Residential Building Permit (New Construction) in Nunn, Colorado

Required for new single-family or duplex construction in the Town of Nunn. Reviewed under the 2018 IRC as locally amended, including Nunn's Climatic and Geographic Design Criteria (30 psf ground snow load, 115 mph wind design speed, 30-inch frost depth) and a Colorado-registered-design-professional foundation/soils requirement. Applications are submitted to the Town Clerk's Office and forwarded to SAFEbuilt (the Town's contracted plan-review/inspection agency) for plan review; projects require Planning Board approval before SAFEbuilt review begins.

Verified 2026-07-23 · Source

When you need this permit

  • Planning Board approval required before the application is forwarded to SAFEbuilt for plan review; paperwork must be submitted to Town Hall at least 6 days before the Planning Board's first-Thursday-of-the-month, 6:00 p.m. meeting, and the applicant must personally attend
  • Plans must comply with the 2018 IRC as locally amended and meet Nunn's Climatic and Geographic Design Criteria: 30 psf ground snow load, 115 mph wind design speed (Exposure C, Seismic Design Category B), 30-inch minimum frost depth, ice barrier underlayment required
  • Foundation design and construction drawings must be stamped by a Colorado-registered design professional, based on an engineer's soils report (firm name, design location, and soils-report number noted); a site certification by a Colorado-registered design professional is required for setback verification
  • One set of plans (site plan, floor plan showing square footage by level/garage/deck/porch/crawl space, and structural/electrical/mechanical/plumbing plans as applicable) submitted to the Town Clerk's Office or emailed to kendra.minch@townofnunnco.gov
  • Once returned from SAFEbuilt, the Town emails an invoice with assessed fees; payment (in person or by phone) and authorization must be complete before work may begin
  • All inspections are performed by SAFEbuilt, not the Town; the owner/contractor is responsible for scheduling inspections directly with SAFEbuilt
  • No distinct commercial-building-permit or tenant-improvement (TI) permit exists in Nunn: this same process, form, and fee structure is also used for new commercial/industrial construction and tenant-finish build-outs. The Town's own 'Building Permit Application' PDF (the identical form cited above) has a 'Proposed Use' section listing 'Commercial/Industrial — Shell Only / Tenant Finish' as a checkbox option directly alongside 'Residential: One Family / Multi Family' — confirming commercial and TI scopes route through this exact undifferentiated intake. Nunn Municipal Code Chapter 15.08 (Building Permits) itself is occupancy-agnostic: NMC 15.08.020(a) requires a permit for 'any building or structure, as defined by the building code for the town,' with no separate commercial process, fee schedule, or application named anywhere in Chapter 15.08. NMC Title 17 does establish a 'C Commercial District' (Ch. 17.24) and 'I Industrial District' (Ch. 17.28) at the zoning level, so commercial construction is a real, contemplated land use in Nunn — but no distinct commercial-permit type, admin-fee tier, or review-timeline SLA is published anywhere (checked the Building/Planning page, Chapter 15.08 in full, and the Town's 2026 Fee Schedule, which names only 'Admin Fee (permits requiring plan review) $75.00' and 'Admin Fee (One Stop permits) $50.00' under 'Building Permits,' with no commercial-specific line item). The 2018 IBC (adopted at NMC 15.04.020) would substantively govern a commercial/industrial occupancy's plan review versus the 2018 IRC for residential, but the intake process, application form, and Town-set admin-fee/use-tax structure are identical regardless of occupancy classification.

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Town Admin Fee (Building Permit, plan review required) + Use Tax
The Town of Nunn's own 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) lists under 'Building Permits': 'Admin Fee (permits requiring plan review) $75.00' and 'Use… Show full citationThe Town of Nunn's own 'Fee Schedule, Effective January 22nd, 2026' (PDF, linked from the Town homepage) lists under 'Building Permits': 'Admin Fee (permits requiring plan review) $75.00' and 'Use Tax on all Building Permits 2%'. New residential construction always requires SAFEbuilt plan review, so the plan-review tier governs. This is the Town Clerk's own flat administrative processing fee and use-tax rate — charged IN ADDITION TO, not instead of, SAFEbuilt's separate valuation-based plan-review/inspection fee, which SAFEbuilt calculates per application; no SAFEbuilt rate table specific to Nunn is published.
$75.00 flat Admin Fee (permits requiring plan review), plus 2% Use Tax on all Building Permits
Investigation Fee (work commenced before permit issuance)IRC R108.6 as locally amended; charged in addition to all other required fees, collected whether or not a permit is subsequently issued
Up to the amount of the permit fee that would normally apply
Permit Renewal After 180-Day ExpirationIRC R105.5 as locally amended
One-half the original permit fee (if within 1 year of suspension/abandonment, no plan changes); full new fee if lapsed longer

