Sign Permit — Tremonton, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://tremontoncity.gov/chapter-1-27-sign-permit/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Tremonton, Utah
Required in Tremonton to erect, raise, move, place, reconstruct, extend, enlarge, alter, replace, or change the text of any sign, per Tremonton City Code Chapter 1.27 (Sign Permit). The flat Sign Permit fee is $50.00 per the city's Consolidated Fees & Fines Schedule. A Sign Permit may be submitted concurrently with a Building Permit, and it expires one year after approval unless a Building Permit, Business License, or other required permit is obtained.
Verified 2026-07-19 · Source
When you need this permit
- Only property owners or their duly authorized agents may apply, on forms approved by the Zoning Administrator (§ 1.27.015.A)
- Application must include the processing fee and all supporting materials required by Chapter 1.27; incomplete applications are not processed (§ 1.27.015.B)
- One digital copy, sized at a maximum of ledger (11" x 17"), of each sheet of the Site Plan (§ 1.27.015.C.1)
- Site Plan drawn to scale showing the proposed sign location, parking areas, landscaped areas, and buildings; if the sign is within 100 feet of a property line, those features must be shown for property within 100 feet of the sign (§ 1.27.020.A)
- Signs other than monument-style must have a minimum 8-foot clearance from walking areas and must not project over a property line, with limited exceptions (§ 1.27.010 area)
- No sign of any kind is allowed in a residential zone unless otherwise specifically noted in Chapter 1.27
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Tremonton inspection guide — scheduling & re-inspection fees →
Tips
- A Sign Permit may be submitted for approval concurrently with a Building Permit, but the city may deny the concurrent request and the applicant bears all risk of preparing both simultaneously, per § 1.27.015.D.
- A Sign Permit expires one year after approval and becomes invalid unless the property owner has obtained a Building Permit, Business License, or other required permit/license by then; a one-year extension is available if requested (with fee) before expiration, per § 1.27.070 area of Chapter 1.27.
- Certain signs are exempt from both the permit and the fee, including small name plates (48 sq in or less, name/address only) and private traffic-directional signs meeting size limits, per § 1.27.050.
- No signs of any kind are allowed in residential zones except as specifically provided in Chapter 1.27.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tremonton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tremonton
Sign Permit in other cities
Compare sign permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Tremonton project checklist
Describe your project once and get every permit, document, and fee it triggers in Tremonton — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →