Skip to main content
PermitBase

Change of Use / Change of Occupancy Permit in Tremonton, Utah

Tremonton does not publish a distinct 'change of use' permit type separate from its standard Building Permit. Tremonton City Code § 1.28.010 (Permit Required) states directly: 'UCA 10-9a-802(b) requires a Building Permit be issued to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure...' A change of use/occupancy is therefore processed as a standard Building Permit application under Chapter 1.28, culminating in a Certificate of Occupancy issued by the Building Official under § 1.28.050 once the structure is confirmed compliant with the adopted Building Code, City Ordinances, and any conditions of a prior Site Plan Permit or Conditional Use Permit. The City's Consolidated Fees and Fines Schedule (Resolution No. 25-42) has no dedicated 'change of use' or 'change of occupancy' fee line item -- a full-text review confirmed this.

Reviewed 2026-07-22 · Source

When you need this permit

  • Building Permit application required whenever a change of occupancy is proposed for an existing building or structure, per Tremonton City Code § 1.28.010 (citing UCA 10-9a-802(b))
  • Zoning Administrator review to confirm the new use conforms to zoning requirements, per § 1.28.035(A)
  • Building Official review to confirm the structure conforms to the adopted Building Code and City Ordinances for the new occupancy, per § 1.28.035(B)
  • Final inspection and issuance of a Certificate of Occupancy by the Building Official before the new use may commence, per § 1.28.050

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Permit Fee (valuation-based, if construction/alteration accompanies the use change)If the change of use involves construction or alteration work, Tremonton bills it under the same Section 3.1 (residential) or Section 3.3 (commercial/industrial/institutional/governmental) valuation-based Permit Fee structure used for new construction, per Resolution No. 25-42.
1% of Building Valuation (residential) or 1% of Building Valuation (commercial/industrial/institutional/governmental)
Inspections for which no fee is specifically indicatedResolution No. 25-42, Section 3.5 Miscellaneous Building Inspection Service Fees. This is the closest published catch-all fee category for a change-of-use/occupancy review with no accompanying construction valuation to base the standard percentage-based Permit Fee on; the schedule does not name 'change of use' or 'change of occupancy' specifically, so this category is not confirmed by the City to apply verbatim -- confirm directly with the Building Department, (435) 564-0897, before budgeting a specific project.
$75.00 per hour (minimum charge — one-half hour)

Review timeline

Plan review
Not published — contact the department

How long did your Change of Use / Change of Occupancy Permit permit actually take in Tremonton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection / Certificate of Occupancy

    The Building Official issues a Certificate of Occupancy upon passing final inspection and confirming compliance with the IBC, City Ordinances, and any conditions of a prior Site Plan Permit or Conditional Use Permit, per Tremonton City Code § 1.28.050.

See the full Tremonton inspection guide — scheduling & re-inspection fees →

Tips

  • Tremonton has no separate 'change of use' permit or fee -- a change of occupancy is a Building Permit under Tremonton City Code § 1.28.010, which explicitly lists 'change the occupancy of a building or structure' among the triggers requiring a Building Permit (citing UCA 10-9a-802(b)).
  • If a proposed change of use involves zoning-nonconformance, the Zoning Administrator must give the Building Official written notice of the conflict under § 1.28.035(A), and the Building Official may not issue the permit for that structure until resolved.
  • Where a change of use involves no construction/alteration work (so there is no Building Valuation to calculate the standard percentage-based Permit Fee from), Tremonton's fee schedule does not name a specific 'change of use' fee -- confirm treatment with the Building Department, (435) 564-0897, before applying.

Frequently asked questions

Tremonton requires a change of use / change of occupancy permit for: Building Permit application required whenever a change of occupancy is proposed for an existing building or structure, per Tremonton City Code § 1.28.010 (citing UCA 10-9a-802(b)); Zoning Administrator review to confirm the new use conforms to zoning requirements, per § 1.28.035(A); Building Official review to confirm the structure conforms to the adopted Building Code and City Ordinances for the new occupancy, per § 1.28.035(B); Final inspection and issuance of a Certificate of Occupancy by the Building Official before the new use may commence, per § 1.28.050. If your project isn't listed, confirm with Tremonton City Building Department (Community Development) at (801) 564-0897 before starting work.