Review timeline

Plan review
Not published — contact the department

How long did your Residential Building Permit (New Construction) permit actually take in Nunn?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation

    Before concrete pour, per 30-inch minimum frost depth; scheduled directly with SAFEbuilt

  2. 2

    Framing

    Structural framing complete before cover

  3. 3

    Insulation

    Following installation of wall, ceiling, and floor insulation and exterior windows, before wall coverings are installed — added as IRC R109.1.5.2 by local amendment

  4. 4

    Rough Electrical / Plumbing / Mechanical

    Trade rough-ins before concealment

  5. 5

    Final Inspection

    All work complete per approved plans and applicable codes

See the full Nunn inspection guide — scheduling & re-inspection fees →

Tips

  • Budget calendar time for Planning Board approval BEFORE SAFEbuilt plan review even begins — paperwork is due 6 days ahead of the first-Thursday-of-month meeting, and the applicant must personally attend or the item gets tabled to the following month.
  • Because SAFEbuilt (not town staff) performs plan review and all inspections, expect a genuinely separate scheduling and communication channel from the Town Clerk's Office — inspection requests go to windsor@safebuilt.com or 970-674-1036, not to Town Hall.
  • There is no published fee schedule — get a written fee quote from the Town Clerk's Office or wait for the SAFEbuilt-calculated invoice before committing to a budget.
  • Foundation designs must be stamped by a Colorado-registered design professional and based on an engineer's soils report — this is a harder requirement than a simple prescriptive IRC foundation table in many peer small towns.
  • There is no separate commercial-building-permit or tenant-improvement (TI) permit in Nunn — a new commercial/industrial building or a tenant-finish build-out uses this identical Town Clerk-to-SAFEbuilt process and the same generic Building Permit Application (which itself has a 'Commercial/Industrial — Shell Only / Tenant Finish' checkbox), governed substantively by the 2018 IBC rather than the 2018 IRC.

Frequently asked questions

Nunn requires a residential building permit (new construction) for: Planning Board approval required before the application is forwarded to SAFEbuilt for plan review; paperwork must be submitted to Town Hall at least 6 days before the Planning Board's first-Thursday-of-the-month, 6:00 p.m. meeting, and the applicant must personally attend; Plans must comply with the 2018 IRC as locally amended and meet Nunn's Climatic and Geographic Design Criteria: 30 psf ground snow load, 115 mph wind design speed (Exposure C, Seismic Design Category B), 30-inch minimum frost depth, ice barrier underlayment required; Foundation design and construction drawings must be stamped by a Colorado-registered design professional, based on an engineer's soils report (firm name, design location, and soils-report number noted); a site certification by a Colorado-registered design professional is required for setback verification; One set of plans (site plan, floor plan showing square footage by level/garage/deck/porch/crawl space, and structural/electrical/mechanical/plumbing plans as applicable) submitted to the Town Clerk's Office or emailed to kendra.minch@townofnunnco.gov; Once returned from SAFEbuilt, the Town emails an invoice with assessed fees; payment (in person or by phone) and authorization must be complete before work may begin; All inspections are performed by SAFEbuilt, not the Town; the owner/contractor is responsible for scheduling inspections directly with SAFEbuilt; No distinct commercial-building-permit or tenant-improvement (TI) permit exists in Nunn: this same process, form, and fee structure is also used for new commercial/industrial construction and tenant-finish build-outs. The Town's own 'Building Permit Application' PDF (the identical form cited above) has a 'Proposed Use' section listing 'Commercial/Industrial — Shell Only / Tenant Finish' as a checkbox option directly alongside 'Residential: One Family / Multi Family' — confirming commercial and TI scopes route through this exact undifferentiated intake. Nunn Municipal Code Chapter 15.08 (Building Permits) itself is occupancy-agnostic: NMC 15.08.020(a) requires a permit for 'any building or structure, as defined by the building code for the town,' with no separate commercial process, fee schedule, or application named anywhere in Chapter 15.08. NMC Title 17 does establish a 'C Commercial District' (Ch. 17.24) and 'I Industrial District' (Ch. 17.28) at the zoning level, so commercial construction is a real, contemplated land use in Nunn — but no distinct commercial-permit type, admin-fee tier, or review-timeline SLA is published anywhere (checked the Building/Planning page, Chapter 15.08 in full, and the Town's 2026 Fee Schedule, which names only 'Admin Fee (permits requiring plan review) $75.00' and 'Admin Fee (One Stop permits) $50.00' under 'Building Permits,' with no commercial-specific line item). The 2018 IBC (adopted at NMC 15.04.020) would substantively govern a commercial/industrial occupancy's plan review versus the 2018 IRC for residential, but the intake process, application form, and Town-set admin-fee/use-tax structure are identical regardless of occupancy classification.. If your project isn't listed, confirm with Town of Nunn Town Clerk's Office (Building/Planning) at 970-897-2385 before starting work.

