Roofing Permit (Reroof) — Littleton, Colorado · Requirements sheet
Verified 2026-07-05 · Source: https://www.littletonco.gov/files/sharedassets/public/v/3/building-amp-development/documents-building/roofing/policy-24-001-roof-covering-and-installation-requirements-5th-revision-final.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Roofing Permit (Reroof) in Littleton, Colorado
Required for roof covering replacement or overlay exceeding one square (100 sq ft) aggregate area in Littleton. Governed by detailed City Roof Covering Installation and Inspection Requirements Policy #24-001 (5th Revision, 5/21/2026), including mandatory full tear-off, wind/snow-rated material requirements, and a defined roof-repair-vs-replacement threshold.
Verified 2026-07-05 · Source
When you need this permit
- A permit is required for replacement/removal of more than one square (100 sq ft aggregate) of existing roof covering; equal to or less than one square is deemed 'roof repair' and does not require replacement of the entire roof (Policy #24-001, Section 3)
- Littleton REQUIRES FULL TEAR-OFF TO DECK for asphalt, metal, or clay/concrete tile roofs — no overlays are accepted on those materials (Policy #24-001, Section 1.1); membrane-type roof overlays ARE permitted under Section 2, but mineral-surfaced roll roofing is NOT permitted anywhere in the City
- Roofing materials must be listed/rated for the City's adopted design criteria (Ground Snow Load 40 psf non-reducible, Ultimate Design Wind Speed 136 mph): Asphalt shingles ASTM D7158 Class H (up to 150 mph); Metal roofing UL 580/ASTM E1592 (150+ mph); Clay/concrete tile ASTM C1167 (150+ mph, high-wind install)
- Manufacturer's specifications demonstrating wind-load compliance must be submitted at permit intake; permits will not be accepted without this documentation
- Ice and water barrier underlayment (ASTM D1970) required at eaves of all conditioned structures, extending minimum 2 feet inside the exterior wall line; valley treatment per Policy #24-001 Section 1.4
- Asphalt shingles must comply with 2024 IRC Section R905.2.4 / ASTM D3462, nailed with minimum 6 nails per shingle; may not be installed below 2/12 pitch; double underlayment or ice/water barrier required between 2/12 and 4/12 pitch
- Roof decks with spaced/board sheathing having gaps exceeding 1/2 inch must be overlaid or replaced with minimum 3/8-inch panel sheathing; a Building Division sheathing-fastening inspection is required before underlayment/covering installation
- If City records indicate an existing photovoltaic (solar) system, roof permit issuance is delayed until a City-licensed solar contractor has obtained a separate permit to remove/replace the solar assembly (Policy #24-001, Section 4)
- Permit must be displayed in a location visible from the street prior to work commencement
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Sheathing Fastening Inspection (if sheathing overlaid/replaced)
Required by Building Division staff before installation of roof underlayment or coverings, when deck sheathing gaps exceed 1/2 inch
- 2
Final Roof Inspection
An OSHA-compliant ladder rated for 250+ lb capacity, extending 3 feet above the roof eave, must be provided and secured; roof must be free of rain, frost, ice, and snow on inspection day; inspectors will not enter fenced/rear yards without permission
See the full Littleton inspection guide — scheduling & re-inspection fees →
Tips
- Littleton requires FULL TEAR-OFF for asphalt, metal, and clay/concrete tile roofs — there is no overlay option for these materials, unlike many peer jurisdictions that permit one overlay layer.
- Bring manufacturer wind/snow-rating documentation to permit intake — the City will not even ACCEPT the permit application without it, not just flag it during review.
- If your home has any City-recorded solar/PV system, expect your roofing permit to be held until the solar contractor pulls a separate removal/reinstall permit — sequence your project timeline accordingly.
- A ladder rated for 250+ lbs, secured and extended 3 feet above the eave, is mandatory at final inspection, and the roof must be free of rain/frost/ice/snow that day — schedule around weather.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-05.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Littleton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Littleton
Roofing Permit (Reroof) in other cities
Compare roofing permit (reroof) fees across Colorado →
Look up this fee in a different city →
Related guides