Required for new single-family homes and manufactured/modular home placements in the Town of Hudson. Reviewed under the 2018 IRC as locally amended (Hudson Municipal Code Chapter 18, Article I), including the Town's Climatic and Geographic Design Criteria (30 psf ground snow load, 115 mph wind design speed, 30-inch frost line/3-foot frost depth). Plan review and inspections are performed by the Town's contracted building department, ProCode Inc.

Verified 2026-07-06 · Source

When you need this permit

  • Plans reviewed under the 2018 IRC as locally amended; must meet the Town's Climatic and Geographic Design Criteria: 30 psf ground snow load, 115 mph wind design speed (Seismic Design Category B, Seismic Zone 1), 30-inch minimum frost line depth (3 feet per Sec. 18-1), ice barrier underlayment required
  • Foundation design and construction drawings must be stamped by a Colorado registered design professional, based on an engineer's soils report (IRC Sec. R401.2 as amended)
  • Site certification by a Colorado registered design professional required for setback verification on new Group R-3 occupancies
  • Site plan showing new construction, lot-line distances, and drainage per the master drainage plan required at submittal (IRC Sec. R106.2 as amended)
  • Final drainage certificate by a Colorado-licensed professional land surveyor required before certificate of occupancy issuance
  • Automatic residential fire sprinkler system required if habitable space above grade exceeds 3,600 sq ft (NFPA 13D)
  • Asphalt shingle roofing must be Class 4 impact-resistant (UL2218) subject to limited exceptions
  • Application submitted via the Town's CommunityCore online portal; electrical and plumbing subcontractors must hold current Colorado state licenses, verified at permit acceptance

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 5 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation $0.00 to $1,000.00Building Permit Fees, Town of Hudson (updated 3/27/2025), Sec. 18-19(a)
$35.00
Building Permit Fee — valuation $1,001.00 to $1,500.00
$55.00
Building Permit Fee — valuation $1,501.00 to $2,000.00
$65.00
Building Permit Fee — valuation $2,001.00 to $10,000.00
$67.50 for the first $2,000.00 of permit valuation, plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $10,000.00
Building Permit Fee — valuation $10,001.00 to $30,000.00
$177.00 for the first $10,000.00 of permit valuation, plus $12.00 for each additional $1,000.00 or fraction thereof, to and including $30,000.00
Building Permit Fee — valuation $30,001.00 to $100,000.00
$417.00 for the first $30,000.00 of permit valuation, plus $9.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
Building Permit Fee — valuation $100,001.00 to $500,000.00
$1,047.00 for the first $100,000.00 of permit valuation, plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $500,000.00
Building Permit Fee — valuation over $500,000.00
$3,847.00 for the first $500,000.00 of permit valuation, plus $6.00 for each additional $1,000.00 or fraction thereof above $500,001.00
Plan Review FeeSec. 18-19(b)
60% of Building Permit Fee
Admin/Processing FeeSec. 18-19(b)
$35 (over-the-counter) or $50 (all other permits)
Use Tax
4% of project valuation
Electrical Permit Fee (State Electrical Board schedule) — Residential up to 1,000 SFAssessed per the State Electrical Board fee schedule, updated each July
$200
Working without a required permitSec. 18-4(a)(8) IBC / Sec. 18-4(b)(5) IRC
Additional 100% of permit fee (i.e., double the standard fee)

Review timeline

Plan reviewHudson’s published plan-review target
7–14 business days

How long did your Residential Building Permit (New Construction) permit actually take in Hudson?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Before concrete pour, per 30-inch minimum frost line depth

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Insulation

    Following installation of wall, ceiling, and floor insulation and exterior windows, before wall coverings are installed (IRC Sec. R110.3.9.1 as amended)

  4. 4

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  5. 5

    Final Inspection

    All work complete per approved plans and applicable codes; final drainage certificate submitted before certificate of occupancy

See the full Hudson inspection guide — scheduling & re-inspection fees →

Tips

  • Hudson's frost line is codified at 3 feet in Sec. 18-1, while the IRC design-criteria table separately lists a 30-inch frost depth figure — confirm which figure your foundation engineer is designing to and reconcile with the Chief Building Official before finalizing plans.
  • A final drainage certificate from a Colorado-licensed professional land surveyor is required before the Town will issue a certificate of occupancy — budget time for this survey near project completion, not just at initial site-plan submittal.
  • The Town's code adoption is mid-transition: 2018 IRC is currently in force, but a 2024 IRC edition is drafted and targeted around mid-2026 — confirm the currently governing edition directly with the Building Department (970-305-3161) before finalizing a code analysis.

