Solar Panel / Photovoltaic (PV) Installation Permit in South Salt Lake, Utah
South Salt Lake tracks rooftop, ground-mount, and carport-mount solar photovoltaic (PV) installations — including battery-storage additions to existing solar — as their own distinct permit-type case category, labeled 'Solar Panels' and issued under a dedicated 'SP' permit-number prefix (e.g. SP25-0903, SP25-0923, SP25-0870, SP25-0935, SP25-0918, SP25-0959), confirmed directly in the city's own official monthly Community Development Permit Reports published on sslc.gov. However, the Consolidated Fee Schedule § 3.11.040.A contains no distinct 'solar' or 'photovoltaic' fee line item — confirmed by a direct full-text check of the fee schedule on 2026-07-21, which turned up zero mentions of 'solar' or 'photovoltaic.' Solar installations are instead billed under the same city-wide valuation-based Building Permit Fee formula used for other non-flat-fee, valuation-tracked work: Building Fee (B) = local multiplier x project valuation; Plan Check Fee (P) = B x 0.65; State Surcharge Fee (Y) = B x 0.01. This is confirmed by the city's own Building Permit Application, which requires a 'Valuation of Project (Not New Construction – Includes Labor and Materials)' field for exactly this kind of work, and corroborated by the real dollar valuations recorded against 'Solar Panels' (SP) permits in the city's official November 2025 permit report — e.g. $499,113.00 for a Creative Energies solar expansion/new-building install, $41,974.00 for a Spring Solar 7.2 kW/18-panel array, and $22,300.00 for an ES Solar battery addition to an existing system — unlike the flat-fee 'Residential/Commercial Counter Review' trade permits (fences, reroofs, AC/furnace/water-heater swaps) in the same report, which carry no valuation figure at all.
Verified 2026-07-21 · Source
When you need this permit
- Rooftop, ground-mount, or carport-mount solar PV system installation, or a battery-storage addition to an existing solar system, filed under the city's dedicated 'Solar Panels' (SP) permit-type case category
- Building Permit Application submitted with a completed 'Valuation of Project' figure (installed cost including labor and materials), used to calculate the Building Fee per Consolidated Fee Schedule § 3.11.040.A
- Compliance with the adopted National Electrical Code (NEC) per Municipal Code § 8.10.080 for PV wiring/interconnection work
- Compliance with the adopted IBC/IRC per Municipal Code § 8.10.010 for roof-mount structural attachment
- Electrical Contractor (and General Contractor, where applicable) name and state license number listed on the Building Permit Application
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Scheduled Building/Electrical Inspection
PV system electrical rough-in/interconnection and roof-mount structural attachment inspected before final sign-off; scheduled by calling (801) 483-6032, per the city's official Building Permits FAQ inspection-scheduling process.
See the full South Salt Lake inspection guide — scheduling & re-inspection fees →
Tips
- South Salt Lake tracks solar installations under a dedicated 'Solar Panels' permit-type case prefix ('SP'), separate from its Building Permit (RBP/CBP) and Counter Review (RC/CC) categories, per the city's own official monthly Community Development Permit Reports.
- Despite having its own case-type label, solar PV installation has no distinct fee line in the Consolidated Fee Schedule — it is billed via the same valuation-based Building Fee + Plan Check Fee (65%) + State Surcharge Fee (1%) formula as new construction, based on the installed project cost (labor and materials) entered on the Building Permit Application.
- Battery-storage additions to an existing solar system are also filed under the same 'Solar Panels' permit-type category, per real permit records (e.g. an ES Solar filing described as 'Adding a Battery with existing solar').
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Salt Lake building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in South Salt Lake
Solar Panel / Photovoltaic (PV) Installation Permit in other cities
Compare solar panel / photovoltaic (pv) installation permit fees across Utah →
Look up this fee in a different city →
Now live
Build your South Salt Lake project checklist
Describe your project once and get every permit, document, and fee it triggers in South Salt Lake — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →