EV Charger / EVSE Permit in Nunn, Colorado

The Town of Nunn does not publish a dedicated EV charger/EVSE permit type. Installation of a Level 2 EV charger is permitted under the Town's standard Electrical Permit, administered on the Town's behalf by its contracted plan-review/inspection provider, SAFEbuilt. As with all electrical work in Nunn, the Town verifies the installing electrician's Colorado DORA state electrical license before accepting the application (per C.R.S. 12-115-120(1)/(10), HB19-1086) — Nunn has no local electrical contractor licensing program of its own. The Town's 2026 Fee Schedule publishes a general two-tier Building Permit Admin Fee ($75 plan-review / $50 One Stop) plus a 2% Use Tax, but names no EV-specific line item, so no EV-specific dollar figure can be verified.

Reviewed 2026-07-23 · Source

When you need this permit

  • Electrical permit application must list the electrician's Colorado DORA state electrical license number; the Town verifies it is active before accepting the application
  • Governed by the National Electrical Code as adopted by reference in Nunn Municipal Code 15.04.040 (codified as the 2002 edition, though SAFEbuilt's current operational submittal guidance references the 2020 NEC — an unresolved discrepancy)
  • If the electrician performing the work changes before final inspection, the Town must be notified and will re-verify the new electrician's license
  • No EV-specific permit category, application, or dedicated fee line item is published by the Town of Nunn as of 2026-07-23 (the Town's general two-tier Building Permit Admin Fee structure applies instead — see fees below)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Town Admin Fee (Building Permit) + Use TaxPARTIALLY CLOSED 2026-07-23 on a live primary source: the Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked live from the Town homepage — not located in the 2026-07-06 or 2026-07-20 chases) establishes exactly two Building-Permit Admin Fee tiers Town-wide: 'Admin Fee (permits requiring plan review) $75.00' and 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00', plus 'Use Tax on all Building Permits 2%'. The schedule does not name EV chargers or a generic 'electrical permit' under either tier, so which flat fee applies is not Town-published; both real figures are reported. This is the Town Clerk's own flat component only — charged in addition to SAFEbuilt's separate valuation-based fee, which remains unpublished as a table.
$50.00 flat Admin Fee if processed as a 'One Stop' permit, or $75.00 if SAFEbuilt plan review is required, plus 2% Use Tax on all Building Permits. No EV-specific line item is published.

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Nunn?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Circuit wiring and panel connection installed before concealment; scheduled with SAFEbuilt

  2. 2

    Final Inspection

    EVSE installed, devices verified, electrician identity may be re-verified at inspector's discretion

See the full Nunn inspection guide — scheduling & re-inspection fees →

Tips

  • Confirm your electrician's Colorado DORA license is active BEFORE submitting — the Town rejects applications where the license cannot be verified online.
  • Nunn has no dedicated EV charger permit or EV-specific fee line item; the installation is billed and processed as a standard Electrical Permit through the Town's contracted provider, SAFEbuilt, under the Town's general $75/$50 Building Permit Admin Fee structure plus 2% Use Tax.

Frequently asked questions

Nunn requires an ev charger / evse permit for: Electrical permit application must list the electrician's Colorado DORA state electrical license number; the Town verifies it is active before accepting the application; Governed by the National Electrical Code as adopted by reference in Nunn Municipal Code 15.04.040 (codified as the 2002 edition, though SAFEbuilt's current operational submittal guidance references the 2020 NEC — an unresolved discrepancy); If the electrician performing the work changes before final inspection, the Town must be notified and will re-verify the new electrician's license; No EV-specific permit category, application, or dedicated fee line item is published by the Town of Nunn as of 2026-07-23 (the Town's general two-tier Building Permit Admin Fee structure applies instead — see fees below). If your project isn't listed, confirm with Town of Nunn Town Clerk's Office (Building/Planning) at 970-897-2385 before starting work.

No. There is no dedicated EV charger permit type in Nunn. An EV charger installation is permitted as standard electrical work under the Town's Electrical Permit, billed under the Town's general Building Permit Admin Fee ($75 plan-review / $50 One Stop, plus 2% Use Tax per the Town's 2026 Fee Schedule) — there is no EV-specific line item.

