Deck / Patio Cover / Carport Permit — Nunn, Colorado · Requirements sheet
Reviewed 2026-07-23 · Source: https://townofnunn.colorado.gov/departments/building/planning
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Deck / Patio Cover / Carport Permit in Nunn, Colorado
Required for decks, patio covers, carports, and pergolas in the Town of Nunn, per the Town's own project list. The Town publishes dedicated 2024 IRC homeowner guides for Decks and Patio Covers/Carports.
Reviewed 2026-07-23 · Source
When you need this permit
- Decks, patio covers, carports, and pergolas are explicitly listed on the Town's building-permit-needed project list
- Attached and detached garages/carports also require a permit
- One set of plans showing site plan, square footage, and construction details submitted to the Town Clerk's Office or by email
- Foundation/footing design subject to Nunn's Climatic and Geographic Design Criteria (30 psf ground snow load, 30-inch frost depth)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring… Show full citationHide
The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring plan review) $75.00' and 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00', plus 'Use Tax on all Building Permits 2%'. The schedule does not itself name 'deck/patio cover/carport' under either tier. This is the Town Clerk's own flat component only — charged in addition to SAFEbuilt's separate valuation-based fee, which is not published as a table.Review timeline
Inspection process
- 1
Footing/Foundation
Before concrete pour, per 30-inch minimum frost depth
- 2
Framing
Structural framing and ledger connection (if attached) before cover
- 3
Final Inspection
Guardrails, stairs, and overall compliance verified
See the full Nunn inspection guide — scheduling & re-inspection fees →
Tips
- Patio covers, carports, and pergolas ARE permit-required in Nunn per the Town's own list — don't assume a detached, unenclosed structure is exempt.
- Guardrail requirements for window/area wells near a deck or patio (36 inches from walking surface, 30 inches deep, per IRC R312.1 as locally amended) can apply if the deck is near a window well — check this local amendment specifically.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-23.
Fee schedules
Checklists & handouts
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nunn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Nunn's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Nunn yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Nunn lands. Privacy.
Other permits in Nunn
Deck / Patio Cover / Carport Permit in other cities
Compare deck / patio cover / carport permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Nunn project checklist
Describe your project once and get every permit, document, and fee it triggers in Nunn — in one checklist. Free, for any city and any number of projects.
Get started →