Frequently asked questions

Hudson requires a residential building permit (new construction) for: Plans reviewed under the 2018 IRC as locally amended; must meet the Town's Climatic and Geographic Design Criteria: 30 psf ground snow load, 115 mph wind design speed (Seismic Design Category B, Seismic Zone 1), 30-inch minimum frost line depth (3 feet per Sec. 18-1), ice barrier underlayment required; Foundation design and construction drawings must be stamped by a Colorado registered design professional, based on an engineer's soils report (IRC Sec. R401.2 as amended); Site certification by a Colorado registered design professional required for setback verification on new Group R-3 occupancies; Site plan showing new construction, lot-line distances, and drainage per the master drainage plan required at submittal (IRC Sec. R106.2 as amended); Final drainage certificate by a Colorado-licensed professional land surveyor required before certificate of occupancy issuance; Automatic residential fire sprinkler system required if habitable space above grade exceeds 3,600 sq ft (NFPA 13D); Asphalt shingle roofing must be Class 4 impact-resistant (UL2218) subject to limited exceptions; Application submitted via the Town's CommunityCore online portal; electrical and plumbing subcontractors must hold current Colorado state licenses, verified at permit acceptance. If your project isn't listed, confirm with Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) at 970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line) before starting work.

In Hudson, the published Building Permit Fee — valuation $0.00 to $1,000.00 is: $35.00. Additional published fees: Building Permit Fee — valuation $1,001.00 to $1,500.00 — $55.00; Building Permit Fee — valuation $1,501.00 to $2,000.00 — $65.00; Building Permit Fee — valuation $2,001.00 to $10,000.00 — $67.50 for the first $2,000.00 of permit valuation, plus $14.00 for each additional $1,000.00 or fraction thereof, to and including $10,000.00; Building Permit Fee — valuation $10,001.00 to $30,000.00 — $177.00 for the first $10,000.00 of permit valuation, plus $12.00 for each additional $1,000.00 or fraction thereof, to and including $30,000.00; Building Permit Fee — valuation $30,001.00 to $100,000.00 — $417.00 for the first $30,000.00 of permit valuation, plus $9.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00; Building Permit Fee — valuation $100,001.00 to $500,000.00 — $1,047.00 for the first $100,000.00 of permit valuation, plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $500,000.00; Building Permit Fee — valuation over $500,000.00 — $3,847.00 for the first $500,000.00 of permit valuation, plus $6.00 for each additional $1,000.00 or fraction thereof above $500,001.00; Plan Review Fee — 60% of Building Permit Fee; Admin/Processing Fee — $35 (over-the-counter) or $50 (all other permits); Use Tax — 4% of project valuation; Electrical Permit Fee (State Electrical Board schedule) — Residential up to 1,000 SF — $200; Working without a required permit — Additional 100% of permit fee (i.e., double the standard fee). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

The Town publishes an initial review window of 1-2 weeks, with an additional 1-2 weeks for each subsequent review cycle if corrections are required, per the Building Permits & Inspections page.

You'll need: Building Permit Application; Construction Plans / Drawings; Site Plan; Site Certification (setback verification); Final Drainage Certificate. See the required-documents checklist on this page for details on each.

Hudson requires 5 inspection(s) for a residential building permit (new construction), in order: Foundation, Framing, Insulation, Rough Electrical / Plumbing / Mechanical, Final Inspection. Schedule each through Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) (970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line)).

Apply through Town of Hudson Building Department (contracted: ProCode Inc. / SAFEbuilt) at 50 Beech Street (also published as 50 S. Beech Street / P.O. Box 351), Hudson, CO 80642-0351. Phone: 970-305-3161 (Building Department, ProCode Inc.); 303-536-9311 (Town Hall main line), email: jgesick@procodeinc.net (Jonathan Gesick, Chief Building Official). Office hours: Not separately published for the Building Department on the Town's Building Permits & Inspections page; Town Hall main line 303-536-9311, fax 303-536-4753. Inspection requests: online at www.procodeinc.net/inspections-request or by phone 970-305-3161 ext. 1.. Official information: https://hudsonco.gov/166/Building-Permits-Inspections.