Nunn does not publish a plan-review timeline for this permit. Contact Town of Nunn Town Clerk's Office (Building/Planning) at 970-897-2385 for current turnaround.

You'll need: Building Permit Application (Electrical scope). See the required-documents checklist on this page for details on each.

Nunn requires 2 inspection(s) for an ev charger / evse permit, in order: Rough Electrical, Final Inspection. Schedule each through Town of Nunn Town Clerk's Office (Building/Planning) (970-897-2385).

Apply through Town of Nunn Town Clerk's Office (Building/Planning) at 185 Lincoln Ave / P.O. Box 171, Nunn, CO 80648. Phone: 970-897-2385, email: kendra.minch@townofnunnco.gov. Office hours: Town of Nunn does not publish standing office hours on the Building/Planning page or Town Clerk page; general contact is 970-897-2385 / town.clerk@townofnunnco.gov. Nunn has no dedicated Building Department staff — the Town Clerk's Office intakes all building permit applications and coordinates with the Planning Board (for structures over 120 sq ft) and SAFEbuilt (contracted plan review and inspections).. Official information: https://townofnunn.colorado.gov/departments/building/planning.

Nunn, Colorado has adopted: 2018 International Building Code (IBC), chapters 1-33 and appendix chapter 1, adopted by reference — Nunn Municipal Code (NMC) 15.04.020, as amended (Ord. No. 237 12-18-2003; Ord. No. 263 5-3-2007; Ord. No. 317 6-20-2019); 2018 International Residential Code (IRC), chapters 1-43 and appendix chapters H and M, adopted by reference — NMC 15.04.120, as amended (Ord. No. 237, 263, 317); 2018 International Mechanical Code (IMC), chapters 1-15, adopted by reference — NMC 15.04.030 (Ord. No. 237, 263, 317); 2018 International Plumbing Code (IPC), chapters 1-13, adopted by reference — NMC 15.04.050 (Ord. No. 237, 12-18-2003); 2018 International Fuel Gas Code (IFGC), chapters 1-8, adopted by reference — NMC 15.04.090 (Ord. No. 237, 263, 317); 2018 International Existing Building Code (IEBC), chapters 1-16, adopted by reference — NMC 15.04.130 (Ord. No. 263 5-3-2007; Ord. No. 317 6-20-2019); 2018 International Property Maintenance Code (IPMC), chapters 1-8, adopted by reference — NMC 15.04.150 (Ord. No. 317 6-20-2019); 2018 International Swimming Pool and Spa Code (ISPSC), chapters 1-11, adopted by reference — NMC 15.04.160 (Ord. No. 317 6-20-2019); 2012 International Energy Conservation Code (IECC), chapters 1-5, adopted by reference as the town energy conservation code — NMC 15.04.140 (Ord. No. 317 6-20-2019); IBC section 1301.1.1/101.4.6 and IRC chapter 11 are both explicitly amended to substitute the 2012 IECC as well; National Electrical Code, 2002 edition, adopted by reference — NMC 15.04.040 (codified text, unamended since original Code 2002 codification). NOTE: this is the currently codified NEC edition in the 2024 Nunn Municipal Code as republished by Ordinance No. 326 (adopted 6-20-2024, adopting/enacting the Municipal Code by reference). However, SAFEbuilt's own current 'Photovoltaic System Submittal Requirements' handout (the Town's contracted plan-review/inspection agency) states 'Applicable current codes are the 2020 NEC, 2018 International Codes' — a direct discrepancy between the codified 2002 NEC text and SAFEbuilt's operational reference. Flagged honestly rather than resolved by assumption; the governing citation is the codified 2002 NEC per NMC 15.04.040 pending confirmation from the Town.; Chapter 15.16 (Energy Efficiency Construction) of the Nunn Municipal Code additionally references the 1977/1978 Colorado Model Energy Efficiency Construction and Renovation Standards for Nonresidential Buildings and the companion Colorado Recommended Energy Conservation 'Performance' Code for Residential Buildings — these appear to be vestigial/superseded provisions retained from the original 2002 code codification and predate the town's adoption of the 2012 IECC at NMC 15.04.140 (2019); not applied as the governing energy standard in this file.. Local amendments apply — see the Nunn overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nunn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.