Electric Vehicle (EV) Charger / EVSE Permit — Hudson, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://hudsonco.gov/166/Building-Permits-Inspections
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charger / EVSE Permit in Hudson, Colorado
Hudson has no dedicated EV charger / EVSE fee line or permit category distinct from its general Electrical Permit process. EV charger installation (Level 2 or DC fast charging equipment) is electrical work reviewed and fee'd under the Town's standard Electrical Permit, which follows the Colorado State Electrical Board's fee schedule. Hudson's population (approximately 2,700) is well below the 10,000-population municipal threshold that triggers Colorado HB24-1173's requirement for a standardized/expedited EV charging system permitting program (adoption deadline December 31, 2025, for covered municipalities of 10,000+ and counties of 20,000+), so the Town is not required to adopt a distinct EV charging permit track and none was found. Separately, the Town's live Building Permits & Inspections page states the pending 2024 ICC code adoption (targeted mid-2026) will include 'Solar and EV-ready provisions' via the Colorado Model Electric and Solar Ready Code, 2023 Edition — this concerns EV-ready wiring/conduit requirements for new construction, not a distinct EV charger permit fee or process, and remains in draft/proposal status as of this review.
Verified 2026-07-20 · Source
When you need this permit
- Treated as standard electrical work: application submitted via the Town's CommunityCore online portal
- Electrical contractor must hold a current Colorado state electrical contractor license, verified by the Town at permit acceptance (homeowners may self-perform on their own owner-occupied property, but subcontracted electrical work requires a licensed Colorado electrician) Owner-builderContractor
- Panel/circuit sizing and load calculation documentation may be requested if the charger installation requires a service upgrade or exceeds standard branch-circuit capacity
- No population-triggered HB24-1173 standardized EV permitting program applies to Hudson (population under the 10,000-resident municipal threshold)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Circuit/conduit and disconnect placement before concealment, if applicable
- 2
Final Inspection
Charger mounted, circuit labeled, GFCI/breaker protection and disconnect verified per NEC Article 625 (EV charging equipment)
See the full Hudson inspection guide — scheduling & re-inspection fees →
Tips
- Hudson does not price EV chargers separately from general electrical work — expect to pay the same residential square-footage-based or nonresidential valuation-based Electrical Permit Fee used for any other electrical permit, not a flat EV-specific fee.
- Because Hudson's population is under Colorado's HB24-1173 threshold (10,000+ for municipalities), the Town is not legally required to publish a streamlined/expedited EV charging permit process — confirm current turnaround directly with Chief Building Official Jonathan Gesick (970-305-3161) before assuming an expedited timeline applies.
- Watch for the Town's pending 2024 code cycle (Colorado Model Electric and Solar Ready Code, 2023 Edition), which may eventually formalize EV-ready wiring requirements for new construction, though this would affect new-build requirements rather than the permit fee for installing a charger today.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hudson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Hudson
Electric Vehicle (EV) Charger / EVSE Permit in other cities
Compare electric vehicle (ev) charger / evse permit fees across Colorado →
Look up this fee in a different city →