Plumbing Permit in Hudson, Colorado

Required for installation, alteration, or repair of plumbing systems in Hudson, billed under the Town's general valuation-based Building Permit Fee (no standalone locally-published plumbing fee schedule was found, unlike electrical which follows the state schedule). Governed by the 2018 International Plumbing Code (IPC) as locally amended. Plumbing contractors must hold a current Colorado state license, verified at permit acceptance.

Verified 2026-07-23 · Source

When you need this permit

  • Governed by the 2018 IPC as adopted and amended by Hudson Municipal Code Chapter 18, Sec. 18-24 through 18-27
  • Contractors must hold a current Colorado state plumbing contractor license, verified by the Town at permit acceptance per the Building FAQs Contractor
  • Sewer depth per IPC Sec. 305.4.1 as amended: 12 inches minimum
  • Roof extension per IPC Sec. 903.1.1 as amended: 12-inch minimum insertion dimension

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, same schedule as general building permit — no standalone plumbing fee line published)No separate plumbing-specific fee table was found on the Town's current Building Permit Fees handout; plumbing work is billed under the general Sec. 18-19(a) valuation schedule. Re-chased 2026-07-23 against the Town's current 2026 Fee Schedule (effective 1/1/2026, DocumentCenter View/6464 — the actual town-council-resolution-adopted fee document; Municipal Code Sec. 18-19(a)/(b), confirmed directly on Municode, delegates fee-setting to 'resolution of the town council' rather than codifying dollar figures in ordinance text): no standalone plumbing fee line exists there either. The Town's live Permits & Licenses page also lists plumbing-adjacent 'One-Stop (Sewer/Water Repairs, Water Heaters, Re-roofs)' work with fee marked 'Variable' rather than a flat plumbing rate, directly confirming plumbing work is billed under the general valuation-based Building Permit Fee, not an unpublished separate schedule.
$35.00 minimum, scaling per the valuation tiers in the Building Permit Fees schedule
One Stop Permit — Sanitary Sewer/Water RepairNEW 2026-07-23 finding: the Town's live Building Permits & Inspections page now explicitly lists 'Sanitary sewer and water repairs' among its named Over-the-Counter Permits, and the Permits & Licenses page groups it under 'One-Stop (Sewer/Water Repairs, Water Heaters, Re-roofs).' This confirms 2-day OTC issuance specifically for plumbing repair scope (sewer/water line repairs), distinct from new plumbing installs/alterations which remain on the standard track.
Variable (billed under the general valuation-based Building Permit Fee; no flat dollar figure published for this category, unlike Hot Water Heater Replacement/Reroof)
Plan Review Fee
60% of Building Permit Fee
Use Tax
4% of project valuation

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in Hudson?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment; DWV systems tested by water or air with no evidence of leakage per IPC Sec. 2503.5.1 as amended

  2. 2

    Final Inspection

    Fixtures connected, no leaks, proper venting verified

See the full Hudson inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike electrical permits, Hudson does not publish a standalone plumbing fee schedule — plumbing work is billed under the same general valuation-based Building Permit Fee used for building/mechanical work, confirmed against both the 2024 handout and the current 2026 Fee Schedule.
  • Confirm your plumbing contractor's Colorado state license is current; the Town verifies licensing status at permit acceptance, consistent with statewide contemporaneous-review requirements.
  • Sanitary sewer and water line repairs are treated as an Over-the-Counter/One-Stop item (2-day issuance) per the Town's live Building Permits page, distinct from new plumbing installs/alterations bundled into a larger construction permit, which follow the standard 1-2 week review track.

Frequently asked questions

Hudson requires a plumbing permit for: Governed by the 2018 IPC as adopted and amended by Hudson Municipal Code Chapter 18, Sec. 18-24 through 18-27; Contractors must hold a current Colorado state plumbing contractor license, verified by the Town at permit acceptance per the Building FAQs; Sewer depth per IPC Sec. 305.4.1 as amended: 12 inches minimum; Roof extension per IPC Sec. 903.1.1 as amended: 12-inch minimum insertion dimension. If your project isn't listed, confirm with Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) at 970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line) before starting work.

No standalone plumbing fee schedule was found on the Town's current Building Permit Fees handout. Plumbing work is billed under the general valuation-based Building Permit Fee, unlike electrical work, which follows the Colorado State Electrical Board's separate fee schedule.

