Residential Building Permit (New Construction) in Fort Collins, Colorado

Required for new single-family homes, townhomes, and duplex/ADU new construction in Fort Collins. Reviewed against the 2024 IRC with 2024 Fort Collins Amendments and the 2024 IECC with Fort Collins energy/green amendments. Fee is calculated from the Fee Schedules occupancy-based rate table (R-3 = $0.65/sq ft), split 35% Plan Check / 65% Building Permit.

Verified 2026-06-30 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building Permit Fee — R-3 (Single Family Detached/Duplex)$0.65 per square foot of project areaCity of Fort Collins Fee Schedules page — Applicable Fee Rates Per Square Foot table; example given: 3,500 sq ft x $0.65 = $2,275 total
Plan Check Fee35% of total fee, due at applicationCity of Fort Collins Fee Schedules page — Fees for New Construction Projects
Building Permit Fee (remainder)65% of total fee, due at permit issuanceCity of Fort Collins Fee Schedules page
Sales TaxCalculated based on total project valuation (materials and labor)City of Fort Collins Sales Tax page — current rates apply; billed via project cost reports at close-out
Transportation Capital Expansion Fee (TCEF)Varies — applies to new buildings/major changes that create additional trafficCity of Fort Collins Fee Schedules page; exact amount not itemized on the general fee page — confirm at application

Review timeline

~00 business days

Typical estimate — confirm current times with the Fort Collins building department

Inspection process

  1. 1

    Setback and Footing

    Inspection of footing formwork prior to concrete being poured

  2. 2

    Foundation

    Inspection of foundation formwork prior to concrete being poured

  3. 3

    Rough Frame / Rough Plumbing / Rough Electric / Rough Mechanical

    Framing, plumbing, electric, and mechanical rough-ins — done before or concurrently, before interior insulation installed

  4. 4

    Insulation

    After all rough inspections approved, verifies air sealing and R-values match approved energy documents, before drywall

  5. 5

    Final Building

    After all work shown on approved plans is complete, including Final Plumbing, Final Electric, and Final Mechanical

Tips

Frequently asked questions

What building code edition does Fort Collins use?
As of April 1, 2026, Fort Collins requires the 2024 International Building Code and International Residential Code with Fort Collins Amendments, plus the 2024 IECC with Fort Collins energy amendments. The prior 2021-cycle codes remain available for reference until Oct. 1, 2026.
How is the building permit fee calculated in Fort Collins?
Fort Collins calculates new-construction fees by multiplying total project square footage by an occupancy-category rate (e.g., $0.65/sq ft for R-3 single-family/duplex). The total is split 35% Plan Check Fee (due at application) and 65% Building Permit Fee (due at issuance).

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fort Collins building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Fort Collins

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.