In Nunn, the published Town Admin Fee (Building Permit, plan review required) + Use Tax is: $75.00 flat Admin Fee (permits requiring plan review), plus 2% Use Tax on all Building Permits. Additional published fees: Investigation Fee (work commenced before permit issuance) — Up to the amount of the permit fee that would normally apply; Permit Renewal After 180-Day Expiration — One-half the original permit fee (if within 1 year of suspension/abandonment, no plan changes); full new fee if lapsed longer. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Nunn does not publish a plan-review timeline for this permit. Contact Town of Nunn Town Clerk's Office (Building/Planning) at 970-897-2385 for current turnaround.

You'll need: Building Permit Application; Site Plan / Plans Set; Engineer's Soils Report and Stamped Foundation Drawings; Planning Board Approval. See the required-documents checklist on this page for details on each.

Apply through Town of Nunn Town Clerk's Office (Building/Planning) at 185 Lincoln Ave / P.O. Box 171, Nunn, CO 80648. Phone: 970-897-2385, email: kendra.minch@townofnunnco.gov. Office hours: Town of Nunn does not publish standing office hours on the Building/Planning page or Town Clerk page; general contact is 970-897-2385 / town.clerk@townofnunnco.gov. Nunn has no dedicated Building Department staff — the Town Clerk's Office intakes all building permit applications and coordinates with the Planning Board (for structures over 120 sq ft) and SAFEbuilt (contracted plan review and inspections).. Official information: https://townofnunn.colorado.gov/departments/building/planning.

The Town of Nunn Town Clerk's Office intakes all building permit applications. Nunn is a statutory town with its own building-code program under Title 15 of its Municipal Code; it contracts plan review and all inspections to SAFEbuilt, a third-party building-code services provider, rather than employing its own building inspectors.

Yes, for any structure over 120 square feet. The Planning Board meets the first Thursday of the month at 6:00 p.m.; paperwork must be submitted at least 6 days beforehand and the applicant must attend in person. Only after Planning Board approval are plans forwarded to SAFEbuilt to begin permit/plan review.

No. Nunn Municipal Code Chapter 15.08 (Building Permits) is occupancy-agnostic and requires a single, undifferentiated permit for 'any building or structure' regardless of use. The Town's own Building Permit Application form has a 'Proposed Use' section offering 'Commercial/Industrial — Shell Only / Tenant Finish' as a checkbox alongside residential options, confirming commercial and TI work is processed through the exact same Town Clerk-to-SAFEbuilt intake, application form, and $75/$50 admin-fee-plus-2%-use-tax structure as residential permits — just reviewed against the 2018 IBC rather than the 2018 IRC. Nunn does have a 'C Commercial District' and 'I Industrial District' at the zoning level (Municipal Code Title 17, Chapters 17.24 and 17.28), so commercial construction is a real, contemplated land use, but no distinct commercial-permit type, fee tier, or review-timeline SLA is published anywhere.

Nunn's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Nunn yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Nunn lands. Privacy.