Solar (Rooftop PV) Permit in Hudson, Colorado
Required for photovoltaic solar installations in Hudson, billed under a dedicated PV Solar fee tier distinct from the general electrical fee schedule. The Town's live Building page notes the pending 2024 code adoption will include 'Solar and EV-ready provisions' via the Colorado Model Electric and Solar Ready Code, 2023 Edition (still in draft/proposal status as of the last verification).
Verified 2026-07-20 · Source
When you need this permit
- Listed under the Town's Permits and Licenses residential application categories ('Solar installations and energy compliance certificates')
- Billed under a dedicated PV Solar fee tier (Residential/Commercial) distinct from the general 'All Other' electrical fee schedule
- Electrical contractors performing PV interconnection work must hold a current Colorado state electrical license
- The Colorado Model Electric and Solar Ready Code, 2023 Edition (HB22-1362 implementing framework) is drafted for local adoption as new Sec. 18-43/18-44 but not yet confirmed adopted in the live-codified Municode chapter as of the last verification
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before cover
- 2
Final Inspection
Racking, roof penetrations, and electrical interconnection verified
See the full Hudson inspection guide — scheduling & re-inspection fees →
Tips
- Hudson prices residential solar PV as a flat $500 fee, separate from both the general valuation-based Building Permit Fee and the square-footage-based residential electrical fee tiers.
- Watch for the Town's pending 2024 code cycle, which is expected to formally incorporate the Colorado Model Electric and Solar Ready Code, 2023 Edition (the state's HB22-1362 implementing code) — this may add EV-charging-readiness requirements to future solar/electrical-adjacent permits once finalized.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hudson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Hudson's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Hudson yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Hudson lands. Privacy.
Other permits in Hudson
Solar (Rooftop PV) Permit in other cities
Compare solar (rooftop pv) permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Hudson project checklist
Describe your project once and get every permit, document, and fee it triggers in Hudson — in one checklist. Free, for any city and any number of projects.
Get started →