Skip to main content
PermitBase

Fence Permit in South Salt Lake, Utah

Required in South Salt Lake for any fence constructed of masonry material (any height) or exceeding 6 feet in height (any material); wood fences under 6 feet do not require a permit, per the city's official Building Permits FAQ. Governed by the zoning fence-height and clear-view standards in Title 17.

Verified 2026-07-23 · Source

When you need this permit

  • Masonry-material fence (any height) OR any fence over 6 feet tall (any material) — permit required
  • Wood fence under 6 feet tall — no permit required
  • Front-yard fences capped at 4 feet; corner-side-yard fences capped at 6 feet; rear-yard fences capped at 6 feet, per Municipal Code § 17.07.060.E — the current code has no separate, higher cap for non-corner side yards or for fences built 'with a building permit'
  • Clear-view area (sight-triangle) compliance required in all cases regardless of fence height

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fence Installation (Over-the-Counter Flat Fee, Commercial)South Salt Lake Consolidated Fee Schedule § 3.11.040.A, Over the Counter Flat Fees table: 'Fence installation ... $30.00' (listed identically under both the commercial and residential over-the-counter flat-fee lists).
$30.00
Concrete (block) with footing & rebar, or fences 7 feet or greaterSouth Salt Lake Consolidated Fee Schedule § 3.11.040.A, Over the Counter Flat Fees table: 'Concrete (block), with footing & rebar or fences 7 feet or greater ... $50.00.'
$50.00

Review timeline

Plan review
Not published — contact the department

How long did your Fence Permit permit actually take in South Salt Lake?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Scheduled Building Inspection

    Scheduled by calling (801) 483-6032; required for all permitted fence work per the city's official Building Permits FAQ.

See the full South Salt Lake inspection guide — scheduling & re-inspection fees →

Tips

  • A wood fence under 6 feet needs no permit at all in South Salt Lake — the permit requirement is specifically triggered by masonry material (any height) or exceeding 6 feet (any material), per the official Building Permits FAQ.
  • Fences over 7 feet, or any concrete-block fence with footing and rebar, are billed at the higher $50.00 flat fee rather than the standard $30.00 fence-installation flat fee.
  • Even a compliant-height fence must still meet Title 17's clear-view (sight-triangle) requirements at driveways and street corners.
  • Height caps by yard type, per Municipal Code § 17.07.060.E (confirmed live 2026-07-23): front yard 4 feet, corner side yard 6 feet, rear yard 6 feet. There is no code provision allowing an 8-foot fence in any yard, with or without a permit — that figure was corrected out of this dataset on 2026-07-23.

Frequently asked questions

Per the city's official Building Permits FAQ, a wooden fence under 6 feet does not require a permit. A fence made of masonry material (any height) or over 6 feet tall (any material) requires a building permit application, with a flat fee of $30.00 (or $50.00 for fences 7 feet or greater, or concrete-block fences with footing and rebar), per the Consolidated Fee Schedule.

In South Salt Lake, the published Fence Installation (Over-the-Counter Flat Fee, Commercial) is: $30.00. Additional published fees: Concrete (block) with footing & rebar, or fences 7 feet or greater — $50.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

South Salt Lake does not publish a plan-review timeline for this permit. Contact South Salt Lake Community Development Department, Building Permits Division at (801) 483-6063, ext. 2 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

South Salt Lake requires 1 inspection(s) for a fence permit, in order: Scheduled Building Inspection. Schedule each through South Salt Lake Community Development Department, Building Permits Division ((801) 483-6063, ext. 2).

Apply through South Salt Lake Community Development Department, Building Permits Division at 220 E Morris Avenue, Suite 150, South Salt Lake, UT 84115. Phone: (801) 483-6063, ext. 2, email: permits@sslc.gov, per the official Building Permit Application PDF (revised 05/01/26, sslc.gov/DocumentCenter/View/246); the Building Permits page (sslc.gov/215/Building-Permits) also offers a web contact form. Planning Division: planning@sslc.gov, confirmed via the official ADU Handbook (checked 2026-07-23).. Office hours: Mon–Fri 8:00 AM – 5:00 PM, per South Salt Lake's official Building Department contact listing. Inspection scheduling by phone at (801) 483-6032; Right-of-Way, Demolition, and Sign Permits handled via ext. 3.. Official information: https://sslc.gov/215/Building-Permits.

South Salt Lake, Utah has adopted: International Building Code (IBC) and International Residential Code (IRC), as adopted by the State of Utah and published by the International Code Council (ICC), adopted as the Building Code of South Salt Lake City together with Utah Administrative Code Rule R156-56, per South Salt Lake Municipal Code § 8.10.010 (Ord. No. 2020-06, § VI, 6-3-2020). Local amendments include: Appendix J of the 2012 IBC adopted with an added grading-permit requirement (§8.10.010.A); Appendix P of the 2006 IRC adopted (§8.10.010.B).; International Fire Code (IFC), as adopted by the State of Utah and published by ICC, adopted as the Fire Code of South Salt Lake City, including Appendix D, per Municipal Code § 8.10.020.; International Mechanical Code (IMC) and International Fuel Gas Code (IFGC), as adopted by the State of Utah and published by ICC, adopted as the Mechanical Code of South Salt Lake City, per Municipal Code § 8.10.040.; International Plumbing Code (IPC), as adopted by the State of Utah and published by ICC, adopted as the city's Plumbing Code, with Sections 106.1 and 107.1 of the 2012 IPC locally amended to require permits/fees per the consolidated fee schedule, per Municipal Code § 8.10.070.; National Electrical Code (NEC), as adopted by the National Fire Protection Association and the State of Utah, adopted as the Electrical Code of South Salt Lake City including all city and state amendments, per Municipal Code § 8.10.080.; Uniform Housing Code, 1997 edition (International Conference of Building Officials), adopted as the Housing Code of South Salt Lake City, per Municipal Code § 8.10.050.; Uniform Administrative Code (International Conference of Building Officials) adopted, with fee chapters applied only to the extent they do not conflict with South Salt Lake's own code, per Municipal Code § 8.10.060.; Uniform Code for Building Conservation (International Conference of Building Officials), adopted with all appendices, per Municipal Code § 8.10.090.; Uniform Code for the Abatement of Dangerous Buildings, 1997 edition (International Conference of Building Officials), adopted per Municipal Code § 8.10.100.; All technical codes above are adopted by reference except where they conflict with Utah Code Title 15A and the technical codes adopted therein (the statewide framework), per Municipal Code § 8.10.010.F.. Local amendments apply — see the South Salt Lake overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Salt Lake building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.