Deck / Patio Permit — Hudson, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://hudsonco.gov/193/Permits-and-Licenses
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Deck / Patio Permit in Hudson, Colorado
Required for deck and patio installations in Hudson, explicitly listed among the Town's standard residential building-permit application categories. Reviewed under the 2018 IRC as locally amended, including guardrail requirements for elevated decks/window wells per the Town's amended IRC guard provisions.
Verified 2026-07-06 · Source
When you need this permit
- Reviewed under the 2018 IRC as locally amended
- Guardrails required around any deck, stair well, or similar opening located less than 36 inches from the nearest walking surface and more than 30 inches below/above surrounding grade, per IRC Sec. R321.1.1 as amended
- Platforms/decks/landings attached to or placed adjacent to a building do NOT qualify for the general 30-inch-above-grade platform exemption — that exemption explicitly excludes attached decks per the 'When is a Permit Needed?' guide
- Foundation/footing design for elevated decks subject to the same 30-inch frost line depth as other residential construction
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Footing/Foundation
Before concrete pour, per 30-inch minimum frost line depth
- 2
Framing
Ledger attachment, joists, posts, and guardrail framing before decking installed
- 3
Final Inspection
Decking, guardrails, and stairs complete per approved plans
See the full Hudson inspection guide — scheduling & re-inspection fees →
Tips
- A deck or patio attached to a building is NOT covered by the Town's general 30-inch platform-height permit exemption — that exemption is explicitly limited to platforms/walks/driveways not attached to or adjacent to a structure.
- Guardrails are required on any attached deck/well configuration meeting the Town's 36-inch-proximity / 30-inch-depth trigger — confirm your deck height and setback from any adjacent well or drop before finalizing plans.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Checklists & handouts
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hudson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Hudson's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Hudson yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Hudson lands. Privacy.
Other permits in Hudson
Deck / Patio Permit in other cities
Compare deck / patio permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Hudson project checklist
Describe your project once and get every permit, document, and fee it triggers in Hudson — in one checklist. Free, for any city and any number of projects.
Get started →