Skip to main content
PermitBase

Commercial Tenant Improvement Permit in Hudson, Colorado

Required for commercial tenant improvement projects in Hudson, including remodels and kitchen work. The Town requires a 'Fire Department Fact Sheet' submission for kitchen and new-construction commercial projects, reflecting Hudson Fire Protection District review alongside Building Department review.

Verified 2026-07-23 · Source

When you need this permit

  • Reviewed under the 2018 IBC as locally amended (commercial scope)
  • Fire Department Fact Sheet required for kitchen and new-construction commercial projects, per the Town's Permits and Licenses page
  • Submitted online via the CommunityCore portal per the Town's Commercial application category
  • Special inspections may apply per adopted IBC Chapter 17 provisions for structural elements, at the Building Official's discretion

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, same schedule as general building permit)No separate commercial-specific fee table was found; commercial work is billed under the general Sec. 18-19(a) valuation schedule. Re-chased 2026-07-23 against the Town's current 2026 Fee Schedule (effective 1/1/2026, DocumentCenter View/6464, the actual town-council-resolution-adopted fee document) and the Town's commercial submittal-requirements guides (Commercial Tenant Finish, DocumentCenter View/4152; New Commercial Building Submissions, DocumentCenter View/6500): neither publishes a commercial-specific dollar fee schedule — both are submittal-content checklists, not fee documents. The Town's live Permits & Licenses page lists every commercial application category (Commercial Kitchens, New Commercial, Commercial Remodel, Tenant Improvement — each tied to a required Fire Department Fact Sheet) with the Fee column explicitly marked 'Variable,' directly confirming commercial work is billed under the general valuation-based Building Permit Fee rather than an unpublished separate commercial rate.
$35.00 minimum, scaling per the valuation tiers in the Building Permit Fees schedule
Plan Review Fee
60% of Permit Fee
Use Tax
4% of project valuation

Review timeline

Plan reviewHudson’s published plan-review target
7–14 business days

How long did your Commercial Tenant Improvement Permit permit actually take in Hudson?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Frame / Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  2. 2

    Fire/Life Safety

    Fire Department review of kitchen/life-safety systems where a Fire Department Fact Sheet was required

  3. 3

    Final Inspection

    All work complete per approved plans, Certificate of Occupancy issued if applicable

See the full Hudson inspection guide — scheduling & re-inspection fees →

Tips

  • Commercial kitchen and new-construction projects require a Fire Department Fact Sheet submitted alongside the Building Department application — coordinate with the Hudson Fire Protection District early to avoid a review-cycle delay.
  • No standalone commercial fee schedule exists — commercial tenant improvement fees follow the same valuation-based Building Permit Fee table used for residential work. Confirmed 2026-07-23 against the current 2026 Fee Schedule and the Permits & Licenses page, which marks every commercial category's fee as 'Variable.'
  • Commercial tenant-finish submittals must be designed and stamped by a Colorado registered architect (structural/MEP changes additionally require an engineer's stamp), per the Town's Commercial Tenant Finish submittal guide.

Frequently asked questions

Hudson requires a commercial tenant improvement permit for: Reviewed under the 2018 IBC as locally amended (commercial scope); Fire Department Fact Sheet required for kitchen and new-construction commercial projects, per the Town's Permits and Licenses page; Submitted online via the CommunityCore portal per the Town's Commercial application category; Special inspections may apply per adopted IBC Chapter 17 provisions for structural elements, at the Building Official's discretion. If your project isn't listed, confirm with Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) at 970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line) before starting work.

In Hudson, the published Building Permit Fee (valuation-based, same schedule as general building permit) is: $35.00 minimum, scaling per the valuation tiers in the Building Permit Fees schedule. Additional published fees: Plan Review Fee — 60% of Permit Fee; Use Tax — 4% of project valuation. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Hudson's published plan-review target for a commercial tenant improvement permit is 7–14 business days.

A Fire Department Fact Sheet is required for kitchen and new-construction commercial projects, submitted alongside the standard Commercial Building Permit Application via the CommunityCore portal.

Hudson requires 3 inspection(s) for a commercial tenant improvement permit, in order: Rough Frame / Electrical / Plumbing / Mechanical, Fire/Life Safety, Final Inspection. Schedule each through Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) (970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line)).