Hudson does not publish a plan-review timeline for this permit. Contact Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) at 970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line) for current turnaround.

You'll need: Building/Plumbing Permit Application. See the required-documents checklist on this page for details on each.

Hudson requires 2 inspection(s) for a plumbing permit, in order: Rough Plumbing, Final Inspection. Schedule each through Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) (970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line)).

Apply through Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) at 50 Beech Street (also published as 50 S. Beech Street / P.O. Box 351), Hudson, CO 80642-0351. Phone: 970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line), email: jgesick@procodeinc.net (Jonathan Gesick, Chief Building Official). Office hours: Not separately published for the Building Department on the Town's Building Permits & Inspections page; Town Hall main line 303-536-9311, fax 303-536-4753. Inspection requests: online at www.procodeinc.net/inspections-request or by phone 970-305-3161 ext. 1.. Official information: https://hudsonco.gov/166/Building-Permits-Inspections.

Hudson, Colorado has adopted: 2018 International Building Code (IBC), as codified and amended per Hudson Municipal Code Chapter 18, Article I, Sec. 18-2 (Ord. No. 19-13, 7-3-19) — currently in force per the live Municode-codified chapter; 2018 International Residential Code (IRC), Sec. 18-6 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Mechanical Code (IMC), Sec. 18-10 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Fuel Gas Code (IFGC), Sec. 18-20 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Plumbing Code (IPC), Sec. 18-24 (Ord. No. 19-13, 7-3-19) — currently in force; 2012 International Energy Conservation Code (IECC), Sec. 18-28 (Ord. No. 19-13, 7-3-19) — currently in force per the live-codified chapter, though the Town's own DRAFT 2024 amendments propose replacing this with the 2024 IECC (status: not yet adopted as of this review); 2018 International Property Maintenance Code (IPMC), Sec. 18-32 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Existing Building Code (IEBC), Sec. 18-36 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Swimming Pool and Spa Code (ISPSC), Sec. 18-40 (Ord. No. 19-13, 7-3-19) — currently in force; National Electrical Code: no locally adopted NEC edition found in Chapter 18; IPMC Section 604.2 as amended defers to 'the Electrical Code adopted by the State of Colorado' rather than naming a specific NEC edition — electrical work in Hudson is administered under the Colorado State Electrical Board framework (see localAmendments); IMPORTANT STATUS NOTE — code edition transition in progress but NOT yet finalized: the Town's live Building Permits & Inspections page (hudsonco.gov/166/Building-Permits-Inspections) states the Town 'will adopt the 2024 ICC codes beginning June 2026, including Solar and EV-ready provisions,' and the Town has posted a document titled 'DRAFT 2024 Building Code Amendments' (DocumentCenter View/6523) proposing 2024 editions of IBC/IRC/IMC/IFGC/IPC/IECC(2024)/IPMC/IEBC/ISPSC plus a new Colorado Model Electric and Solar Ready Code, 2023 Edition (Title 31, Article 16, Part 2, C.R.S.) as Sec. 18-43. However, that document is watermarked 'DRAFT' throughout (dated 4/02/2026) and the live, currently-codified Municode text of Chapter 18 (confirmed via search-engine cache of library.municode.com/co/hudson, page directly 403'd to automated fetch) still shows the 2018/2012 editions listed above as being in force via Ord. No. 19-13. Per this project's zero-tolerance policy, the 2024 suite is NOT recorded as adopted until a signed ordinance/Municode update is confirmed; codesAdopted above reflects the current in-force 2018/2012 baseline, with this note flagging the pending transition for the next verification pass.; Separately, the Hudson Fire Protection District (HFPD) — an independent special district, not a Town department — has its own fire-code adoption process. The Town's live Building page states 'The Hudson Fire Protection District Board has adopted the 2024 IFC amendments, with draft documents available for review,' and a scanned board resolution (DocumentCenter View/6549, '2024-IFC-Adoption-Board-Resolution', a Konica Minolta scan dated April 2026) is posted. The underlying scanned PDF could not be OCR'd/text-extracted directly during this research pass (image-only scan, no embedded text layer) and the HFPD's own website (hfpdco.org) does not independently confirm a specific in-force IFC edition on the pages checked. Treated as partial confidence: an HFPD board resolution exists and the Town references it as adopted, but the specific currently-effective IFC edition enforced Town-wide could not be independently corroborated beyond the Town's own page summary.. Local amendments apply — see the Hudson overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hudson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.