Required for installation, alteration, or repair of electrical systems in Hudson. Fees follow the Colorado State Electrical Board's fee schedule (assessed and updated each July by the State), reflecting Colorado's default framework for jurisdictions without their own certified local electrical inspection program. Electrical contractors must hold a current Colorado state license, verified by the Town at permit acceptance.

Verified 2026-07-06 · Source

When you need this permit

  • Contractors must hold a current Colorado state electrical contractor license; license verification completed as part of permit acceptance per the Town's Building FAQs, consistent with CRS 12-23-106 / HB19-1086 contemporaneous-review requirements Contractor
  • Fee assessed under the State Electrical Board's schedule (updated each July), based on residential enclosed living area square footage, or a valuation-based schedule for non-residential/other installations
  • Homeowners performing work on their own owner-occupied property are not required to hold a contractor's license, but any subcontracted electrical work requires a licensed Colorado electrician Owner-builderContractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Residential Electrical Fee — up to 1,000 SFTown of Hudson 2026 Fee Schedule, effective January 1, 2026, Building Permit Fees-Electrical table — Electrical-Residential, 1,000 SF or less. Supersedes the $200 in the 3/27/2025 handout.
$146
Residential Electrical Fee — 1,001-1,500 SFTown of Hudson 2026 Fee Schedule, effective January 1, 2026, Building Permit Fees-Electrical table — Electrical-Residential, 1001-1500 SF. Supersedes the $250 in the 3/27/2025 handout.
$218
Residential Electrical Fee — 1,501-2,000 SFTown of Hudson 2026 Fee Schedule, effective January 1, 2026, Building Permit Fees-Electrical table — Electrical-Residential, 1,501-2,000 SF. Supersedes the $300 in the 3/27/2025 handout.
$292
Residential Electrical Fee — over 2,001 SFTown of Hudson 2026 Fee Schedule, effective January 1, 2026, Building Permit Fees-Electrical table — Electrical-Residential, over 2001 SF. Supersedes the $300 base in the 3/27/2025 handout.
$292 plus $10 for each additional 100 SF
Electrical Fee — Mobile/Manufactured/Modular HomeTown of Hudson 2026 Fee Schedule, effective January 1, 2026, Building Permit Fees-Electrical table — Electrical-Mobile/Manufactured/Modular Home. Supersedes the $150 per unit in the 3/27/2025 handout.
$146 per unit
Electrical Fee — Nonresidential, valuation up to $2,000Town of Hudson 2026 Fee Schedule, effective January 1, 2026, Building Permit Fees-Electrical table — Electrical-Nonresidential, valuation of $2,000 or less. Supersedes the $100 in the 3/27/2025 handout.
$146
Electrical Fee — Nonresidential, valuation over $2,001Town of Hudson 2026 Fee Schedule, effective January 1, 2026, Building Permit Fees-Electrical table — Electrical-Nonresidential, valuation over $2000. Supersedes the $200 plus $10 per $2,000 in the 3/27/2025 handout; both the base and the increment changed.
$146 plus $15 for each additional $1,000 of valuation, rounded up to the next $1,000
Electrical Re-Inspection FeeTown of Hudson 2026 Fee Schedule, effective January 1, 2026, Building Permit Fees-Electrical table — Electrical Re-Inspection Fee. Supersedes the $150 in the 3/27/2025 handout.
$74

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Hudson?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized and verified

See the full Hudson inspection guide — scheduling & re-inspection fees →

Tips

  • Hudson's electrical fees track the Colorado State Electrical Board's schedule, which is updated every July — confirm the current-year rate with the Building Department if your project spans a July fee update.
  • Only licensed Colorado electrical contractors may perform subcontracted electrical work; the Town verifies license status at permit acceptance.

Frequently asked questions

Hudson requires an electrical permit for: Contractors must hold a current Colorado state electrical contractor license; license verification completed as part of permit acceptance per the Town's Building FAQs, consistent with CRS 12-23-106 / HB19-1086 contemporaneous-review requirements; Fee assessed under the State Electrical Board's schedule (updated each July), based on residential enclosed living area square footage, or a valuation-based schedule for non-residential/other installations; Homeowners performing work on their own owner-occupied property are not required to hold a contractor's license, but any subcontracted electrical work requires a licensed Colorado electrician. If your project isn't listed, confirm with Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) at 970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line) before starting work.