Apply through Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) at 50 Beech Street (also published as 50 S. Beech Street / P.O. Box 351), Hudson, CO 80642-0351. Phone: 970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line), email: jgesick@procodeinc.net (Jonathan Gesick, Chief Building Official). Office hours: Not separately published for the Building Department on the Town's Building Permits & Inspections page; Town Hall main line 303-536-9311, fax 303-536-4753. Inspection requests: online at www.procodeinc.net/inspections-request or by phone 970-305-3161 ext. 1.. Official information: https://hudsonco.gov/166/Building-Permits-Inspections.

Hudson, Colorado has adopted: 2018 International Building Code (IBC), as codified and amended per Hudson Municipal Code Chapter 18, Article I, Sec. 18-2 (Ord. No. 19-13, 7-3-19) — currently in force per the live Municode-codified chapter; 2018 International Residential Code (IRC), Sec. 18-6 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Mechanical Code (IMC), Sec. 18-10 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Fuel Gas Code (IFGC), Sec. 18-20 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Plumbing Code (IPC), Sec. 18-24 (Ord. No. 19-13, 7-3-19) — currently in force; 2012 International Energy Conservation Code (IECC), Sec. 18-28 (Ord. No. 19-13, 7-3-19) — currently in force per the live-codified chapter, though the Town's own DRAFT 2024 amendments propose replacing this with the 2024 IECC (status: not yet adopted as of this review); 2018 International Property Maintenance Code (IPMC), Sec. 18-32 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Existing Building Code (IEBC), Sec. 18-36 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Swimming Pool and Spa Code (ISPSC), Sec. 18-40 (Ord. No. 19-13, 7-3-19) — currently in force; National Electrical Code: no locally adopted NEC edition found in Chapter 18; IPMC Section 604.2 as amended defers to 'the Electrical Code adopted by the State of Colorado' rather than naming a specific NEC edition — electrical work in Hudson is administered under the Colorado State Electrical Board framework (see localAmendments); IMPORTANT STATUS NOTE — code edition transition in progress but NOT yet finalized: the Town's live Building Permits & Inspections page (hudsonco.gov/166/Building-Permits-Inspections) states the Town 'will adopt the 2024 ICC codes beginning June 2026, including Solar and EV-ready provisions,' and the Town has posted a document titled 'DRAFT 2024 Building Code Amendments' (DocumentCenter View/6523) proposing 2024 editions of IBC/IRC/IMC/IFGC/IPC/IECC(2024)/IPMC/IEBC/ISPSC plus a new Colorado Model Electric and Solar Ready Code, 2023 Edition (Title 31, Article 16, Part 2, C.R.S.) as Sec. 18-43. However, that document is watermarked 'DRAFT' throughout (dated 4/02/2026) and the live, currently-codified Municode text of Chapter 18 (confirmed via search-engine cache of library.municode.com/co/hudson, page directly 403'd to automated fetch) still shows the 2018/2012 editions listed above as being in force via Ord. No. 19-13. Per this project's zero-tolerance policy, the 2024 suite is NOT recorded as adopted until a signed ordinance/Municode update is confirmed; codesAdopted above reflects the current in-force 2018/2012 baseline, with this note flagging the pending transition for the next verification pass.; Separately, the Hudson Fire Protection District (HFPD) — an independent special district, not a Town department — has its own fire-code adoption process. The Town's live Building page states 'The Hudson Fire Protection District Board has adopted the 2024 IFC amendments, with draft documents available for review,' and a scanned board resolution (DocumentCenter View/6549, '2024-IFC-Adoption-Board-Resolution', a Konica Minolta scan dated April 2026) is posted. The underlying scanned PDF could not be OCR'd/text-extracted directly during this research pass (image-only scan, no embedded text layer) and the HFPD's own website (hfpdco.org) does not independently confirm a specific in-force IFC edition on the pages checked. Treated as partial confidence: an HFPD board resolution exists and the Town references it as adopted, but the specific currently-effective IFC edition enforced Town-wide could not be independently corroborated beyond the Town's own page summary.. Local amendments apply — see the Hudson overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hudson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Hudson.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.