Required for residential and commercial rooftop or ground-mounted solar photovoltaic installations in Tremonton. The City publishes a dedicated Solar Permit Requirements checklist distinct from its standard residential/commercial submittal lists.

Verified 2026-07-08 · Source

When you need this permit

  • Structural engineering letter confirming the roof or mounting structure can support the added solar array load
  • Site plan showing system layout
  • One-line electrical diagram
  • Module, inverter, and (if applicable) battery specifications
  • Signage plan for required solar disconnect/warning labeling
  • Interior and exterior photos of panels and system components

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 6 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Permit Fee (valuation-based, residential)Tremonton's fee resolution (No. 25-42) does not list a separate line-item solar fee; solar installations are billed under the same Section 3.1 Residential Dwelling & Residential Outbuilding valuation-based Permit Fee (1% of Building Valuation) plus the standard State Fee (1% of Permit Fee) that applies to all residential building permits. No dedicated 'solar permit' fee line exists in the official schedule as of Resolution 25-42 (08/26/2025).
1% of Building Valuation
State FeeResolution No. 25-42, Section 3.1, applies to all residential permits including solar.
1% of the Permit Fee

Review timeline

Plan reviewTremonton’s published plan-review target
3–5 business days

How long did your Solar Panel (PV) Permit permit actually take in Tremonton?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building/Electrical Inspection

    Scheduled by calling the City office at (435) 257-9500 to arrange an appointment with the Building Inspector.

See the full Tremonton inspection guide — scheduling & re-inspection fees →

Tips

  • Tremonton has no separate utility-owned net-metering process documented on its own site (unlike Murray, which has its own municipal power utility) — confirm interconnection requirements with the applicant's electric service provider (Rocky Mountain Power serves most of Tremonton) separately from the City building permit.
  • The Solar Permit Requirements checklist is distinct from residential/commercial checklists — a structural engineering letter is required for all solar installations regardless of system size.
  • Residential solar permits fall under the same 3-5 working day review estimate published for residential building permits generally; the City's Building & Solar Permit Requirements page does not publish a solar-specific timeline distinct from residential.

Frequently asked questions

Tremonton requires a solar panel (pv) permit for: Structural engineering letter confirming the roof or mounting structure can support the added solar array load; Site plan showing system layout; One-line electrical diagram; Module, inverter, and (if applicable) battery specifications; Signage plan for required solar disconnect/warning labeling; Interior and exterior photos of panels and system components. If your project isn't listed, confirm with Tremonton City Building Department (Community Development) at (801) 564-0897 before starting work.

No dedicated solar fee line item appears in Tremonton's official Consolidated Fees and Fines Schedule (Resolution No. 25-42). Residential solar installations are billed under the same valuation-based Permit Fee (1% of Building Valuation) and State Fee (1% of Permit Fee) that apply to residential building permits generally.

Tremonton's published plan-review target for a solar panel (pv) permit is 3–5 business days.

You'll need: Structural Engineering and Letter; Site Plan; One-Line Diagram; Module and Inverter Specifications; Signage Plan; Photos (Interior and Exterior Panels / System Components). Depending on your project, Tremonton may also ask for: Battery Specifications. See the required-documents checklist on this page for details on each.

Tremonton requires 1 inspection(s) for a solar panel (pv) permit, in order: Building/Electrical Inspection. Schedule each through Tremonton City Building Department (Community Development) ((801) 564-0897).

Apply through Tremonton City Building Department (Community Development) at 102 South Tremont Street, Tremonton, UT 84337. Phone: (801) 564-0897, email: connect@tremontoncity.gov. Office hours: Monday–Friday 9:00 AM – 5:00 PM (per Tremonton City Contact Us page); general offices closed Saturday–Sunday. Official information: https://tremontoncity.gov/government/plans/community-development/.

Tremonton, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Tremonton's own Building Criteria PDF (live-checked 2026-07-16, still hosted at the same URL, last modified April 2024) still lists '2021 International Building Code' and has not been updated to reflect the 7/1/2026 statewide edition change — the statute controls over the lagging city document.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did NOT change this edition in the 7/1/2026 statewide amendment. Consistent with Tremonton's own Building Criteria document.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized in Tremonton's own Building Criteria document, added here per statute.; 2021 International Fire Code (IFC) — per Tremonton's own Building Criteria document; NOTE: the IFC is adopted under Utah Code Title 15A Chapter 5, not § 15A-2-103 (which governs the IBC/IRC/IPC/IMC/IFGC/IECC/IEBC/NEC/residential-ISPSC/MBI editions listed in this array) — § 15A-2-103 does not itself adopt or list an IFC edition, so this entry is unaffected by the 7/1/2026 § 15A-2-103 amendment.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Fuel Gas Code' and has not been updated.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Mechanical Code' and has not been updated.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 International Plumbing Code' and has not been updated.; 2021 International Property Maintenance Code (IPMC) — per the same document; not adopted or superseded by § 15A-2-103, which does not list an IPMC edition, so this entry is unaffected by the 7/1/2026 amendment; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition. Tremonton's own Building Criteria document (live-checked 2026-07-16) still lists '2021 Energy Conservation Code' and has not been updated.; 2023 National Electrical Code (NEC) — CURRENT statewide per Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (2023 has been the statewide NEC edition since before this cycle). Tremonton's own Building Criteria document (live-checked 2026-07-16, still hosted at the same URL) lists '2020 National Electrical Code,' which is NOT a valid statewide-adopted edition and has not been corrected by the City — the statute controls. Confirm the currently enforced NEC edition directly with the Building Department before relying on the City's own document for a live project.; 1997 Edition of the Uniform Code for the Abatement of Dangerous Buildings — per the same document; not governed by § 15A-2-103; 2017 Edition of the ICC/ANSI A117.1 Standard for Accessibility — per the same document; not governed by § 15A-2-103; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.; MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized in Tremonton's own Building Criteria document, added here per statute since the City's own materials omit it.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change from the prior cycle. Tremonton's own Building Criteria PDF (tremontoncity.gov/wp-content/uploads/2024/04/BUILDING-DESIGN-CRITERIA.pdf) was re-fetched live 2026-07-16 and still lists 2021 IBC/IFGC/IMC/IPC/'2021 Energy Conservation Code' and an outright incorrect '2020 National Electrical Code' — none of these have been updated by the City to reflect the statewide 7/1/2026 transition or the pre-existing 2023 NEC requirement. The statute is cited directly as governing throughout; the City's lagging document is preserved above as recorded history, not deleted.. Local amendments apply — see the Tremonton overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tremonton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.