Fire Alarm System Permit in Tremonton, Utah

Required for installation of fire alarm systems in Tremonton. As with fire sprinkler systems, Tremonton City's own Fire Department and Building & Solar Permit Requirements pages do not publish a local fire-alarm plan review process or fee, and no 'fire' line item appears anywhere in the City's Consolidated Fees and Fines Schedule (Resolution No. 25-42). Fire alarm plans for Tremonton projects are therefore submitted to the Utah State Fire Marshal's Office (Sandy, UT) using its separate, dedicated Fire Alarm Plan Review Submittal Form — a distinct form and checklist from the Automatic Fire Sprinkler Plan Submittal Form, indicating the State Fire Marshal's Office organizes fire alarm and fire sprinkler plan review as two separate submittal processes rather than one combined process.

Reviewed 2026-07-22 · Source

When you need this permit

  • Fire alarm system design, alteration, or new installation subject to the adopted Fire Code (Tremonton has adopted the 2021 International Fire Code per its Building Criteria document)
  • Floor plan indicating the size and use of all rooms, and the occupancy type of the building
  • Project code analysis and complete alarm system design documentation (see Documents)
  • Plan review fee paid to the Utah State Fire Marshal's Office before plan review is released

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 6 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fire Alarm Plan Review FeeUtah State Fire Marshal's Office Fire Alarm Plan Review Submittal Form: 'SQUARE FT x .022 = $______. Note: Minimum fee is $75.' Fees must be paid before plan review will be released. No separate or additional fire-alarm fee is published in Tremonton City's own Consolidated Fees and Fines Schedule (Resolution No. 25-42) — a full-text review found no 'fire' line item in that document.
$0.022 per square foot of review scope, $75.00 minimum

Review timeline

Plan review
Not published — contact the department

How long did your Fire Alarm System Permit permit actually take in Tremonton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Fire Alarm System Inspection

    Physical installation inspection is expected to be scheduled through Tremonton's Building Department at (435) 257-9500, the same contact used for all other Building Permit inspections in the City — Tremonton's own site does not separately document a fire-alarm-specific inspection procedure distinct from its general Building Inspection process.

See the full Tremonton inspection guide — scheduling & re-inspection fees →

Tips

  • Tremonton has no local fire marshal plan-review process or fee published on its own site — fire alarm plans are submitted directly to the Utah State Fire Marshal's Office (planreviews@utah.gov, (801) 256-2390), not to Tremonton City Hall.
  • The Fire Alarm Plan Review Submittal Form is a separate form from the Automatic Fire Sprinkler Plan Submittal Form, even though both carry the same $0.022/sq ft ($75 minimum) fee structure and are submitted to the same State Fire Marshal's Office address.
  • A project with both a fire alarm and a fire sprinkler system will require two separate submittals (and two separate minimum $75.00 fees) to the State Fire Marshal's Office, one per system.

Frequently asked questions

Tremonton requires a fire alarm system permit for: Fire alarm system design, alteration, or new installation subject to the adopted Fire Code (Tremonton has adopted the 2021 International Fire Code per its Building Criteria document); Floor plan indicating the size and use of all rooms, and the occupancy type of the building; Project code analysis and complete alarm system design documentation (see Documents); Plan review fee paid to the Utah State Fire Marshal's Office before plan review is released. If your project isn't listed, confirm with Tremonton City Building Department (Community Development) at (801) 564-0897 before starting work.

In Tremonton, the published Fire Alarm Plan Review Fee is: $0.022 per square foot of review scope, $75.00 minimum. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Tremonton does not publish a plan-review timeline for this permit. Contact Tremonton City Building Department (Community Development) at (801) 564-0897 for current turnaround.

You'll need: Fire Alarm Plan Review Submittal Form; Floor Plan (Room Size and Use); Project Code Analysis and Occupancy Type; Device Locations, Control/Trouble Signaling Equipment, and Annunciation; Electrical Design (Power, Battery, Conductor, Voltage Drop); Equipment Cut Sheets and Construction Details. See the required-documents checklist on this page for details on each.

Tremonton requires 1 inspection(s) for a fire alarm system permit, in order: Fire Alarm System Inspection. Schedule each through Tremonton City Building Department (Community Development) ((801) 564-0897).

Tremonton City does not publish its own fire-alarm plan review process or fee. Fire alarm plans are submitted to the Utah State Fire Marshal's Office (410 West 9800 South, 3rd Floor, Sandy, UT 84070; planreviews@utah.gov; (801) 256-2390) using its Fire Alarm Plan Review Submittal Form, at a fee of $0.022 per square foot with a $75.00 minimum -- a separate form and fee from the Automatic Fire Sprinkler Plan Submittal Form.

Tremonton, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Tremonton's own Building Criteria PDF (live-checked 2026-07-16, still hosted at the same URL, last modified April 2024) still lists '2021 International Building Code' and has not been updated to reflect the 7/1/2026 statewide edition change — the statute controls over the lagging city document.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 statewide amendment. Consistent with Tremonton's own Building Criteria document.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized in Tremonton's own Building Criteria document, added here per statute.; 2021 International Fire Code (IFC) — per Tremonton's own Building Criteria document; NOTE: the IFC is adopted under Utah Code Title 15A Chapter 5, not § 15A-2-103 (which governs the IBC/IRC/IPC/IMC/IFGC/IECC/IEBC/NEC/residential-ISPSC/MBI editions listed in this array) — § 15A-2-103 does not itself adopt or list an IFC edition, so this entry is unaffected by the 7/1/2026 § 15A-2-103 amendment.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Fuel Gas Code' and has not been updated.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Mechanical Code' and has not been updated.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Plumbing Code' and has not been updated.; 2021 International Property Maintenance Code (IPMC) — per the same document; not adopted or superseded by § 15A-2-103, which does not list an IPMC edition, so this entry is unaffected by the 7/1/2026 amendment; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 Energy Conservation Code' and has not been updated.; 2023 National Electrical Code (NEC) — CURRENT statewide per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (2023 has been the statewide NEC edition since before this cycle). Tremonton's own Building Criteria document (live-checked 2026-07-16, still hosted at the same URL) lists '2020 National Electrical Code,' which is NOT a valid statewide-adopted edition and has not been corrected by the City — the statute controls. Confirm the currently enforced NEC edition directly with the Building Department before relying on the City's own document for a live project.; 1997 Edition of the Uniform Code for the Abatement of Dangerous Buildings — per the same document; not governed by § 15A-2-103; 2017 Edition of the ICC/ANSI A117.1 Standard for Accessibility — per the same document; not governed by § 15A-2-103; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.; MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change from the prior cycle. Tremonton's own Building Criteria PDF (tremontoncity.gov/wp-content/uploads/2024/04/BUILDING-DESIGN-CRITERIA.pdf) was re-fetched live 2026-07-16 and still lists 2021 IBC/IFGC/IMC/IPC/'2021 Energy Conservation Code' and an outright incorrect '2020 National Electrical Code' — none of these have been updated by the City to reflect the statewide 7/1/2026 transition or the pre-existing 2023 NEC requirement. The statute is cited directly as governing throughout; the City's lagging document is preserved above as recorded history, not deleted.. Local amendments apply — see the Tremonton overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-22.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tremonton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.