No dedicated 'change of use' fee line item appears in Tremonton's Consolidated Fees and Fines Schedule (Resolution No. 25-42). If construction accompanies the use change, the standard valuation-based Permit Fee applies; if not, the closest published catch-all is the Section 3.5 'Inspections for which no fee is specifically indicated' rate of $75.00 per hour (one-half hour minimum) -- confirm with the Building Department before budgeting.

Tremonton does not publish a plan-review timeline for this permit. Contact Tremonton City Building Department (Community Development) at (801) 564-0897 for current turnaround.

You'll need: Building Permit Application (CivicReview); Floor Plan. Depending on your project, Tremonton may also ask for: Site/Plot Plan. See the required-documents checklist on this page for details on each.

Tremonton requires 1 inspection(s) for a change of use / change of occupancy permit, in order: Final Inspection / Certificate of Occupancy. Schedule each through Tremonton City Building Department (Community Development) ((801) 564-0897).

Apply through Tremonton City Building Department (Community Development) at 102 South Tremont Street, Tremonton, UT 84337. Phone: (801) 564-0897, email: connect@tremontoncity.gov. Office hours: Monday–Friday 9:00 AM – 5:00 PM (per Tremonton City Contact Us page); general offices closed Saturday–Sunday. Official information: https://tremontoncity.gov/government/plans/community-development/.

Tremonton, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Tremonton's own Building Criteria PDF (live-checked 2026-07-16, still hosted at the same URL, last modified April 2024) still lists '2021 International Building Code' and has not been updated to reflect the 7/1/2026 statewide edition change — the statute controls over the lagging city document.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 statewide amendment. Consistent with Tremonton's own Building Criteria document.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized in Tremonton's own Building Criteria document, added here per statute.; 2021 International Fire Code (IFC) — per Tremonton's own Building Criteria document; NOTE: the IFC is adopted under Utah Code Title 15A Chapter 5, not § 15A-2-103 (which governs the IBC/IRC/IPC/IMC/IFGC/IECC/IEBC/NEC/residential-ISPSC/MBI editions listed in this array) — § 15A-2-103 does not itself adopt or list an IFC edition, so this entry is unaffected by the 7/1/2026 § 15A-2-103 amendment.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Fuel Gas Code' and has not been updated.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Mechanical Code' and has not been updated.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Plumbing Code' and has not been updated.; 2021 International Property Maintenance Code (IPMC) — per the same document; not adopted or superseded by § 15A-2-103, which does not list an IPMC edition, so this entry is unaffected by the 7/1/2026 amendment; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 Energy Conservation Code' and has not been updated.; 2023 National Electrical Code (NEC) — CURRENT statewide per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (2023 has been the statewide NEC edition since before this cycle). Tremonton's own Building Criteria document (live-checked 2026-07-16, still hosted at the same URL) lists '2020 National Electrical Code,' which is NOT a valid statewide-adopted edition and has not been corrected by the City — the statute controls. Confirm the currently enforced NEC edition directly with the Building Department before relying on the City's own document for a live project.; 1997 Edition of the Uniform Code for the Abatement of Dangerous Buildings — per the same document; not governed by § 15A-2-103; 2017 Edition of the ICC/ANSI A117.1 Standard for Accessibility — per the same document; not governed by § 15A-2-103; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.; MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change from the prior cycle. Tremonton's own Building Criteria PDF (tremontoncity.gov/wp-content/uploads/2024/04/BUILDING-DESIGN-CRITERIA.pdf) was re-fetched live 2026-07-16 and still lists 2021 IBC/IFGC/IMC/IPC/'2021 Energy Conservation Code' and an outright incorrect '2020 National Electrical Code' — none of these have been updated by the City to reflect the statewide 7/1/2026 transition or the pre-existing 2023 NEC requirement. The statute is cited directly as governing throughout; the City's lagging document is preserved above as recorded history, not deleted.. Local amendments apply — see the Tremonton overview page for the full list.

Yes. Tremonton City Code § 1.28.010 states that a Building Permit is required to 'change the occupancy of a building or structure,' citing UCA 10-9a-802(b). Tremonton does not have a separate 'change of use' permit type -- it is processed as a standard Building Permit application under Chapter 1.28, ending in a Certificate of Occupancy issued under § 1.28.050.