Residential Building Permit (New Construction) — Hudson, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://hudsonco.gov/166/Building-Permits-Inspections
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction) in Hudson, Colorado
Required for new single-family homes and manufactured/modular home placements in the Town of Hudson. Reviewed under the 2018 IRC as locally amended (Hudson Municipal Code Chapter 18, Article I), including the Town's Climatic and Geographic Design Criteria (30 psf ground snow load, 115 mph wind design speed, 30-inch frost line/3-foot frost depth). Plan review and inspections are performed by the Town's contracted building department, ProCode Inc.
Verified 2026-07-06 · Source
When you need this permit
- Plans reviewed under the 2018 IRC as locally amended; must meet the Town's Climatic and Geographic Design Criteria: 30 psf ground snow load, 115 mph wind design speed (Seismic Design Category B, Seismic Zone 1), 30-inch minimum frost line depth (3 feet per Sec. 18-1), ice barrier underlayment required
- Foundation design and construction drawings must be stamped by a Colorado registered design professional, based on an engineer's soils report (IRC Sec. R401.2 as amended)
- Site certification by a Colorado registered design professional required for setback verification on new Group R-3 occupancies
- Site plan showing new construction, lot-line distances, and drainage per the master drainage plan required at submittal (IRC Sec. R106.2 as amended)
- Final drainage certificate by a Colorado-licensed professional land surveyor required before certificate of occupancy issuance
- Automatic residential fire sprinkler system required if habitable space above grade exceeds 3,600 sq ft (NFPA 13D)
- Asphalt shingle roofing must be Class 4 impact-resistant (UL2218) subject to limited exceptions
- Application submitted via the Town's CommunityCore online portal; electrical and plumbing subcontractors must hold current Colorado state licenses, verified at permit acceptance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation
Before concrete pour, per 30-inch minimum frost line depth
- 2
Framing
Structural framing complete before cover
- 3
Insulation
Following installation of wall, ceiling, and floor insulation and exterior windows, before wall coverings are installed (IRC Sec. R110.3.9.1 as amended)
- 4
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 5
Final Inspection
All work complete per approved plans and applicable codes; final drainage certificate submitted before certificate of occupancy
See the full Hudson inspection guide — scheduling & re-inspection fees →
Tips
- Hudson's frost line is codified at 3 feet in Sec. 18-1, while the IRC design-criteria table separately lists a 30-inch frost depth figure — confirm which figure your foundation engineer is designing to and reconcile with the Chief Building Official before finalizing plans.
- A final drainage certificate from a Colorado-licensed professional land surveyor is required before the Town will issue a certificate of occupancy — budget time for this survey near project completion, not just at initial site-plan submittal.
- The Town's code adoption is mid-transition: 2018 IRC is currently in force, but a 2024 IRC edition is drafted and targeted around mid-2026 — confirm the currently governing edition directly with the Building Department (970-305-3161) before finalizing a code analysis.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hudson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Hudson
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Colorado →
Look up this fee in a different city →
Now live
Build your Hudson project checklist
Describe your project once and get every permit, document, and fee it triggers in Hudson — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →