Mechanical / HVAC Permit — Nunn, Colorado · Requirements sheet
Verified 2026-07-23 · Source: https://townofnunn.colorado.gov/departments/building/planning
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Mechanical / HVAC Permit in Nunn, Colorado
Required for furnace, boiler, and gas piping installation or replacement in Nunn. Governed by the 2018 International Mechanical Code and 2018 International Fuel Gas Code as locally amended (e.g., 18-inch minimum plastic fuel gas pipe burial depth, 10 psig test pressure, 15-minute test duration for small-volume/single-family systems).
Verified 2026-07-23 · Source
When you need this permit
- Furnace installations/replacements, boiler installations/replacements, and gas piping over 10 feet in length all explicitly require a permit per the Town's own building-permit-needed list
- Governed by the 2018 IMC and 2018 IFGC as locally amended
- Gas piping test requirements per IFGC 406.4.1/406.4.2 as amended: 10 psig test pressure, minimum 15-minute test duration for systems under 10 cubic feet or single-family dwellings
- Plastic fuel gas piping must be buried at least 18 inches below grade per IFGC 404.12 as amended
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) explicitly lists 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00' — a direct,… Show full citationHide
The Town of Nunn's 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) explicitly lists 'Admin Fee (One Stop permits-re-roof, hot water heater etc.) $50.00' — a direct, named match to this permit type's water-heater/furnace-replacement scope — alongside 'Admin Fee (permits requiring plan review) $75.00' and 'Use Tax on all Building Permits 2%'. New-installation or larger mechanical scopes (e.g. gas piping runs over 10 feet) are not explicitly classified by the Town as 'One Stop,' so the plan-review tier may instead apply; both real figures are given here. This is the Town Clerk's own flat component only — charged in addition to SAFEbuilt's separate valuation-based fee, which is not published as a table.Review timeline
Inspection process
- 1
Rough Mechanical / Gas Piping Pressure Test
Ductwork, flues, equipment placement, and gas piping pressure test before concealment; scheduled with SAFEbuilt
- 2
Final Inspection
Equipment operational, combustion air and venting verified
See the full Nunn inspection guide — scheduling & re-inspection fees →
Tips
- Furnace/boiler/water heater REPLACEMENTS require a permit in Nunn just like new installations — the Town's own project list explicitly names 'Furnace installations or replacement,' 'Boiler installation or replacement,' and 'Water heater installations or replacement' as permit-required items, so don't assume a like-for-like swap is exempt.
- Gas piping runs over 10 feet trigger a permit requirement per the Town's own published project list.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fee schedules
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Nunn building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Nunn's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Nunn yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Nunn lands. Privacy.
Other permits in Nunn
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Nunn project checklist
Describe your project once and get every permit, document, and fee it triggers in Nunn — in one checklist. Free, for any city and any number of projects.