Plumbing Permit — Littleton, Colorado · Requirements sheet
Verified 2026-07-05 · Source: https://www.littletonco.gov/Building-Development/Permits-Review-Guides-and-Requirements/Building-Codes-Amendments-Division-Policies
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Littleton, Colorado
Required for installation, alteration, or repair of plumbing systems in Littleton. Governed by the 2024 International Plumbing Code (IPC), not the Uniform Plumbing Code. Plumbing contractors must hold an active Colorado DORA Master's/Journeyman's license AND State Contractor's License, in addition to a City of Littleton Contractor's License.
Verified 2026-07-05 · Source
When you need this permit
- Permit required for plumbing system installation, alteration, or repair, per the City's Building Permit FAQ
- Littleton uses the 2024 IPC, not the UPC
- Contractors must hold proof of active Colorado DORA Master's/Journeyman's License and State Contractor's License matching current DORA record, plus a City of Littleton Contractor's License Contractor
- Gas piping submittals require isometric drawings showing incoming pressure/pressure drop, BTU demand per appliance, pipe material/diameter/length, shutoff valve locations, and burial depth; pressure test at minimum 10 psig for a minimum 15 minutes
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Plumbing
Waste/vent/water/gas piping installed and tested before concealment; must be approved (with rough electrical and rough heating) before rough framing inspection
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
See the full Littleton inspection guide — scheduling & re-inspection fees →
Tips
- Littleton follows the IPC, not the UPC — verify fixture-unit and pipe-sizing calculations against IPC tables.
- Gas piping pressure tests must run a minimum of 15 minutes at a minimum of 10 psig — schedule the rough inspection window accordingly.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-05.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Littleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Littleton
Plumbing Permit in other cities
Compare plumbing permit fees across Colorado →
Look up this fee in a different city →