Commercial Building Permit — South Salt Lake, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://sslc.gov/215/Building-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit in South Salt Lake, Utah
Required for new commercial construction and structural work in South Salt Lake, regulated by the city's adopted IBC (Municipal Code § 8.10.010) and reviewed against the city's own published Commercial Plan Submittal Checklist. The Total Building Permit Fee uses the same city-wide valuation formula as the Residential Building Permit — Building Fee (B) = local multiplier x Gross ICC Building Valuation Data (ICCBVD) valuation; Plan Check Fee (P) = B x 0.65; State Surcharge Fee (Y) = B x 0.01 — per Consolidated Fee Schedule § 3.11.040.A.
Verified 2026-07-19 · Source
When you need this permit
- New commercial construction or structural work regulated by the city's adopted IBC (Municipal Code § 8.10.010) and International Fire Code (§ 8.10.020)
- Complete application submitted through the city's Building Permits process (220 E Morris Avenue, Suite 150)
- Commercial Plan Submittal Checklist items addressed: cover sheet with code/occupancy analysis, plan criteria (allowable areas/heights, occupancy separations, egress, rated walls/openings), site plan, structural sheets, plumbing/mechanical/electrical plans, and — where applicable — a geotechnical (soils) report and civil engineering plans (roads, utilities, storm drainage)
- Plan Check Fee due at time of building permit application; Building Fee and State Surcharge Fee due prior to permit issuance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
South Salt Lake Consolidated Fee Schedule § 3.11.040.A (Ord. Show full citationHide
South Salt Lake Consolidated Fee Schedule § 3.11.040.A (Ord. No. 2020-02, § V(Exh. D), 1-8-2020, as amended through Ord. No. 2025-17, § 1(Exh. A), 5-28-2025) — this is the same city-wide valuation-based formula used for the Residential Building Permit; South Salt Lake does not publish a separate commercial-only formula. No fixed local multiplier value was published in the fee schedule text itself.Review timeline
Inspection process
- 1
Foundation / Structural
Verified against the submitted structural sheets and specifications before concrete pour, per the Commercial Plan Submittal Checklist.
- 2
MEP Rough-In
Plumbing, mechanical, and electrical rough-in verified against the submitted DWV isometric, equipment schedule, and service one-line diagram.
- 3
Fire System
Deferred-submittal fire protection systems (automatic fire sprinkler, fire pump, standpipe, fire alarm, clean agent/dry chemical systems) inspected per the Commercial Plan Submittal Checklist's Fire section.
- 4
Scheduled Building Inspections / Final
Scheduled by calling (801) 483-6032, per the city's official Building Permits FAQ. Certificate of Occupancy issued once work is found compliant.
See the full South Salt Lake inspection guide — scheduling & re-inspection fees →
Tips
- South Salt Lake's Commercial Plan Submittal Checklist requires a design professional stamp and signature for plans 3,000 sq ft or more.
- The city commits to reviewing all complete building permit applications — commercial included — within 15 business days, per its official FAQ.
- Starting construction before permit approval triggers an additional fee equal to 100% of the Building Fee, separate from any code-violation penalties, per Consolidated Fee Schedule § 3.11.040.A.
- Building/Plan Check Fees include an initial review plus two subsequent reviews at no extra charge; additional review beyond that is billed at $56.00/hour.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Salt Lake building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in South Salt Lake.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
South Salt Lake's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for South Salt Lake yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when South Salt Lake lands. Privacy.
Other permits in South Salt Lake
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →