Mechanical / HVAC Permit — Hudson, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://hudsonco.gov/166/Building-Permits-Inspections
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Mechanical / HVAC Permit in Hudson, Colorado
Required for heating, cooling, and ventilation equipment installation in Hudson, billed under the general Building Permit Fee schedule except for furnace/AC replacements, which qualify for the Town's over-the-counter 'One Stop Permit' at a flat fee. Governed by the 2018 International Mechanical Code (IMC) and 2018 International Fuel Gas Code (IFGC) as locally amended.
Verified 2026-07-06 · Source
When you need this permit
- Governed by the 2018 IMC (Sec. 18-10 through 18-13) and 2018 IFGC (Sec. 18-20 through 18-23) as amended by Hudson Municipal Code Chapter 18
- Furnace/AC/Water Heater/Boiler installations and replacements require a permit per the Town's 'When is a Permit Needed?' guide, reviewed by Building
- Furnace/AC Replacement qualifies for the Town's over-the-counter One Stop Permit track (issued within 2 days)
- Fuel gas piping: minimum 18-inch burial depth for plastic piping; test pressure 10 psig, test duration 15 minutes (IFGC Sec. 404.12/406.4.1/406.4.2 as amended)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment (for new-install scopes)
- 2
Final Inspection
Equipment operational, combustion air and venting verified
See the full Hudson inspection guide — scheduling & re-inspection fees →
Tips
- A straightforward furnace, AC, or water heater replacement qualifies for Hudson's One Stop (over-the-counter) permit track at a flat $125 fee, issued within 2 days — don't over-apply the longer Standard Building Permit process to a simple like-for-like replacement.
- New mechanical work bundled into a larger addition or new-construction project instead falls under the general valuation-based Building Permit Fee and 1-2 week review window.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hudson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Hudson
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Hudson project checklist
Describe your project once and get every permit, document, and fee it triggers in Hudson — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.