Change of Use / Change of Occupancy Permit — Nunn, Colorado · Requirements sheet
Verified 2026-08-14 · Source: https://townofnunn.colorado.gov/departments/building/planning
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Change of Occupancy Permit in Nunn, Colorado
The Town of Nunn does not publish a distinct 'Change of Use' permit application, checkbox, or fee line item, but a change of use is unambiguously permit-required: NMC 15.08.010 (General provisions) makes it 'unlawful to erect, construct, reconstruct, alter, move, locate, use, or change the use of any building or other structure within the town limits without obtaining a building permit.' The Town's own generic Building Permit Application states verbatim: 'Any change in the use or occupancy of the building must be approved prior to proceeding with consruction [sic].' A change of use is therefore processed through the identical Town Clerk's Office → SAFEbuilt intake used for every other Nunn permit type, marking 'Other' on the application's Type field and describing the occupancy change under 'Description of Work' and 'Proposed Use.' Substantively, occupancy classification changes fall under Chapter 10 ('Change of Occupancy') of the 2018 International Existing Building Code, adopted by reference at NMC 15.04.130 with no local amendment to that chapter. Separately, at the zoning level, NMC 17.40.040 (Change in use) restricts what a legally nonconforming use may change into.
Verified 2026-08-14 · Source
When you need this permit
- NMC 15.08.010: it is unlawful to 'use, or change the use of any building or other structure' within town limits without a building permit — a change of use requires a permit even absent new construction
- The Town's own Building Permit Application form states verbatim: 'Any change in the use or occupancy of the building must be approved prior to proceeding with consruction [sic]' — approval must be obtained before the new use/occupancy proceeds
- No dedicated 'change of use' checkbox exists on the application: the 'Type' field offers only New Build / Addition / Remodel / Other, and 'Proposed Use' offers Residential (One Family / Multi Family) or Commercial/Industrial (Shell Only / Tenant Finish); a change-of-use application marks 'Other' and describes the change under 'Description of Work'
- Substantively governed by Chapter 10 ('Change of Occupancy') of the 2018 International Existing Building Code, adopted by reference at NMC 15.04.130, chapters 1 through 16 inclusive, with no local amendment to Chapter 10 specifically (confirmed by reading NMC 15.04.130 in full: its only three amendments concern fire-code cross-references, the code title, and moved-structure conformance)
- At the zoning level, NMC 17.40.040 (Change in use) prohibits changing a legally nonconforming use to a use of lower or less restrictive classification; a nonconforming use may be changed only to a use of the same or higher classification
- As with all Nunn building permits, the application and any supporting description are submitted to the Town Clerk's Office (or emailed to kendra.minch@townofnunnco.gov), then forwarded to SAFEbuilt for review
- CONFIRMED ABSENCE (see also the residential-building-permit entry): Nunn has no distinct commercial-building or tenant-improvement (TI) permit type either — commercial/industrial 'Shell Only' or 'Tenant Finish' scopes, including any accompanying change of use, are processed through this same generic Building Permit Application
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection (if accompanying construction/alteration work)
Required where the change of use is accompanied by construction, alteration, or trade work; scheduled with SAFEbuilt. A pure occupancy-classification change with no physical construction may not require a SAFEbuilt field inspection, but Town approval is still required before the new use commences per the Building Permit Application's own terms
See the full Nunn inspection guide — scheduling & re-inspection fees →
Tips
- Get written Town approval on a change of use or occupancy BEFORE proceeding — the Town's own Building Permit Application explicitly conditions proceeding on prior approval, independent of whether construction is involved.
- There is no dedicated 'Change of Use Permit' form in Nunn — use the standard Building Permit Application, mark 'Other' under Type, and fully describe both the current and proposed use.
- If the space involves a legally nonconforming use, NMC 17.40.040 prohibits changing to a LOWER or less restrictive use classification — confirm zoning compatibility with the Town Clerk's Office before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-14.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nunn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Nunn
Change of Use / Change of Occupancy Permit in other cities
Compare change of use / change of occupancy permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Nunn project checklist
Describe your project once and get every permit, document, and fee it triggers in Nunn — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →