Commercial / Industrial Building Permit in Tremonton, Utah

Required for new commercial and industrial construction in Tremonton. Requires professionally drawn plans wet-stamped by a State of Utah licensed Engineer or Architect. Uses the same valuation-based fee structure as residential but with a substantially higher plan review percentage.

Verified 2026-07-19 · Source

When you need this permit

  • New commercial, industrial, institutional, or governmental construction
  • Plans must be professionally drawn and include a Utah-licensed Engineer or Architect wet stamp prior to final review or permit issuance, per the City's official Building & Solar Permit Requirements page
  • Water rights dedication to the City required for Industrial, Commercial, Institutional, and Multi-Family Dwelling uses prior to permit issuance, per Tremonton City Code § 1.28.035(B)(7)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Permit Fee (valuation-based)Resolution No. 25-42, Section 3.3 'Industrial, Institutional, Commercial, & Governmental Inspection Fees'. Building Valuation determined per the most recent ICC Building Valuation Table.
1% of Building Valuation
State FeeResolution No. 25-42, Section 3.3.
1% of the Permit Fee
Plan Review Fee (commercial/industrial/institutional/governmental)Resolution No. 25-42, Section 3.4 'Industrial, Institutional, Commercial, & Governmental Plan Review Fees'. A $200.00 deposit is required with plan submission; no plan review costs are refunded once the review is completed.
65% of the Permit Fee and State Fee

Review timeline

Plan reviewTremonton’s published plan-review target
5–7 business days

How long did your Commercial / Industrial Building Permit permit actually take in Tremonton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building Inspection

    Scheduled by calling the City office at (435) 257-9500 to arrange an appointment with the Building Inspector.

  2. 2

    Final Inspection / Certificate of Occupancy

    Certificate of Occupancy issued upon passing final inspection and confirming Title II subdivision/development compliance, utility approvals, drainage, curb & gutter, street paving, sidewalks, and street signs, per Tremonton City Code § 1.28.050.

See the full Tremonton inspection guide — scheduling & re-inspection fees →

Tips

  • Commercial/industrial plan review carries a 65% plan review surcharge (of Permit Fee + State Fee) versus 35% for residential — a $200 deposit is due at submission and is non-refundable once review is complete.
  • All commercial and industrial plans must be drawn/engineered and wet-stamped by a licensed Architect and/or Structural Engineer in Utah — unlike residential, no owner-drawn plans are accepted.
  • Per the City's official Building & Solar Permit Requirements page, commercial plan review and permit processing take a minimum of 5-7 working days.

Frequently asked questions

Tremonton requires a commercial / industrial building permit for: New commercial, industrial, institutional, or governmental construction; Plans must be professionally drawn and include a Utah-licensed Engineer or Architect wet stamp prior to final review or permit issuance, per the City's official Building & Solar Permit Requirements page; Water rights dedication to the City required for Industrial, Commercial, Institutional, and Multi-Family Dwelling uses prior to permit issuance, per Tremonton City Code § 1.28.035(B)(7). If your project isn't listed, confirm with Tremonton City Building Department (Community Development) at (801) 564-0897 before starting work.

In Tremonton, the published Permit Fee (valuation-based) is: 1% of Building Valuation. Additional published fees: State Fee — 1% of the Permit Fee; Plan Review Fee (commercial/industrial/institutional/governmental) — 65% of the Permit Fee and State Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the City's official Building & Solar Permit Requirements page, commercial plan reviews and permit processing take a minimum of 5-7 working days, compared to 3-5 working days for residential.

You'll need: Architectural Plans and Cover Sheet; Structural Engineered Plan Set; Com-Check; ADA Accessibility Plan. Depending on your project, Tremonton may also ask for: Fire Sprinkler Plan. See the required-documents checklist on this page for details on each.

Tremonton requires 2 inspection(s) for a commercial / industrial building permit, in order: Building Inspection, Final Inspection / Certificate of Occupancy. Schedule each through Tremonton City Building Department (Community Development) ((801) 564-0897).

Apply through Tremonton City Building Department (Community Development) at 102 South Tremont Street, Tremonton, UT 84337. Phone: (801) 564-0897, email: connect@tremontoncity.gov. Office hours: Monday–Friday 9:00 AM – 5:00 PM (per Tremonton City Contact Us page); general offices closed Saturday–Sunday. Official information: https://tremontoncity.gov/government/plans/community-development/.

Tremonton, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Tremonton's own Building Criteria PDF (live-checked 2026-07-16, still hosted at the same URL, last modified April 2024) still lists '2021 International Building Code' and has not been updated to reflect the 7/1/2026 statewide edition change — the statute controls over the lagging city document.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 statewide amendment. Consistent with Tremonton's own Building Criteria document.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized in Tremonton's own Building Criteria document, added here per statute.; 2021 International Fire Code (IFC) — per Tremonton's own Building Criteria document; NOTE: the IFC is adopted under Utah Code Title 15A Chapter 5, not § 15A-2-103 (which governs the IBC/IRC/IPC/IMC/IFGC/IECC/IEBC/NEC/residential-ISPSC/MBI editions listed in this array) — § 15A-2-103 does not itself adopt or list an IFC edition, so this entry is unaffected by the 7/1/2026 § 15A-2-103 amendment.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Fuel Gas Code' and has not been updated.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Mechanical Code' and has not been updated.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Plumbing Code' and has not been updated.; 2021 International Property Maintenance Code (IPMC) — per the same document; not adopted or superseded by § 15A-2-103, which does not list an IPMC edition, so this entry is unaffected by the 7/1/2026 amendment; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 Energy Conservation Code' and has not been updated.; 2023 National Electrical Code (NEC) — CURRENT statewide per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (2023 has been the statewide NEC edition since before this cycle). Tremonton's own Building Criteria document (live-checked 2026-07-16, still hosted at the same URL) lists '2020 National Electrical Code,' which is NOT a valid statewide-adopted edition and has not been corrected by the City — the statute controls. Confirm the currently enforced NEC edition directly with the Building Department before relying on the City's own document for a live project.; 1997 Edition of the Uniform Code for the Abatement of Dangerous Buildings — per the same document; not governed by § 15A-2-103; 2017 Edition of the ICC/ANSI A117.1 Standard for Accessibility — per the same document; not governed by § 15A-2-103; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.; MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change from the prior cycle. Tremonton's own Building Criteria PDF (tremontoncity.gov/wp-content/uploads/2024/04/BUILDING-DESIGN-CRITERIA.pdf) was re-fetched live 2026-07-16 and still lists 2021 IBC/IFGC/IMC/IPC/'2021 Energy Conservation Code' and an outright incorrect '2020 National Electrical Code' — none of these have been updated by the City to reflect the statewide 7/1/2026 transition or the pre-existing 2023 NEC requirement. The statute is cited directly as governing throughout; the City's lagging document is preserved above as recorded history, not deleted.. Local amendments apply — see the Tremonton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tremonton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Tremonton.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.