In Hudson, the published Residential Electrical Fee — up to 1,000 SF is: $146. Additional published fees: Residential Electrical Fee — 1,001-1,500 SF — $218; Residential Electrical Fee — 1,501-2,000 SF — $292; Residential Electrical Fee — over 2,001 SF — $292 plus $10 for each additional 100 SF; Electrical Fee — Mobile/Manufactured/Modular Home — $146 per unit; Electrical Fee — Nonresidential, valuation up to $2,000 — $146; Electrical Fee — Nonresidential, valuation over $2,001 — $146 plus $15 for each additional $1,000 of valuation, rounded up to the next $1,000; Electrical Re-Inspection Fee — $74. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Hudson does not publish a plan-review timeline for this permit. Contact Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) at 970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line) for current turnaround.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Hudson requires 2 inspection(s) for an electrical permit, in order: Rough Electrical, Final Inspection. Schedule each through Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) (970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line)).

Apply through Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) at 50 Beech Street (also published as 50 S. Beech Street / P.O. Box 351), Hudson, CO 80642-0351. Phone: 970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line), email: jgesick@procodeinc.net (Jonathan Gesick, Chief Building Official). Office hours: Not separately published for the Building Department on the Town's Building Permits & Inspections page; Town Hall main line 303-536-9311, fax 303-536-4753. Inspection requests: online at www.procodeinc.net/inspections-request or by phone 970-305-3161 ext. 1.. Official information: https://hudsonco.gov/166/Building-Permits-Inspections.

Hudson, Colorado has adopted: 2018 International Building Code (IBC), as codified and amended per Hudson Municipal Code Chapter 18, Article I, Sec. 18-2 (Ord. No. 19-13, 7-3-19) — currently in force per the live Municode-codified chapter; 2018 International Residential Code (IRC), Sec. 18-6 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Mechanical Code (IMC), Sec. 18-10 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Fuel Gas Code (IFGC), Sec. 18-20 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Plumbing Code (IPC), Sec. 18-24 (Ord. No. 19-13, 7-3-19) — currently in force; 2012 International Energy Conservation Code (IECC), Sec. 18-28 (Ord. No. 19-13, 7-3-19) — currently in force per the live-codified chapter, though the Town's own DRAFT 2024 amendments propose replacing this with the 2024 IECC (status: not yet adopted as of the last verification); 2018 International Property Maintenance Code (IPMC), Sec. 18-32 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Existing Building Code (IEBC), Sec. 18-36 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Swimming Pool and Spa Code (ISPSC), Sec. 18-40 (Ord. No. 19-13, 7-3-19) — currently in force; National Electrical Code: no locally adopted NEC edition found in Chapter 18; IPMC Section 604.2 as amended defers to 'the Electrical Code adopted by the State of Colorado' rather than naming a specific NEC edition — electrical work in Hudson is administered under the Colorado State Electrical Board framework (see localAmendments); IMPORTANT STATUS NOTE — code edition transition in progress but NOT yet finalized: the Town's live Building Permits & Inspections page (hudsonco.gov/166/Building-Permits-Inspections) states the Town 'will adopt the 2024 ICC codes beginning June 2026, including Solar and EV-ready provisions,' and the Town has posted a document titled 'DRAFT 2024 Building Code Amendments' (DocumentCenter View/6523) proposing 2024 editions of IBC/IRC/IMC/IFGC/IPC/IECC(2024)/IPMC/IEBC/ISPSC plus a new Colorado Model Electric and Solar Ready Code, 2023 Edition (Title 31, Article 16, Part 2, C.R.S.) as Sec. 18-43. However, that document is watermarked 'DRAFT' throughout (dated 4/02/2026), and the currently-codified Municode text of Chapter 18 (library.municode.com/co/hudson) still shows the 2018/2012 editions listed above as being in force via Ord. No. 19-13. The 2024 suite is NOT recorded as adopted until a signed ordinance/Municode update confirms it; codesAdopted above reflects the current in-force 2018/2012 baseline, with this note flagging the pending transition.; Separately, the Hudson Fire Protection District (HFPD) — an independent special district, not a Town department — runs its own fire-code adoption process. The Town's Building page states 'The Hudson Fire Protection District Board has adopted the 2024 IFC amendments, with draft documents available for review,' and a scanned board resolution (DocumentCenter View/6549, '2024-IFC-Adoption-Board-Resolution', a Konica Minolta scan dated April 2026) is posted. That PDF is an image-only scan with no text layer, so read it on screen rather than searching it, and HFPD's own website (hfpdco.org) does not itself state a currently in-force IFC edition. An HFPD board resolution exists and the Town describes the 2024 amendments as adopted, but the Town's page summary is the only statement of that — confirm the effective edition with HFPD before designing to it.. Local amendments apply — see the Hudson overview page for the full list.

No. Hudson's Building Permit Fees handout is explicit that electrical fees follow the State Electrical Board's fee schedule, assessed each July by the State, rather than a locally-set fee table — consistent with Colorado's default framework for jurisdictions without their own certified electrical inspection program.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hudson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Hudson's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Hudson yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Hudson lands. Privacy.