EV Charger / EVSE Permit in Nunn, Colorado
The Town of Nunn does not publish a dedicated EV charger/EVSE permit type. Installation of a Level 2 EV charger is permitted under the Town's standard Electrical Permit, administered on the Town's behalf by its contracted plan-review/inspection provider, SAFEbuilt. As with all electrical work in Nunn, the Town verifies the installing electrician's Colorado DORA state electrical license before accepting the application (per C.R.S. 12-115-120(1)/(10), HB19-1086) — Nunn has no local electrical contractor licensing program of its own. The Town's 2026 Fee Schedule publishes a general two-tier Building Permit Admin Fee ($75 plan-review / $50 One Stop) plus a 2% Use Tax, but names no EV-specific line item, so no EV-specific dollar figure can be verified.
Reviewed 2026-07-23 · Source
When you need this permit
- Electrical permit application must list the electrician's Colorado DORA state electrical license number; the Town verifies it is active before accepting the application
- Governed by the National Electrical Code as adopted by reference in Nunn Municipal Code 15.04.040 (codified as the 2002 edition, though SAFEbuilt's current operational submittal guidance references the 2020 NEC — an unresolved discrepancy)
- If the electrician performing the work changes before final inspection, the Town must be notified and will re-verify the new electrician's license
- No EV-specific permit category, application, or dedicated fee line item is published by the Town of Nunn as of 2026-07-23 (the Town's general two-tier Building Permit Admin Fee structure applies instead — see fees below)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Circuit wiring and panel connection installed before concealment; scheduled with SAFEbuilt
- 2
Final Inspection
EVSE installed, devices verified, electrician identity may be re-verified at inspector's discretion
See the full Nunn inspection guide — scheduling & re-inspection fees →
Tips
- Confirm your electrician's Colorado DORA license is active BEFORE submitting — the Town rejects applications where the license cannot be verified online.
- Nunn has no dedicated EV charger permit or EV-specific fee line item; the installation is billed and processed as a standard Electrical Permit through the Town's contracted provider, SAFEbuilt, under the Town's general $75/$50 Building Permit Admin Fee structure plus 2% Use Tax.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nunn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Nunn
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →