EV Charger / EVSE Permit — Tremonton, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.utah.gov/pmn/files/1313443.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Tremonton, Utah
Tremonton City does not publish a distinct EV charger / EVSE fee line item. The city's Consolidated Fees and Fines Schedule (Resolution No. 25-42) prices a 'Small Scale Remodel or Construction — Electrical Inspection Only' category at a flat $60.00, which is the fee category an EV charger circuit installation would most plausibly fall under, but the city does not explicitly name EV chargers, EVSE, or electric vehicle charging in any published fee document.
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Tremonton City limits
- New dedicated 240V circuit and/or panel capacity to serve the charger, inspected under the National Electrical Code
- Permit application submitted through the city's CivicReview electronic portal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Rough-in and final inspection of the new circuit/panel work serving the charger, per Resolution No. 25-42's 'Electrical Inspection Only' category.
See the full Tremonton inspection guide — scheduling & re-inspection fees →
Tips
- Tremonton City has no EV-specific fee line — it does not appear in Resolution No. 25-42's fee tables under any section. The $60.00 flat 'Electrical Inspection Only' fee under Small Scale Remodel or Construction is the closest match for a standalone charger-circuit installation, but confirm treatment with the Building Department before applying, (435) 564-0897.
- If the EV charger is installed as part of a larger new-construction or remodel project, it will instead be covered by that project's 1%-of-valuation Permit Fee rather than the standalone $60.00 electrical-only fee.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tremonton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tremonton
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Tremonton project checklist
Describe your project once and get every permit, document, and fee it triggers in Tremonton — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →