Commercial Building Permit (New Construction, Additions, Remodels & Tenant Finish) in Nunn, Colorado
Covers new commercial and industrial construction, commercial additions, and tenant-finish build-outs in the Town of Nunn. The Town publishes no distinct commercial-building or tenant-improvement permit product: NMC 15.08.020(a) requires a building permit for 'any building or structure' without naming a separate commercial procedure, and the Town's own Building Permit Application offers 'Commercial/Industrial — Shell Only / Tenant Finish' as a checkbox on the identical form used for residential work. A commercial project is submitted to the Town Clerk's Office and forwarded to SAFEbuilt, the Town's contracted plan-review and inspection provider, and is reviewed under the 2018 International Building Code (adopted by reference at NMC 15.04.020) rather than the 2018 IRC used for residential work. The Town does have a 'C Commercial District' and 'I Industrial District' at the zoning level (Municipal Code Title 17, Chapters 17.24 and 17.28), so commercial construction is a real, contemplated land use even though it shares its permitting product with residential.
Reviewed 2026-08-26 · Source
When you need this permit
- A building permit is required for any commercial or industrial building or structure under NMC 15.08.020(a), which does not distinguish by occupancy
- Plans must comply with the 2018 International Building Code, chapters 1 through 33 and appendix chapter 1, adopted by reference at NMC 15.04.020, as locally amended
- Planning Board approval is required before SAFEbuilt plan review begins for any structure over 120 sq ft; paperwork must be submitted to Town Hall at least 6 days before the Planning Board's first-Thursday-of-the-month, 6:00 p.m. meeting, and the applicant must personally attend or the request is tabled to the following month
- One set of plans (site plan, floor plan, and structural/electrical/mechanical/plumbing plans as applicable) submitted to the Town Clerk's Office or emailed to kendra.minch@townofnunnco.gov, marking 'Commercial/Industrial — Shell Only' or 'Tenant Finish' under Proposed Use on the Building Permit Application
- Once returned from SAFEbuilt, the Town emails an invoice with assessed fees; payment and authorization must be complete before work may begin
- All inspections are performed by SAFEbuilt, not the Town; the owner/contractor is responsible for scheduling inspections directly with SAFEbuilt
- A commercial structure that lacks a permanent heating system, insulation, or year-round usable plumbing is carved out as its own exception to the 'low energy buildings' provision of the Town's adopted energy code (2012 IECC, NMC 15.04.140, amending IECC section 101.5.1 to add this exception)
- Electrical and plumbing contractors on a commercial project must hold an active Colorado DORA state license, verified by the Town before the application is accepted, per the Town's Electrical/Plumbing License Contemporaneous Review Guidelines implementing C.R.S. 12-115-120 as amended by HB19-1086
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Town of Nunn 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage), 'Building Permits' section: 'Admin Fee (permits requiring plan review) $75.00' and 'Use Tax on all Building Permits 2%'. Show full citationHide
Town of Nunn 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage), 'Building Permits' section: 'Admin Fee (permits requiring plan review) $75.00' and 'Use Tax on all Building Permits 2%'. The Fee Schedule sets no commercial-specific line item and no separate commercial plan-review fee; a new commercial building or tenant-finish project always requires SAFEbuilt plan review, so the $75.00 plan-review tier governs the Town's own flat component. This is charged in addition to SAFEbuilt's separate valuation-based plan-review/inspection fee, which SAFEbuilt calculates per application and does not publish as a table for Nunn.Review timeline
Inspection process
- 1
Footing / Foundation
Before concrete pour, for new construction or additions; scheduled directly with SAFEbuilt
- 2
Framing
Structural framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans and applicable codes
See the full Nunn inspection guide — scheduling & re-inspection fees →
Tips
- There is no separate commercial-building or tenant-improvement application in Nunn — use the same Building Permit Application used for residential work and check 'Commercial/Industrial' under Proposed Use.
- Budget calendar time for Planning Board approval before SAFEbuilt plan review even begins, the same threshold and monthly cadence that applies to residential projects over 120 sq ft.
- The Town's Fee Schedule sets no commercial-specific dollar figure — only the general $75.00 plan-review Admin Fee plus 2% Use Tax is Town-published; get a written fee quote from the Town Clerk's Office or wait for the SAFEbuilt-calculated invoice before budgeting.
- Nunn's Title 15 building code has adopted no International Fire Code edition of its own (NMC 15.04.060 is reserved for fire code adoption); confirm fire review requirements directly with the Nunn Fire Protection District (970.897.2329), which publishes no fee schedule or submittal checklist of its own.
- A commercial structure lacking permanent heat, insulation, or year-round plumbing is exempted from the 'low energy buildings' provision of the Town's 2012 IECC energy code under a specific local amendment — confirm with SAFEbuilt whether a given shell or non-conditioned space qualifies before assuming full energy-code compliance is required.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-26.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nunn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Nunn.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Nunn
Commercial Building Permit (New Construction, Additions, Remodels & Tenant Finish) in other cities
Look up this fee in a different city →
Now live
Build your Nunn project checklist
Describe your project once and get every permit, document, and fee it triggers in Nunn — in one checklist. Free, for any city and any number of projects.
Get started →