (IWUIC); 2024 International Fire Code (IFC); ICC A117.1-2017 Standard with Supplement 1 — Accessible and Usable Buildings and Facilities; NFPA 70 National Electrical Code, 2026 Edition ("2026 NEC"); 1997 Uniform Code for the Abatement of Dangerous Buildings (International Conference of Building Officials); Colorado Model Electric Ready and Solar Ready Code, adopted by the Colorado Department of Local Affairs and Colorado Energy Office effective June 1, 2023; Littleton City Code Title 4, Chapter 1 — local IRC amendments including adopted Climatic and Geographic Design Criteria (Table R301.2): Ground Snow Load 40 psf (non-reducible), Ultimate Design Wind Speed 136 mph; Littleton City Code Title 3, Chapter 16 — Contractor Licensing (license/registration required to obtain permits within city limits, effective July 1, 1985). Local amendments apply — see the Littleton overview page for the full list.

The City's own standalone change-of-use process could not be independently confirmed during this review, but South Metro Fire Rescue (Littleton's fire provider) does charge a specific $587.99 'Change of Use' fire-code compliance review fee. Contact the Permit Center (303-795-3751) to confirm the City-side process for a specific project.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-08-14.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Littleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.