How to schedule
Inspections are requested through the building department below.
- Address
- 185 Lincoln Ave / P.O. Box 171, Nunn, CO 80648
- Phone
- 970-897-2385
- Office hours
- Town of Nunn does not publish standing office hours on the Building/Planning page or Town Clerk page; general contact is 970-897-2385 / town.clerk@townofnunnco.gov. Nunn has no dedicated Building Department staff — the Town Clerk's Office intakes all building permit applications and coordinates with the Planning Board (for structures over 120 sq ft) and SAFEbuilt (contracted plan review and inspections).
- Website
- Official site
Published scheduling rules
- Because SAFEbuilt (not town staff) performs plan review and all inspections, expect a genuinely separate scheduling and communication channel from the Town Clerk's Office — inspection requests go to windsor@safebuilt.com or 970-674-1036, not to Town Hall. (Residential Building Permit (New Construction))
- All inspections are performed by SAFEbuilt, not the Town; the owner/contractor is responsible for scheduling inspections directly with SAFEbuilt (Residential Building Permit (New Construction))
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation
Before concrete pour, per 30-inch minimum frost depth; scheduled directly with SAFEbuilt
- 2
Framing
Structural framing complete before cover
- 3
Insulation
Following installation of wall, ceiling, and floor insulation and exterior windows, before wall coverings are installed — added as IRC R109.1.5.2 by local amendment
- 4
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 5
Final Inspection
All work complete per approved plans and applicable codes
Applies to: Deck / Patio Cover / Carport Permit
- 1
Footing/Foundation
Before concrete pour, per 30-inch minimum frost depth
- 2
Framing
Structural framing and ledger connection (if attached) before cover
- 3
Final Inspection
Guardrails, stairs, and overall compliance verified
Applies to: Residential Addition / Remodel Permit
- 1
Rough Framing / Trade Rough-Ins
Framing, electrical, plumbing, and mechanical rough-ins before concealment, scheduled with SAFEbuilt
- 2
Insulation
Required if the scope adds or alters wall/ceiling/floor insulation or exterior windows
- 3
Final Inspection
All work complete per approved plans
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment; scheduled with SAFEbuilt
- 2
Final Inspection
Devices installed, panel labeled, system verified; electrician identity may be re-verified at inspector's discretion
Applies to: EV Charger / EVSE Permit
- 1
Rough Electrical
Circuit wiring and panel connection installed before concealment; scheduled with SAFEbuilt
- 2
Final Inspection
EVSE installed, devices verified, electrician identity may be re-verified at inspector's discretion
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical / Gas Piping Pressure Test
Ductwork, flues, equipment placement, and gas piping pressure test before concealment; scheduled with SAFEbuilt
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment; scheduled with SAFEbuilt
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
Applies to: Rooftop / Ground-Mounted Solar Photovoltaic Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before cover; scheduled with SAFEbuilt
- 2
Final Inspection
Racking, roof/ground penetrations, and electrical connections verified
Final inspection only: Demolition Permit, Re-Roof Permit
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nunn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Nunn building permits
Get alerts for Nunn
We'll email you when Nunn's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.