Hudson, Colorado has adopted: 2018 International Building Code (IBC), as codified and amended per Hudson Municipal Code Chapter 18, Article I, Sec. 18-2 (Ord. No. 19-13, 7-3-19) — currently in force per the live Municode-codified chapter; 2018 International Residential Code (IRC), Sec. 18-6 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Mechanical Code (IMC), Sec. 18-10 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Fuel Gas Code (IFGC), Sec. 18-20 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Plumbing Code (IPC), Sec. 18-24 (Ord. No. 19-13, 7-3-19) — currently in force; 2012 International Energy Conservation Code (IECC), Sec. 18-28 (Ord. No. 19-13, 7-3-19) — currently in force per the live-codified chapter, though the Town's own DRAFT 2024 amendments propose replacing this with the 2024 IECC (status: not yet adopted as of this review); 2018 International Property Maintenance Code (IPMC), Sec. 18-32 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Existing Building Code (IEBC), Sec. 18-36 (Ord. No. 19-13, 7-3-19) — currently in force; 2018 International Swimming Pool and Spa Code (ISPSC), Sec. 18-40 (Ord. No. 19-13, 7-3-19) — currently in force; National Electrical Code: no locally adopted NEC edition found in Chapter 18; IPMC Section 604.2 as amended defers to 'the Electrical Code adopted by the State of Colorado' rather than naming a specific NEC edition — electrical work in Hudson is administered under the Colorado State Electrical Board framework (see localAmendments); IMPORTANT STATUS NOTE — code edition transition in progress but NOT yet finalized: the Town's live Building Permits & Inspections page (hudsonco.gov/166/Building-Permits-Inspections) states the Town 'will adopt the 2024 ICC codes beginning June 2026, including Solar and EV-ready provisions,' and the Town has posted a document titled 'DRAFT 2024 Building Code Amendments' (DocumentCenter View/6523) proposing 2024 editions of IBC/IRC/IMC/IFGC/IPC/IECC(2024)/IPMC/IEBC/ISPSC plus a new Colorado Model Electric and Solar Ready Code, 2023 Edition (Title 31, Article 16, Part 2, C.R.S.) as Sec. 18-43. However, that document is watermarked 'DRAFT' throughout (dated 4/02/2026) and the live, currently-codified Municode text of Chapter 18 (confirmed via search-engine cache of library.municode.com/co/hudson, page directly 403'd to automated fetch) still shows the 2018/2012 editions listed above as being in force via Ord. No. 19-13. Per this project's zero-tolerance policy, the 2024 suite is NOT recorded as adopted until a signed ordinance/Municode update is confirmed; codesAdopted above reflects the current in-force 2018/2012 baseline, with this note flagging the pending transition for the next verification pass.; Separately, the Hudson Fire Protection District (HFPD) — an independent special district, not a Town department — has its own fire-code adoption process. The Town's live Building page states 'The Hudson Fire Protection District Board has adopted the 2024 IFC amendments, with draft documents available for review,' and a scanned board resolution (DocumentCenter View/6549, '2024-IFC-Adoption-Board-Resolution', a Konica Minolta scan dated April 2026) is posted. The underlying scanned PDF could not be OCR'd/text-extracted directly during this research pass (image-only scan, no embedded text layer) and the HFPD's own website (hfpdco.org) does not independently confirm a specific in-force IFC edition on the pages checked. Treated as partial confidence: an HFPD board resolution exists and the Town references it as adopted, but the specific currently-effective IFC edition enforced Town-wide could not be independently corroborated beyond the Town's own page summary.. Local amendments apply — see the Hudson overview page for the full list.

The Town of Hudson's Building Department, with plan review and inspections contracted to ProCode Inc. (Jonathan Gesick, Chief Building Official, 970-305-3161), issues building permits under Hudson Municipal Code Chapter 18.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Hudson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.